HYDROLOGICAL TIME SERIES GENERATION IN INDIAN CONTEXT

Slides:



Advertisements
Similar presentations
Hydrologic Statistics
Advertisements

Integrated Approaches for Runoff Forecasting Ashu Jain Department of Civil Engineering Indian Institute of Technology Kanpur Kanpur-UP, INDIA.
Lucinda Mileham, Dr Richard Taylor, Dr Martin Todd
Evaluating Potential Impacts of Climate Change on Surface Water Resource Availability of Upper Awash Sub-basin, Ethiopia rift valley basin. By Mekonnen.
Mechanistic crop modelling and climate reanalysis Tom Osborne Crops and Climate Group Depts. of Meteorology & Agriculture University of Reading.
Continuous Hydrologic Simulation of Johnson Creek Basin and Assuming Watershed Stationarity Rick Shimota, P.E. Hans Hadley, P.E., P.G. The Oregon Water.
Dennis P. Lettenmaier Lan Cuo Nathalie Voisin University of Washington Climate Impacts Group Climate and Water Forecasts for the 2009 Water Year October.
Data Sources The most sophisticated forecasting model will fail if it is applied to unreliable data Data should be reliable and accurate Data should be.
Onondaga County Regional Stream Simulation Study Dan Coyle Major Prof. – Dr. Hassett MPS Degree.
Hydrological Modeling FISH 513 April 10, Overview: What is wrong with simple statistical regressions of hydrologic response on impervious area?
Hydrologic/Watershed Modeling Glenn Tootle, P.E. Department of Civil and Environmental Engineering University of Nevada, Las Vegas
Engineering Hydrology (ECIV 4323)
Slides 13b: Time-Series Models; Measuring Forecast Error
Impact of Climate Change on Flow in the Upper Mississippi River Basin
Hydrologic Statistics
Box Jenkins or Arima Forecasting. H:\My Documents\classes\eco346\Lectures\chap ter 7\Autoregressive Models.docH:\My Documents\classes\eco346\Lectures\chap.
Geostatistical approach to Estimating Rainfall over Mauritius Mphil/PhD Student: Mr.Dhurmea K. Ram Supervisors: Prof. SDDV Rughooputh Dr. R Boojhawon Estimating.
Hydrologic Modeling: Verification, Validation, Calibration, and Sensitivity Analysis Fritz R. Fiedler, P.E., Ph.D.
Streamflow Predictability Tom Hopson. Conduct Idealized Predictability Experiments Document relative importance of uncertainties in basin initial conditions.
Watershed Hydrology Modeling: What is Considered Calibrated? Presented by: Jeremy Wyss, HIT Tetra Tech Presented by: Jeremy Wyss, HIT Tetra Tech 27 th.
Regional climate prediction comparisons via statistical upscaling and downscaling Peter Guttorp University of Washington Norwegian Computing Center
Patapsco/Back River SWMM Model Part I - Hydrology Maryland Department of the Environment.
CE 424 HYDROLOGY 1 Instructor: Dr. Saleh A. AlHassoun.
Quality control of daily data on example of Central European series of air temperature, relative humidity and precipitation P. Štěpánek (1), P. Zahradníček.
Engineering Hydrology (ECIV 4323)
State Board Modeling Needs and Interests Eric Berntsen, PH, CPESC, CPSWQ State Water Resources Control Board CWEMF Hydrology and Watershed Modeling Workshop.
Surface Water Surface runoff - Precipitation or snowmelt which moves across the land surface ultimately channelizing into streams or rivers or discharging.
P B Hunukumbura1 S B Weerakoon1
Forecasting is the art and science of predicting future events.
DOWNSCALING GLOBAL MEDIUM RANGE METEOROLOGICAL PREDICTIONS FOR FLOOD PREDICTION Nathalie Voisin, Andy W. Wood, Dennis P. Lettenmaier University of Washington,
VERIFICATION OF A DOWNSCALING SEQUENCE APPLIED TO MEDIUM RANGE METEOROLOGICAL PREDICTIONS FOR GLOBAL FLOOD PREDICTION Nathalie Voisin, Andy W. Wood and.
FORECASTIN G Qualitative Analysis ~ Quantitative Analysis.
LOAD FORECASTING. - ELECTRICAL LOAD FORECASTING IS THE ESTIMATION FOR FUTURE LOAD BY AN INDUSTRY OR UTILITY COMPANY - IT HAS MANY APPLICATIONS INCLUDING.
Sanitary Engineering Lecture 4
Forecasting. Model with indicator variables The choice of a forecasting technique depends on the components identified in the time series. The techniques.
Welcome to MM305 Unit 5 Seminar Dr. Bob Forecasting.
BUILDING AND RUNNING THE HYDROLOGICAL MODEL
Multiple Random Variables and Joint Distributions
Upper Rio Grande R Basin
RAINGUAGE NETWORK DESIGN
Digital model for estimation of flash floods using GIS
Precipitation-Runoff Modeling System (PRMS)
DES 606 : Watershed Modeling with HEC-HMS
DES 606 : Watershed Modeling with HEC-HMS
Engineering Hydrology (ECIV 4323)
in the Neversink River Basin, New York
“The Art of Forecasting”
Looking for universality...
Rainfall-Runoff Modeling
Hydrologic Simulation Models
Image courtesy of NASA/GSFC
Hydrologic River Routing
Application of satellite-based rainfall and medium range meteorological forecast in real-time flood forecasting in the Upper Mahanadi River basin Trushnamayee.
Hydrologic Simulation Models
Introduction to Instrumentation Engineering
150 years of land cover and climate change impacts on streamflow in the Puget Sound Basin, Washington Dennis P. Lettenmaier Lan Cuo Nathalie Voisin University.
Kostas M. Andreadis1, Dennis P. Lettenmaier1
Dhouha Ouali, Ph.D. Research associate, MEOPAR-PCIC
Hydrologic Statistics
Overview of Models & Modeling Concepts
Forecasting Qualitative Analysis Quantitative Analysis.
Hydrology CIVL341.
Engineering Hydrology (ECIV 4323)
WRE-1 BY MOHD ABDUL AQUIL CIVIL ENGINEERING.
Hydrology CIVL341 Introduction
Facultad de Ingeniería, Centro de Cálculo
Engineering Hydrology (ECIV 4323)
Hydrology Modeling in Alaska: Modeling Overview
Time Series introduction in R - Iñaki Puigdollers
A FRAMEWORK TO ASSESS EFFECTIVENESS AND RISKS OF INTEGRATED RESERVOIR OPERATION FOR FLOOD MANAGEMENT CONSIDERING ENSEMBLE HYDROLOGICAL PREDICTION XVI World.
Presentation transcript:

HYDROLOGICAL TIME SERIES GENERATION IN INDIAN CONTEXT Dr. R N Sankhua Director National Water Academy, Central Water Commission India

STATUS OF WATER RESOURCES IN INDIA India occupies only 3.29 million Ha area, (2.4%) of world's land area. 4% of water resources of the World. supports over 16% of the world's population. livestock population 500 million, 15% of world's total WR documentation of India at www.cwc.nic.in www.india-water.com/ffs/index.htm

River Basins in India

SWOT analysis of Water Resources Strength India is gifted with large number of rivers 4000 BCM of water available Long-term average annual rainfall is 1160 mm, which is the highest anywhere in the world for a country of comparable size Annual precipitation of about 4000 BCM, including snowfall. monsoon rainfall 3000 BCM Highest rainfall (11,690 mm) recorded at Mousinram near Cherrapunji in Meghalaya in northeast Weakness Spatial and temporal distribution 690 BCM is utilizable form Storage insufficient to meet the demand Monsoon failure or excess rainfall in one monsoon

Event-Based Models RAINFALL Usually based on statistical analysis Sometimes, historical storm information used WATERSHED CHARACTERISTICS Relationship between rainfall and runoff identified (e.g. Rational Method “C” factor, Runoff CN). coefficients depend on soil infiltration rate, vegetation, land use, soil type, imperviousness, etc

Continuous Simulation Models Use long term rainfall record (20-30 years) and simulate flows for entire period of record Incorporate ET0 and infiltration estimates – simulate water balance HEC-HMS, SWMM, SWAT, HYMOS, Arc-CN runoff for predicting variability in flow based on event/long term observed hydrologic data

Meteorologic Model - contains rainfall & ET0 data Using HEC-HMS 11/14/2018 Three components Basin model - contains elements of basin, connectivity, runoff parameters Meteorologic Model - contains rainfall & ET0 data Control Specifications - contains start/stop timing and calculation intervals for the run

Using SWMM SWMM Visual Objects - distributed, dynamic rainfall-runoff simulation model used for single event or long-term (continuous) simulation of runoff quantity and quality from primarily urban areas.

Conventional Models of Synthetic Stream flow generation AR (Auto Regression) AR(1) -1st order AR(2) -2nd order ARMA (Auto Regression Moving Average) ARIMA (Auto Regression Integrated Moving Average) - EVIEWS THOMAS-FIERRING MODEL All the models use the statistical properties of the inflow Used for monthly, seasonal & annual inflow prediction                                                                                                                                   

All stationary time series can be modeled as AR or MA or ARMA models constant  and 2 If a time series is not stationary it is often possible to make it stationary by using fairly simple transformations Forecasts can be either in-sample or out-of-sample forecasts.

Conventional Models Stream flow generation Periodical component,(parameters show variation) Trend component (increase or decrease of process parameters (mean & std deviation) with time) Independent (random) components & dependant components

AR Models of Synthetic Stream flow generation Produce sequences of streamflows at multi sites for low forecast horizon Synthetic streamflows must behave statistically similar to historical values and be consistent with seasonal volume forecasts

THOMAS-FIERRING MODEL PARAMETERS Back

River Flow Forecasting - Krishna 11/14/2018 Learning a model from existing data (e.g. observations of the period from 1987 to 2000) The resultant model will be used to forecast future behaviour 15

11/14/2018 16

Non-stationary Time series Linear trend Nonlinear trend Multiplicative seasonality Heteroscedastic error terms (non constant variance)

Making them stationary Linear trend Take non-seasonal difference. What is left over will be stationary AR, MA or ARMA Non-Linear trend Exponential growth Take logs – this makes the trend linear Take non-seasonal difference

Multiplicative seasonality & Heteroscedsatic errors Taking logs Multiplicative seasonality often occurs when growth is exponential. Take logs then a seasonal difference to remove trend

Soft techniques for Synthetic Streamflow generation Neural Network Using ANN technique Using daily flow data Training of network Validating network Predicting flow Back Propagation Xi Xm yi yn Error Fuzzy logic ANFIS

ANN model developed for predicting daily Ref-ETr Input Layer Hidden Layer Output Layer Wind speed in km/hr Minimum Temperature in ° C Maximum Temperature in ° C Mean Relative Humidity in % REF-ET in mm/day ANN model developed for predicting daily Ref-ETr 11/14/2018

Stage- Discharge (DIBRUGARH- Brahmaputra river) 11/14/2018 Nash : 0.9864 RMSE: 0.816 1-4-1

Model Parameters (DIBRUGARH) 11/14/2018 Training Target Output AE ARE Mean: 7.324 7.307 1.931 0.460 Std Dev: 6.460 6.069 1.649 0.501 Min: 0.928 1.958 0.026 0.004 Max: 25.025 25.15 7.149 3.326 C 0.92 Validation 10.194 10.63 1.823 0.480 7.462 6.313 2.345 1.014 1.242 1.960 0.165 0.008 25.36 9.102 4.44 Testing 7.015 7.075 3.267 0.688 6.655 5.256 2.880 0.661 1.448 1.956 0.481 0.072 20.55 18.88 8.7225 2.22 0.85 C = Correlation coefficient, AE = Absolute Error = (Target value - desired value), ARE = Absolute Relative Error = (Target value - desired value)/(Target value)

MODELS FOR REAL-TIME STAGE FORECAST 11/14/2018 Brahmaputra Pancharatna Pandu Station Input data Desired output data Travel time Pandu (t)th day stages (Pandu) (t-1)th day stages (Pandu) (t+1)th day Stages (Pandu) Pancharatna (t)th day stages (Pancharatna) (t+1)th day Stages (Pancharatna) 1 day (from Pandu) Dhubri (t)th day stages (Dhubri) (t+1)th day Stages (Dhubri) 1 day (from Pancharatna)

ARCHITECTURE OF MODELS FOR STAGE FORECAST 11/14/2018 Neural Network model for Pandu Neural Network model for Pancharatna Neural Network model for Dhubri

REAL-TIME STAGE FORECAST (PANDU) 11/14/2018 = 0.9659 2002 = 0.011

Stage-Discharge (h & Q) Nine Gaussian MF - IP/OP 11/14/2018 Using Fuzzy logic Data-1998 to 2002 Stage-Discharge (h & Q) Nine Gaussian MF - IP/OP Pancharatna Pandu 11/14/2018

FUZZY LOGIC (MFS & VALIDATION) 11/14/2018 11/14/2018

FUZZY LOGIC (RULE VIEWER) 11/14/2018 11/14/2018

11/14/2018 11/14/2018

Regression eqn between gauged & ungauged locations Digital Precipitation Model calculated relationship P=115.6+0.258h Conclusion: Data driven modelling, coupled with physical insights about the system, will produce more reliable results for medium-and long-term predictions.

11/14/2018 THANK YOU 32