<PROJECT NAME> THEME STAKEHOLDERS BACKGROUND CURRENT CONDITION

Slides:



Advertisements
Similar presentations
Strategic Planning Process: An Overview
Advertisements

Istanbul Forum Country Exercise: Standard slides for country delegations.
Title: What you are talking about. Background Current Situation Goal Analysis Recommendations Plan Follow - up Why are you talking about it? Where do we.
A3 Training Session. Introduction…. We all are involved in… – Looking for ways to save resources – Finding ways to improve quality – Fixing problems –
A3 PROBLEM SOLVING TOOL: Date: Contact: SOLUTIONS / COUNTERMEASURES What solutions will solve the root causes? (Tools: Brainstorming and Affinity Diagram)
Title: The title should accurately describe the issue to be addressed and can never contain a proposed countermeasure. Overview Note: Remember that the.
Project Plans CSCI102 - Systems ITCS905 - Systems MCS Systems.
EPICS Conceptual Review Template Notes:  Use the template as a guide to preparing your presentation….you may add, subtract, or rearrange as needed to.
A3 PROJECT CHARTER: Date: Sponsor: VISION OF SUCCESS What outcomes or results do you want to see? What does success look like for our customer? What does.
University of Sunderland Professionalism and Personal Skills Unit 11 Professionalism and Personal Skills Lecture 14: Project Management.
Insert: Title of Improvement Read Out Date:. 2 Objectives for Today’s Session Share results of improvement effort Demonstrate fact-base, analytical approach.
STEP 1: DEFINE THE PROBLEM Problem Statement: What is the problem? A problem is a discrepancy between a standard and the current situation. The ‘standard’
QUALITY OF THE MANAGEMENT PLAN 15 Points (recommend 5 pages)
Stage 1: Assess Mabinay National High School Division Rollout of the CIP Project Oct , 2015.
Managing programs that promote personal effectiveness.
Title of Your Project Team Member 1 Team Member 2.
A3 PROBLEM SOLVING TOOL: Date: Contact: SOLUTIONS What solutions will solve the root causes? (Tools: Brainstorming and Affinity Diagram) What solutions.
Class 12: Exam Review  Client project  Exam review -- check list for client project  Client project work time and Q & A.
Introduction & Background Team AIM Statement
Investigating System Requirements
HOW TO WRITE PROJECT PROPOSAL – FORM AND STYLE
Title should accurately and succinctly describe study
Lean Six Sigma DMAIC Improvement Story
Project management Software development typically includes:
Planning Calendar Summary.
<Project Name> <Name> SOLUTIONS / COUNTERMEASURES
Engagement Discussion A3
SFHN Quality Academy 2017: Title
EPICS Design Review Template Notes:
Project Kickoff Meeting
Risk Reduction Strategies Funct. & NF Requirements Summaries
An Evidence Based Project : Title of Your Project Goes Here
EPICS Conceptual Review Template Notes:
Presented By: <Names> <Team Name> <Date>
Scope & Plan for Horizontal Deployment
Title: Owner: Ver: Date:
Title: Owner: Ver: Date:
Title: Owner: Ver: Date:
Case Study The Check is in the Mail Think Critically
8 Step Problem Solving Step 1: Clarify the Problem
Title: What are you talking about
Title should accurately and succinctly describe study
Title should accurately and succinctly describe study
Description (“If-Then”)
Draft A3 Template Opportunity/Problem Statement Objectives
Subcomponents 8D for Problem Solving
A3 Report: Project name Project mission statement
E190Q – Final Project Presenation
Assignment 2 The final assignment requires you to develop a hypothetical health promotion intervention in the format of a grant proposal. This will involve:
Institution Name.
Project collaborators’ names
<Organization Name> <Date>
1. Define 4. Implement 2. Measure 3. Analyse 5. Control YOUR LOGO
EVALUATION OF COUNTERMEASURES PDCA
EVALUATION OF COUNTERMEASURES PDCA
1. Define 4. Implement 2. Measure 3. Analyse 5. Control YOUR LOGO
2019 INNOVATION ACCELERATOR Presentation Slide Template
by Operational Excellence Consulting LLC
Site (e.g., LARC Embakasi)
Site (e.g., LARC Embakasi)
Accelerated Interest Based Problem Solving
1. Define 4. Implement 2. Measure 3. Analyse 5. Control YOUR LOGO
1. Define 4. Implement 2. Measure 3. Analyse 5. Control YOUR LOGO
© 2018 Durivage Management Solutions Limited
Sepsis Program Development
CCM A3 “P” “D” “C” “A” Date: Title / A3 Theme: Owner: Stakeholders:
PROJECT NAME Communications Plan
Site (e.g., LARC Embakasi)
CJA/475 FORECASTING AND STRATEGIC PLANNING The Latest Version // uopcourse.com
CJA/475 CJA/ 475 cja/475 cja/ 475 FORECASTING AND STRATEGIC PLANNING The Latest Version // uopstudy.com
Presentation transcript:

<PROJECT NAME> THEME STAKEHOLDERS BACKGROUND CURRENT CONDITION <date> <author> <version> THEME What are we trying to do? STAKEHOLDERS Customers – Identify all internal and external stakeholders. Team Members – BACKGROUND Background of the problem Context required for full understanding Importance of the problem CURRENT CONDITION Diagram of current situation (or process) Highlight problem(s) with storm bursts. What about the system is not IDEAL Extent of the problem(s) (i.e., measures) ANALYSIS List problem(s) Most likely direct (or root) cause Why why why why? TARGET CONDITION Diagram of the proposed new process Countermeasures noted as fluffy clouds Measurable targets (quantity, time) IMPLEMENTATION PLAN What will be the main actions and outcomes in the implementation process and in what sequence? What support and resources will be required? Who will be responsible for what, when, and how much? How will you measure effectiveness? When will progress be reviewed and by whom? Use a Gantt chart (or similar diagram) to display actions, steps, outcomes, timelines, and roles. METRICS/FOLLOW-UP Identify a follow-up item for each implementation plan item Describe how and when you will check Evaluate if the results are as anticipated. Action Owner J F M A S O N D