Siskiyou Power Authority

Slides:



Advertisements
Similar presentations
General Safety Overview and Information
Advertisements

Constellation Heating and Cooling Building Automation Systems.
Protecting Public Safety, Public Health, Public Assets and a Special Quality of Life FY08 Town of Sudbury Budget – Article 3.
Hingham Public Schools Preliminary Budget Information FY 2016 Service and Facilities January 12, 2015.
BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® Portland & Walla Walla Districts Columbia-Snake River System Extended Navigation Lock Outage.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
Annexation Presentation 06/10/20141 Planning for our Future.
DAILY APPARATUS CHECKS The goal of a daily inspection is to ensure all systems and equipment are in proper working order before apparatus leave the station.
Franklin County Technical School Performance Contract Project.
King Fahd University of Petroleum and Minerals Mechanical Engineering Department Coop Training : Central Heavy Equipment Department In Aramco King Fahd.
Copyright © 2005 AESSEAL plc Patent Pending Issue 14Slide: 1 Advanced Non-Contacting Bearing Protection PRESENTED BY AESSEAL plc.
Yards Creek Rotor Poles
Electrical Principles and Wiring Materials. Principles of Electricity n Electricity is a form of energy that can produce light, heat, magnetism, chemical.
PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
Gauges and well logging
WATER DEPARTMENT BUDGET WORKSHOP FY16 RECOMMENDED BUDGET March 12, 2015.
Topics to Cover Interconnection Process Overview
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Woodland District 50: Operations and Facilities Report Energy Update 2012 Summer Work Five-Year Facility Plan Service Maintenance Agreement Night Time.
EWEC Athens Opportunities in Outsourcing O&M 01 March 2006.
Lift Station Safety and Maintenance Tony Conn, Supervisor Wastewater Collection and Pumping
Town Of Douglas A Review of the Town’s Proposed Tax Incentive Financing (TIF) Agreement With American Pro Wind, LLC Presented To The Douglas Finance Committee.
MMSD Facility Assessment Outline Mission and Goals History –Building Construction Dates Facility Management Process –Previous 5 year Plan –Website –
Chelan County PUD March 16, Staff recommendation for license action and resolution License Order Rehearing and Clarification Rehearing Items License.
1 CRITICAL ROTATING EQUIPMENT CRITICAL ROTATING EQUIPMENT PACKAGES – 12 FOR POWER GENERATION INCLUDING STEAM TURBINES and 14 FOR GAS COMPRESSION.
Section 703 Apparatus Inspection. Procedures The driver/operator should follow a systematic procedure for inspecting apparatus This ensures that all important.
W. Campbell Supply Company was founded in 1967 by the late Whitman S Campbell. Campbell Supply has been active in the sales & service fire apparatus business.
MicroMet Cutting Edge Technology Defence Systems Division.
ACADs (08-006) Covered Keywords Turbine Auxiliaries, Mechanical Systems, Gates, Cranes and Hoists. Description Supporting Material
Facts About the Energy Industry  By 2015, 35 percent of the workforce (approximately 200,000 high-skill, high- wage workers) may need to be replaced.
DEMAS ENGINEERING SERVICES LIMITED. The Condition Based Monitoring maintenance Experts Our Vision To be the most sought after provider of high quality,
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
GOOD NEIGHBOR AGREEMENTS (AUTHORITY) MARCH 31, 2016.
Gates County Schools Maintenance Department Maintaining and Renovating Today’s Schools For Tomorrow’s Students.
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
1958  Construction began on a new fire hall, adjacent to property known as Fireman’s Park.  The City entered into a contract to construct a firehouse.
It’s…….
Western States Power Corp.
Customer fund program update
Electrical Principles and Wiring Materials
Capital Improvement Plan
Overhaul of Combustion Turbines Under NSR Regulations
UMCP Learning Objectives
Small Sites Planning & Scheduling
FACILITIES. FACILITIES FACILITIES YEAR 1 PRIORITY 1 San Benito CISD will utilize the efficiency audit, prioritize reported items and enlist the Maintenance.
Engineering Technology Division
Canyons Voluntary Assessment Area
Fans & Heaters technical seminar
Condominiums Association
Electrical Gas Plumbing Heating & Cooling
CAPITAL PROGRAM OVERVIEW
ELECTRICITY.
Renewable and Non-Renewable Energy
Emergency Electrical Power Supply for Buildings
FY 08 Facilities Department Budget Proposal January 25, 2007
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
Unit 5 Lesson 5 How Do We Use Electricity?
Operations and Maintenance
Carleton College Facilities Management
TxMAG presentation
Capital Outlay Workshop
23rd Annual NM Infrastructure Conference Improve infrastructure using Self-funding Using Lease Purchase: Public-Private partnership Agreements.
Ocean Sands Condo Association Annual Meeting January 19, 2019
Vehicle & Equipment Maintenance/Cleaning
Maintenance.
Jones Island Water Reclamation Facility
Sacramento Municipal Utility District
Authorize ED to Execute Purchase Order
Project focus areas FY20+ Potential contract opportunities
Fluid Power System Maintenance and Troubleshooting
Presentation transcript:

Siskiyou Power Authority

Hydroelectric power plant

Project Overview Box Canyon Dam was built in 1967 Hydroelectric Power Plant began power generation in1986 The Facility was operated under a Ground Lease Agreement between the Siskiyou County Flood Control and Water Conservation District (District) and Siskiyou Power Authority (Authority), dated March 6, 1984, and the Box Canyon Associates Partnership. This agreement expired in December 31, 2010 Siskiyou County Power Authority took over operations in January 1, 2011. Northbrook Energy was hired for daily operations.

Plant Equipment Project Overview The Power Plant consist of (2) Francis style Horizontal 2.5 Mw Turbines coupled with (2) AC synchronous, 3-phase, 60 Hz, 4160 Volt generators. The Power Plant consists of two Francis style Horizontal 2.5 Mw Turbines coupled with two AC synchronous, 3-phase, 60 Hz, 4160 Volt generators.

The Power The Purchase Power Agreement (PPA) The Power Purchase Agreement between the District (Seller) and Pacific Power & Light (Pacific) was entered into on March 14, 1983 and expires on December 31, 2020.

Power generation

POWER GeneratION RATE Future Power Rates??

Operating revenue and expenses

OUTSIDE CONTRACTOR AND CONSLULTANT COSTS Annual Cost Contract Expires Northbrook Power Management, LLC Operator * $ 268,192 12/31/2020 Triaxis Engineering Operator Support Engineering $ 9,000 6/30/2018 Kleinschmidt Dam Safety and FERC support $ 20,000 *Incudes 4% generation revenue $100,000 estimated for FY16/17

Operator maintenance list Priority Item Description Est. Cost 1 Generator Inspection Winding and bearing inspection, testing, cleaning. Drive coupling inspections add $5k. $15,000 Gen CWS Unit 1,2 - eddy current test and clean generator CWS HEX's. $10,000 Generators Generator VD/PI tests and coil/rotor cleaning $30,000 2 Wicket Gates Inspect and reset to specification using 3rd party hydromech company $25,000 3 Elect Test Relay/Breaker Test, maint., calibrations last done 2014 $20,000 4 HPU Oil removal, tank clean, and oil replacement 5 Spare Parts Review inventory list and define critical spare part needs. Turbines Unit 1 & 2, Turbine shaft seal inepction and replacements. Wear indicated. Inventory Invest in critical spares such as PLC parts, control devices, etc. 6 Routine Maintenance Transformer, bearing, HPU oil analysis, flush cooling water system and generator heat exchangers, etc. $8,000 Dive Dive inspection underwater, up/downstream, intake structure, toe, etc. $50,000 7 Tools Invest is speciality tools such as ultrasonic flow meter, DMM's, vibration monitoring/test equipment, specific hand tools, safety equipment $35,000 Training Infrared Inspection Level 1 using new camera. $3,000 8 Walkway Replace wood walkways with metal grating (a) between the tram and powerhouse, and (b) near the Unit 1 draft tube elbow . $7,000 9 PLC Corrective actions, reprogramming auto, ramp logic, HCV, HWL functionality, full site commissioning, and close out.

County projects SPA Dam Remediate lichen on dam face install snow cleats to prevent avalanches on tram $25,000 Coordinate with Mt. Shasta Fire Department emergency ingress and egress to power plant Unknown Ladders Improve ladder safety $10,000 Log Boom Replace existing log boom $125,000 Tram Option 1 Option 1 includes refurbishment of control system, devices, panels, limit switches, etc., and provision of a nearby 480V power source independent of the plant. $165,000 Tram Option 2 Design and install a new tram system. $400,000 Erosion Repair Stabilize eroded area along the south side of the dam, adjacent to the walkway. $5,000 Rock Stabilization Cliff stability and rockfall analysis. Erosion control and repair near access catwalk at top of dam/parking area. Add $10k. $7,000 Crane Pad [Need previously identified by the County] 60" Bypass Replace/add new controls and install onto PLC control/HMI system. Part of CVO contract, deferred by RA. Security Add security fencing and security cameras, at dam, intertie, parking area. $40,000