January 2005 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IEEE 802.15.4b timeline] Date Submitted:

Slides:



Advertisements
Similar presentations
Doc.: b Submission May 2004 Robert Poor, Ember CorporationSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Advertisements

Doc.: IEEE /430r0 Submission José A. Gutierrez November 02 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Doc.: b Submission November 2004 Robert Poor, Ember Corp.; Marco Naeve, Eaton Corp. Slide 1 Project: IEEE P Working Group for Wireless.
Doc.: IEEE /0111r1 Submission May 2006 LEE, CUNYSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission.
January 2005 doc.: IEEE b January 2006
Sept 2002 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Submission Title: [Add name of submission]
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
March, 2003 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [WG-TG4 Opening Report Mar03] Date Submitted:
June 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposed Scenarios for Usage Model Document.
Submission Title: [Task Group 1 Opening Report]
doc.: IEEE <doc#>
January 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for January 2018] Date.
doc.: IEEE <doc#>
Project: IEEE Wireless Personal Area Networks (WPANs)
March 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Toumaz response to TG6 Call for Applications]
Submission Title: [Proposed project timeline]
December 18 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TGg Liaison Report, May 2003 Date Submitted:
May 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IEEE b timeline] Date Submitted: [
<month year> doc.: IEEE <xyz> January 2001
<month year> doc.: IEEE ptc September 2013
Doc.: IEEE g March 2011 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Ballot.
July 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [ July.
Submission Title: ULP TG Closing Report Los Angeles, CA
November 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG5 Motions at Mid-Week Plenary] Date.
Submission Title: Monterey e/ Liaison Report.
Submission Title: ULP TG Closing Report Dallas Texas
January, 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [January 1394-Wireless Working Group Liaison.
November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4c Project Plan] Date Submitted: [15.
Submission Title: [TGn Liaison Report] Date Submitted: [20 June 2006]
<month year> doc.: IEEE < e> <January 2019>
doc.: IEEE <doc#>
<month year> doc.: IEEE ptc November 2012
<month year> doc.: IEEE <xyz> November 2000
doc.: IEEE <doc#>
doc.: IEEE <doc#>
March 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Timeline of TG4s] Date Submitted: [16 March.
doc.: IEEE /XXXr0 Sep 19, 2007 June 2009
September, 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for September 2015]
<month year>20 Jan 2006
January, 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [January 1394-Wireless Working Group Liaison.
<month year> <doc.: IEEE doc> January 2016
<month year> doc.: IEEE ptc January 2014
May 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Timeline of TG4s] Date Submitted: [19 May 2016]
May 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IEEE b timeline] Date Submitted: [
Submission Title: [Proposed project timeline]
doc.: IEEE <doc#>
doc.: IEEE <doc#>
Submission Title: [ e Schedule Update]
March 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Timeline of TG4s] Date Submitted: [16 March.
Submission Title: [Proposed project timeline]
January 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [17.
November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [15.
September 2009doc.: IEEE wng0
Mar 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution for Comment 70 ] Date Submitted:
May 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [15 May.
Mar 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution for Comment 70 ] Date Submitted:
March 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Opening Information for March 2017]
November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4c Project Plan] Date Submitted: [15.
04 June 2009 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4g SUN Timeline Proposal] Date Submitted:
doc.: IEEE <doc#>
September 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Timeline of TG4s] Date Submitted: [17.
March 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IEEE b timeline] Date Submitted:
July 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [ July.
Submission Title: [TGn Liaison Report] Date Submitted: [20 June 2006]
Jan 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TeraHertz Closing Report Date Submitted: January.
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Specialty Networks (WSN) Submission Title: TG4z EIR Agenda for November 2019 Date.
Presentation transcript:

January 2005 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IEEE 802.15.4b timeline] Date Submitted: [ 16 November, 2004] Source: [Robert Poor, Marco Naeve] Company [Ember Corporation, Eaton Corporation] Address [313 Congress Street, Boston, MA, USA] Voice:[Add telephone number], FAX: [Add FAX number], E-Mail:[rpoor@ieee.org, marconaeve@eaton.com] Re: [IEEE 802.15-04-0237-04-004b] Abstract: [This document contains the schedule and timeline for the work of the 4b task group] Purpose: [For informational purposes.] Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. Robert Poor, Ember Corp.; Marco Naeve, Eaton Corp.

IEEE 802.15.4b Timeline January 2005 Robert Poor, Ember Corp.; Marco Naeve, Eaton Corp.

doc.: IEEE 802.15-<doc#> <month year> doc.: IEEE 802.15-<doc#> January 2005 Schedule [4] Present proposals at the Jul04 plenary and Sep04 vote on the individual contributions that will comprise the draft at the Sep04 meeting. [5] Draft complete by Jan05 Interim. [6] At Jan05 meeting, we move the draft be put to letter ballot. [7] 40 day letter ballot period between Jan05 and Mar05 meetings. [8] Our primary Mar05 meeting activity is comment resolution [9] Put draft into recirc ballot at Mar05 meeting. Robert Poor, Ember Corp.; Marco Naeve, Eaton Corp. <author>, <company>

January 2005 Schedule [10] 15 day recirculation ballot period between Mar05 and May05 [11] Comment resolution during May05 meeting. [11a] Put draft into recirc ballot at May05 meeting. [11b] 15 day recirculation ballot period between May05 and Jul05 [11c] Comment resolution during Jul05 meeting. [12] At Jul05 meeting, seek approval from ExCom to go to sponsor ballot. Robert Poor, Ember Corp.; Marco Naeve, Eaton Corp.

Schedule [13] 40 day sponsor ballot between Jul05 and Sep05 meetings January 2005 Schedule [13] 40 day sponsor ballot between Jul05 and Sep05 meetings [14] Comment resolution during Sep05 meeting [15] 15 day recirculation ballot between Sep05 and Nov05 meetings [16] At Nov05 meeting, seek approval from ExCom to submit draft to RevCom. [17] RevCom meets in March. Agenda deadline 2/10/06. [18] At Mar06 meeting, rejoice and drink champagne. Robert Poor, Ember Corp.; Marco Naeve, Eaton Corp.

Timeline Graph January 2005 Robert Poor, Ember Corp.; Marco Naeve, Eaton Corp.