Author: NG ETR team Last Updated: 04-Dec-2014 (V0.1)

Slides:



Advertisements
Similar presentations
CISTECH R7.8 SERIES Managing an R7.8 Environment with R7.8 Link Manager.
Advertisements

Author Instructions How to upload a full session proposal with abstracts – two step process.
C LOUD C OMPUTING Presented by Ye Chen. What is cloud computing? Cloud computing is a model for enabling ubiquitous, convenient, on- demand network access.
Presented by the EPA AQS Team. Agenda Introductions Housekeeping/Overview of GoToWebinar Presentation Q& A session – use Question box to submit your questions.
1 Accord Guide to Member Logins. 2 How to login to your FFC account What to do if you forget your FFC password How to change your FFC account password.
SecurityCenter & Palo Alto Configuration Guide. About this Guide This guide provides an overview of how to get the most from Palo Alto firewalls when.
© 2014 IBM Corporation Blackboard Collaborate Presenter’s Rehearsal : What You Need To Know.
Project 1 Online multi-user video monitoring system.
 Alan Barnard Template for Submissions of Case Studies to Logistics Achiever Awards LOGISTICS ACHIEVER AWARDS.
1 Accord Guide to Member Logins. 2 How to login to your FFC account What to do if you forget your FFC password How to change your FFC account password.
Time lag between discovering issue and resolving Difficult to find solutions and patches that can help resolve issue Service outages expensive and.
1 of 5 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
February 2008 Gemini Incident Overview. Agenda Focus this part of the presentation is on the system elements of last year’s Gemini incident :-  Briefly.
XA R7.8 Link Manager How to Manage an R7.8 Environment Ruth Anne Pharr Sr. IT Consultant, CISTECH Inc.
Submission With Internet File Transfer User Guide - SEAN.
SchoolNet Observation Tool Training Presented by Nicole Wolden and Stacey Sheehan-Block.
Connect with life Tejasvi Kumar Developer Technology Specialist | Microsoft India
Military Outreach for Service Training Conference Dec. 14, 2015 Program of Events.
Welcome to Zoom Training
Polycom UC Software Summary
Fundamental of Databases
Blackboard Assignments & Feedback Rubrics
P329 Participant Test Briefing
Cisco WebEx.
Remedy Service Management Interface
Author: NG ETR team Last Updated: 03-Nov-2014 (V0.1)
Author: NG ETR team Last Updated: 30-Oct-2014 (V0.2)
The Access Grid Node: The Operator’s Manual.
Power BI Security Best Practices
Advanced Navigation Features
You will not hear sound until the host opens the audio line.
Template for Submissions of Case Studies to Logistics Achiever Awards
Author – Akash Pramanik
IBM Cognos Analytics Administrator V11 C Questions Answers
Description of Revision
Welcome to the LMS Quick Manager Guide.
Presenting a Webex session
iCIMS 17.2 Release: Highlights
SharePoint Administrative Communications Planning: Dynamic User Notifications for Upgrades, Migrations, Testing, … Presented by Robert Freeman (
Introduction to CAST Technical Support
Unit4 Partner Portal for Case Creator
NHS e-Referral Service (e-RS)
OdaStat-G – Getting Started with the OdaLog Type L2
Proof of performance How to Upload guide
EVOSS Walkthrough.
atEvent + HubSpot Integtration Instructions
Webinar Instructor Training
Tariffs Management (Wholesalers)
Manual for Supplier Registration
EUCEG Technical update - Industry 13th of July 2018
Smart Connect – Supplier Portal Training
Welcome! Crown Mineral Activity To the ETS – Crown Mineral Activity
Project Name - Testing Iteration 1 UAT Kick-off
COLLECT – Spring 2019.
Sub Division User Manual for eBlocks.bih.nic.in Website
Getting Started Universal Navigation Quick Search Tools
Connect Client Training
Requirements Analysis Document Presentation
The ‘Managed Communication’ Space
{Project Name} Organizational Chart, Roles and Responsibilities
Sample C2 System 16 Agents on 2 (physical) Nodes
Presenter Training.
Getting Started Universal Navigation Quick Search Tools
Decimals to Fractions – Connect 3
The migration to the new EDAMIS
The ‘Managed Communication’ Space
TRAIN THE TRAINER: HOW TO TRAIN BOLD
Canvas introduction for students
This is a quick game to quiz two teams of students.
Presentation transcript:

Author: NG ETR team Last Updated: 04-Dec-2014 (V0.1) European Transparency Regulation (ETR / ERGEG) – Industry briefing (04-Dec-2014 session) – Tcon Author: NG ETR team Last Updated: 04-Dec-2014 (V0.1) ETR Industry briefing v0.1 (04-Dec-14)

ETR Industry briefing v0.1 (04-Dec-14) Some ground rules Login to the “live meeting” session as “name (company)”. For example: Melanie (NG) Do not use the “live meeting” audio. Please dial in separately using the conference details in the appointment. When you have a query, use the dialog box to raise your hand. The presenter will stop at the appropriate moment and ask the person to speak. When speaking, please announce yourself “name (company)”. Sorry for this. Due to the expected large number of attendees, it is essential to follow this. ETR Industry briefing v0.1 (04-Dec-14) ETR Industry briefing v0.1 (04-Dec-14)

ETR Industry briefing v0.1 (04-Dec-14) Agenda Testing update Manual entry update / Release of log-on credentials Project status Looking ahead Any other business ETR Industry briefing v0.1 (04-Dec-14)

Testing update – MODIS testing externally Successfully resolved issues with Master configuration files (03 Dec 14) ETR Industry briefing v0.1 (04-Dec-14) 4

Testing update – Network Connectivity testing Network issue update to Wokingham server ETR Industry briefing v0.1 (04-Dec-14) 5

Testing update (Processing of MP sample reports) ENTSO-E Test platform access through: http://62.209.222.11 Can view Master config data currently loaded – note that Production unit level capacity is displayed Can view test reports that have been successfully processed Note: Need to navigate to United Kingdom Area (left hand side bar) and sub-category relating to National Grid ETR Industry briefing v0.1 (04-Dec-14) 6

ETR Industry briefing v0.1 (04-Dec-14) Project Status EMFIP Production environment available 03/12/14 MODIS Production environment available 03/12/14 BMRS Production environment available 16/12/14 Delays experienced with MODIS rollout which has compressed end-to-end testing period During BMRS downtime period, files can be emailed and manually uploaded to EMFIP to mitigate impact From 16th December, there will be parallel test and production environments on all 3 systems Contingency arrangements in place in case of unexpected system issues ETR Industry briefing v0.1 (04-Dec-14)

Manual entry submission routes NG has released the manual update spreadsheet, which can be collected by ‘cloud’ distribution method Update on distributing MP log-on credentials Progress to date, including MP testing of manual entry ETR Industry briefing v0.1 (04-Dec-14)

ETR Industry briefing v0.1 (04-Dec-14) Looking ahead NG has a dedicated tester importing MP sample reports and delivering of the Acks and Nacks NG is working closely with Elexon on system-to-system interface to allow faster turnaround on MP sample report feedback ETR Industry briefing v0.1 (04-Dec-14)

End Last slide