Closing Report Date: 2010-11-12 Authors: November 2010 November 2010 doc.: IEEE 802.11-10/1384r0 November 2010 Closing Report Date: 2010-11-12 Authors: Clint Chaplin, Chair (Samsung) Clint Chaplin, Chair (Samsung)
Closing report for WNG SC for November 2010, Dallas, Texas, USA doc.: IEEE 802.11-10/1384r0 November 2010 Abstract Closing report for WNG SC for November 2010, Dallas, Texas, USA Clint Chaplin, Chair (Samsung) Clint Chaplin, Chair (Samsung)
Presentations at November 2010 meeting doc.: IEEE 802.11-10/1384r0 November 2010 Presentations at November 2010 meeting 'L-Cubed': LONGER Range, LOWER Data rate, LOW Energy Wi-Fi Update From September (11-10-1317-01-0wng-l-cubed-update-from-sep-2010.pptx) – Bill Carney Digital RF Transceiver to Meet the Needs of Emerging Spectrum (11-10-1238-00-0wng-digital-rf-txrx.ppt) – Alex Reznik Location Awareness (11-10-1239-02-0wng-location-awareness-discussion.ppt) – Jim Lansford Minutes 11-10-1334r0 Plans for January 2011 1 2 hour session Clint Chaplin, Chair (Samsung) Clint Chaplin, Chair (Samsung)