TC22 SC37 WG3 Liaison Report for EVS-GTR Thermal Propagation Work Item

Slides:



Advertisements
Similar presentations
1 Progress Report on TF5 test items. 2 1.Status update on TF5 2.Summary 3. Next step activity Content.
Advertisements

ISO – plans and progress towards the revised international standard for thesauri Stella G Dextre Clarke Project Leader, ISO NP
SC38 Liaison Report to SC32 at SC32 meeting, Oct 24-28, 2011 Crete Baba Piprani/Canada SC38  SC32 Liaison 1 ISO/IEC JTC1/SC32/WG2 N1599.
REPORT TO GRPE 70 TH SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document GRPE th GRPE, January 2015 Agenda.
REPORT TO GRPE 71 ST SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document GRPE st GRPE, 8-12 June 2015, agenda.
EVS-GTR TF5 Update Progress TF5 task force – thermal propagation 2015/6/4.
UN Lithium Battery Tests George A. Kerchner PRBA – The Rechargeable Battery Association 1776 K Street, NW Washington, DC
The road vehicle standards June 2001 Presentation to WP 29 of the business plan of ISO/TC22.
Related Illustration on thermal propagation Prof. Xiao Chengwei (TF5 team leader) 2015/06/03.
for Thermal Propagation
Draft Proposal ECE-R 100 protection against electric shock
Joint Meeting Report on Standards 8 July Recent Accomplishments Systems Modeling Language (SysML) specification accepted for adoption by OMG AP233.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ICT Accessibility Standardization Dr. Jim Carter, ISACC Document No: GSC16-PLEN-57r2 Source: ISACC.
TF5 – Status report on thermal propagation EVS-GTR 9 th IWG meeting Changchun, China 2015/9/17.
1 Discussion paper on Current Status on TF5 test items Xiao Chengwei.
Task Force 3: Electrolyte leakage Last update- 14/09/
2002 NCSL International Workshop and Symposium August 8, 2002San Diego, CA National Institute of Standards and Technology Technology Administration, U.S.
Slide 1 Insert your own content.. Slide 2 Insert your own content.
Review of EVS 9 th Meeting 1> TF8 catch an agreement on the definition of heavy duty electric vehicles as below: heavy vehicles cover the vehicles belong.
“Hydrogen detection apparatus” Dr. Ichiro Matsubara, convener
ISO TC204 WG8 Convenor’s Report Public Transport and Emergency Services April 2006 Busan, South Korea.
Task Force 8: Heavy Duty Vehicles
ISO/IEC Software Testing The New International Software Testing Standard By Tafline Murnane and Stuart Reid ISO/IEC JTC1/SC7 WG26 Software Testing.
TC22 SC37 WG3 Liaison Report for EVS-GTR Thermal Propagation Work Item
ISO/IEC Software Testing
JRC comments and questions in advance EVS Canada EVS GTR IWG Session #14 Ottawa, September 2017.
Task Force 3: Electrolyte leakage
WG 14 ITS: Roadway-Vehicle Warning and Control Systems
EVS-GTR phase 2 Thermal propagation
ISO/IEC JTC 1/SC 7 Working Group 42 - Architecture Johan Bendz
Electric Vehicles Safety Global Technical Regulation
Co-Sponsors: China, Japan, EU and US 59th Session GRSP May 9-13, 2016
Electric Vehicles and the Environment (EVE IWG)
ISO TC 108 SC3 Liaison to CCAUV
ISO TC268 SC1 - Smart Community Infrastructures -
Scott MacLeod UL LLC TC 111 US NC
Informal document GRSG
© 2017 Global Market Insights, Inc. USA. All Rights Reserved Electronic Adhesives Market Size, Industry Analysis Report, Regional Outlook.
The Household Budget Surveys in the Candidate Countries
JRC comments and questions in advance EVS CATARC EVS GTR IWG Session #14 Ottawa, September 2017.
Update on “IPPC implementation” and “Competitiveness” studies
TF4 report (Tokyo, 2016/03/03) 1. Mechanical integrity test
CHEMICAL ACCIDENTS Programme
For 24 countries with more than 20 citations, this figure compares contributions to ESMO and the UK cancer CPGs. Solid line of identity indicates equal.
Slide 1 Insert your own content.. Slide 1 Insert your own content.
Report of 6th DTP Meeting to GRPE 9th June 2011 UNECE, Geneva (CH)
Slide 1 Insert your own content.. Slide 1 Insert your own content.
Slide 1 Insert your own content.. Slide 1 Insert your own content.
Proposal for future maintenance of Mutual Resolution 2
OICA Feedback on Proposed Test Procedure
Employee Performance Management System (EPMS)
WLTP Informal Working Group
Activities of the UNECE-UNODC Task Force on Victimization Surveys
Transmitted by Co-Chairs of VMAD
Future Plan of Low-Carbon Model Town (LCMT) Project
EVS-06-10e Progress Report on TF5 Nov. 3rd, 2014.
Progress Report GRE TF AVSR
Japan’s response to Action item 2 EVS-GTR IWG#17.
Water Directors’ Meeting Working Group D (Reporting) activities
JRC comments and questions in advance EVS Korea EVS GTR IWG Session #14 Ottawa, September 2017.
Strategic Coordination Group 2007 Reporting Guidance on Monitoring
WP 2: Align / synchronise progress reporting under both directives
Progress Report GRE TF AVSR
Action item 2 Japan EVS-GTR IWG#17.
Transport Safety Standards Committee 38th Meeting
Task Force 1: Protection against Water
TF5: Cell/module/system test
Supplemental material on TF5 Japan comments
EDR/DSSAD IWG Status Report
Presentation transcript:

TC22 SC37 WG3 Liaison Report for EVS-GTR Thermal Propagation Work Item Dr. Annika Ahlberg Tidblad (SE) Brian J. Lawrence (UK) Mar-2018

Introduction AAT & BJL participated in two TC22 SC37 WG3 meetings on Thermal Propagation since EVS 14th session: 10-11 Jan-2018, Stockholm, Sweden 19-20 Mar-2018, Ningde, China 7 national standards organisations represented: China (CN), France (FR), Germany (DE), Japan (JP), South Korea (KR), Sweden (SE) and UK National organisation focus Test method development Cell-level initiation DE, JP, CN Module-level initiation KR Standardised methodology for “Documented Approach” SE, UK, FR Note: Not mutually exclusive Expectation that both concepts to be included in ISO 6469-1 amendment But timing may vary

WG3 Activity – Stockholm & Ningde Meetings Agreement on evaluation scheme for (cell-level) trigger methods See Annex.A: WG3 Activity – Trigger Method Evaluation (Slide 4) National organisation feedback discussed at Ningde meeting, 19 & 20-Mar-2018 Identification of preferred candidate methods for further investigation Elimination of non-preferred candidates Draft standard/guideline with content for “documented approach” Significant work presented by SE (AAT) National organisation feedback discussed at Ningde meeting Summary & Conclusions Fundamental question of forced Thermal Runaway remains open Wide range of candidate methods still under investigation Next steps WD1 by end 2018 (test and documented methodologies) See also slide 4. Next meetings: 22 & 23-Oct-2018, France 21 to 23-Jan-2019, S. Korea (provisional)

WG3 Next Steps (cont.) Inserted seed method Electric heater SE to obtain NREL/NASA data Inserted micro heater FR to provide data New “Precise controlled ISC” CN to provide test description and data Laser JP to provide study results Mild steel nail penetration DE test description External short of module Withdrawn by KR Electric heater JP to provide test results Electric heater (cell replacement) CN to provide test description and data TRIM & “Shock Heater” FR to request data from Canada Chemical heater (cell replacement) DE test description and data Definitions needed: Internal failure Internal short circuit “Worst case” ISC (time/energy release) Thermal event Thermal Runaway

Annex.A: WG3 Activity – Trigger Method Evaluation