Fundamental Neutron Physics BL-13

Slides:



Advertisements
Similar presentations
Design Items and Tasks for pol. 3 He Remain design items: Support structure Main support Tube/oven (90% complete) Temp. support in the target lab Target.
Advertisements

W. M. Snow Physics Department Indiana University/IUCF EDM collab meeting Monitoring the Cold Neutron Beam (During Experiment) What to measure (fluence.
NPDgamma Liquid Hydrogen Target Safety Review Project and Safety At LANL November 29-30, 2005.
Managed by UT-Battelle for the Department of Energy Neutrino Factory Mercury Containment Concepts V.B. Graves 2 nd Oxford-Princeton High- Powered Target.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
Background – Maxwell Equations The Maxwell equations arise out of the electromagnetic force laws (Coulomb’s law and the Biot-Savart law) by separating.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
MICE Engineering Integration Update August 13, 2003 Edgar L. Black IIT.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
12 March 2006NFMCC Meeting, IIT, Chicago1 Progress on the MICE Cooling Channel and Tracker Magnets Michael A. Green Lawrence Berkeley Laboratory.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
NPDgamma Liquid Hydrogen Target Safety Review At LANL November 29-30, 2005.
Patrick Thornton, SNS/FPE June 9, 2008
NPDGamma - LH2 Target - Relief/Ventline Systems Seppo Penttila NPDGamma Project Manager Predicted A  =5x10 -8 We are aiming to 10% measurement.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
The n- 3 He Project Christopher Crawford University of Kentucky for the n- 3 He Collaboration n-3He Technical Review ORNL, TN
The n- 3 He Project Christopher Crawford University of Kentucky for the n- 3 He Collaboration n-3He Technical Review ORNL, TN
1 Overview of the NPDGamma Experiment at the Fundamental Neutron Physics Beamline Geoff Greene UT/ORNL.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
Status update of n- 3 He experiment DOE FnPB Review, ORNL D. Bowman, S. Penttila Oak Ridge National Laboratory M. Gericke University of Manitoba.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Normalization of the NPDGamma Experimental Data F. Simmons, C. Crawford University of Kentucky, for the NPDGamma collaboration Background: NPDγ Experiment.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Projected performance of NPDGamma and new systematics introduced by SM polarizer Christopher Crawford University of Kentucky NPDGamma Collaboration Meeting.
Polarized Neutrons in ANSTO – From LONGPOL to Pelican, Taipan, Sika, Platypus and Quake Dehong Yu and Shane Kennedy Bragg Institute, ANSTO, Australia.
Uncertainty for NPDGamma experiment in reaction Pil-Neyo Seo U of Virginia/TUNL HIGS2 Workshop, June 3-4, 2013.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
Beamline Readiness Review - Hutch Beamline Microdiffraction March 28, 2006.
CM 28 – 6 th October 2010 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
Hydrogen Pre-Operation Safety Review 4 th October 2011 The Hydrogen Delivery System – An Introduction M Hills.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Polarization Measurement for Npdgamma at the SNS M. Jon Dadras.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
EDM Engineering Issues General Mechanical Considerations EDM Cryostat Plan D ANSYS EMAG Calculations ANSYS MECH Calculations 3 June ‘03 J. Boissevain.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain, P-25 February 11, 2005, Los Alamos National Laboratory EDM Reference Design Tour of the Reference.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Technical Readiness Review of the n-3He Experiment Seppo Penttila ORNL P-div At SNS Jan
EDMEDM EDM Collaboration Meeting 6-05 Jan Boissevain, P-25 June 20, 2005, Los Alamos National Laboratory EDM Reference Design.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.
Moving the NPDGamma Experiment to the SNS FnPB Christopher Crawford University of Kentucky overview of NPDGamma transition to the SNS expected.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
1 MICE Coupling Coil Cryostating and Test Steve Gourlay March 1, Office of Science.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
Muon Ionisation Cooling Experiment Overview
NPDG Liquid Hydrogen Target: Design and Safety Features
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
INSTALLATION SEQUENCE
LARP Vertical Test Facility
Spectrometer Solenoid Fabrication Status and Schedule
CUORE Detector Calibration System
The NPDGamma Experiment at the SNS FnPB
Resonant Frequency Spin Rotator For the n3He Experiment
Experimental equipment Edgar L. Black February 17, 2019
The n3He Experiment Michael Gericke for the n3He collaboration
Polarized 3He target installation
Presentation transcript:

Fundamental Neutron Physics BL-13 NPDGamma Experiment Equipment Removal Installation of n3He Experiment Jack Thomison 1/10/14

NPDGamma Experiment Approved March 14, 2012 Approved for Operation with Liquid Hydrogen Target in Final Configuration 2nd Lead Wall Spin Flipper H2 Fill & Vent Line Detector Assembly Target Cryostat These Major Components will need to be removed

NPDG to n3He Sequences and Major Support Requirements Start Summer Outage Detailed schedule discussed in Seppo’s presentation

NPDG Outside View 1st step is to remove roof plates and panels

NPDG with Plates & Roof Panels Removed

NPDG Interior Components 2nd Lead Wall Spin Flipper Detector Assembly Target Cryostat H2 Fill & Vent Line H2 Fill & Vent Line Next step is to remove H2 Fill & Vent Line

Install H2 Fill/Vent Line – July 2011 Photos from NPDG Installation. Removal will be similar, but in reverse order.

NPDG with Fill/Vent Line Removed Spin Flipper 2nd Lead Wall Detector Assembly Target Cryostat Target Cryostat Next step is to remove Target Cryostat

Install Target Vessel & Stand - July 2011 Photos from NPDG Installation. Removal will be similar, but in reverse order.

NPDG with Target Cryostat Removed Spin Flipper Spin Flipper 2nd Lead Wall Detector Assembly Detector Assembly Next step is to remove the Spin Flipper and then the Detector Assembly

Install Spin Flipper – Nov 2010 Photos from NPDG Installation. Removal will be similar, but in reverse order.

Install Detector Array on Stand – Nov 2010 Photos from NPDG Installation. Removal will be similar, but in reverse order.

NPDG, Detector & Spin Flipper Removed 2nd Lead Wall 2nd Lead Wall Next step is to remove the 2nd Lead Wall

Install 2nd Lead Collimator Wall – October 2010 Photos from NPDG Installation. Removal will be similar, but in reverse order.

All NPDG Components Removed NPDG Coils and Stands will be retained and used for n3He

n3He Experiment Preliminary model in the SNS Pro/E 3-D Model

Main components in n-3He experiment 3He target/ detector RF Spin Rotator Lead gamma shielding 4 x preamp enclosures Supermirror polarizer Solenoid Detailed Design 3-D Model by the Collaboration and will be incorporated into the final SNS Pro/E Model

Conclusion Questions/Comments?