Andrew-Carter, Inc. Issue: Due to the economic depression, A-C considers to close one of its 3 plants. The objective is to minimize the Cost. Setup: 1.

Slides:



Advertisements
Similar presentations
Instructors: Connie Hutchison & Christopher McCoy
Advertisements

DL Windows Software “Rules” Import a CSV File From Excel
Lab 2 Data Evaluation & Validation Excel Scenarios & Functions Simon Chapter 2 & 3 URBPL 5/6010: Urban Research University of Utah Pam Perlich – BUC 103.
Wyndor Example; Enter data Organize the data for the model on the spreadsheet. Type in the coefficients of the constraints and the objective function.
Introduction to Spreadsheets. Learning Target I can input data and do simple calculations in a spreadsheet.
McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Table of Contents Chapter 2 (Linear Programming: Basic Concepts) Three Classic Applications.
Decision Analysis Tools in Excel
6-1 Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Transportation, Transshipment, and Assignment Problems Chapter 6.
Case Study By: The South Group
Microsoft Office 2007 Excel Chapter 8 Formula Auditing, Data Validation, and Complex Problem Solving.
Operations Management Linear Programming Module B - Part 2
Enter the application Click to advance to the next slide.
Chase Manhattan Bank By South Group
Linear Programming Using the Excel Solver
Example (Transportation Problem)
Spreadsheet-based 0ptimization Objective: Execute the optimization of profit functions using the Excel spreadsheet. With modern spreadsheets, optimization.
QM B Linear Programming
Transportation and Assignment Problems
Formula Auditing, Data Validation, and Complex Problem Solving
Computational Methods for Management and Economics Carla Gomes Module 4 Displaying and Solving LP Models on a Spreadsheet.
Example 7.6 Facility Location Models | 7.2 | 7.3 | 7.4 | 7.5 | 7.7 | 7.8 | 7.9 | 7.10 | Background Information.
Game Theory 2 Computer solutions.
1 ONE TIME PRINT SETUP To print Requisitions from Banner, follow this process once: Open Microsoft Excel, select (1) TOOLS, then (2) MACROS, then (3) SECURITY.
START EXCEL BUILD OR RETRIEVE YOUR OPTIMIZATION MODEL SAVE YOUR WORKBOOK!! CHOOSE “Solver…” IN THE “Tools” MENU SPECIFY IN SOLVER DIALOG BOX: 1.CELL TO.
Installing Solver in Microsoft Excel Subteam 4: Mayra Gonzalez Stephanie Pereira Elizabeth Yau January 27, 2009.
Linear Programming: Basic Concepts
Supply Chain Management
MIS 463: Decision Support Systems for Business Review of Linear Programming and Applications Aslı Sencer.
STEP 1: Accessing the Random Number function -Open your spreadsheet with the universe of facilities (If your list is in word, just cut and paste the list.
Problem Excel QM and Solver BY: Matthew Held These slides will walk you through solving this problem step by step Summarize problem information 3.
Screen ViewModule Title: Notes: Branching Instructions: Audio Script: Page: Messaging Configure the Address Book 1 Configure the Personal Address Book.
Using Spreadsheets In Analytical Chemistry Chap 3. Using Spreadsheets in Analytical Chemistry (1) Getting started : Excel (2) The basic usage  basic usage.
Transportation and Assignment Problems
Linear Programming with Excel Solver.  Use Excel’s Solver as a tool to assist the decision maker in identifying the optimal solution for a business decision.
作業研究 Using Excel to Formulate and Solve Transportation Problems.
An-Najah N. University Faculty of Engineering and Information Technology Department of Management Information systems Operations Research and Applications.
© Anita Lee-Post Facility Location Part 2 by Anita Lee-Post.
Using Microsoft Word & Excel §Open a new document in MS Word §Click on Tools & then Mail Merge l a dialogue box, like the one on this page, will appear.
Family Planning Research Center of Nigeria Case Study
Math Programming Concept of Optimization (L.O. a ) Linear Programming Managerial Value of Information (L.O. d) Theory (L.O. b) Example Applications (L.O.
ENGM 631 Optimization Using Solver. Sec. 3.1Alt. Model Max Z = 3X 1 + 5X 2 s.t. X 1 < 8,000 X 2 < 6,000 3X 1 + 4X 2 < 36,000 X 1 > 0 X 2 > 0.
Producing a Mail Merged Letter Step 1 Create an Access database for Names and Addresses you can use the ‘Customers’ template in Group Work. Enter the necessary.
Remember…  Please do not…  Change the background.  Change the icons.  Change the font. Use Times New Roman (size 12 font).  Use color. We cannot print.
Case Study By: The South Group
Linear Programming II. George Dantzig 1947 Narendra Karmarkar Pioneers of LP.
Linear Programming McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Excel Functions. Part 1. Introduction 2 An Excel function is a formula or a procedure that is performed in the Visual Basic environment, outside the.
1 Chapter 9 If one would take statistics about which mathematical problem is using most of the computer time in the world (not including data base handling.
Solving Linear Optimization Problems Using the Solver Add-in.
Appendix A with Woodruff Edits Linear Programming Using the Excel Solver Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Formula Auditing, Data Validation, and Complex Problem Solving
Setting up Solver Add-in for Excel
5.2 Microsoft Excel.
Problem 1 Demand Total There are 20 full time employees, each can produce 10.
European Computer Driving Licence
Excel Solver.
The Transportation Model
Using Spreadsheets In Analytical Chemistry
5.2 Microsoft Excel.
Exploring Microsoft® Excel® 2016 Series Editor Mary Anne Poatsy
The Transportation Model
ENGM 631 Optimization Transportation Problems.
REVIEW FOR WINDOWS APPLICATIONS TEST ON FRIDAY- SEPT. 7, 2012
Horizontal Centering Using the menu bar
Excel: Solver Participation Project
Microsoft Excel 101.
Modeling and Solving LP Problems in a Spreadsheet
Linear Programming Excel Solver.
Solving Linear Optimization Problems Using the Solver Add-in
BUS-221 Quantitative Methods
Presentation transcript:

Andrew-Carter, Inc. Issue: Due to the economic depression, A-C considers to close one of its 3 plants. The objective is to minimize the Cost. Setup: 1. Make a tabular 2. P1, P2, P3 are the Plants 1, 2, 3 3. r = regular time; o = overtime 4. W1, W2, W3, W4, W5 are the Warehouses 1, 2, 3, 4, 5 5. # in cells is the variable cost per unit ( Variable cost in Table 10.40 + Distribution cost from Table 10.41) 6. Perform the comparative analysis by using QM for Windows or Excel.

W1 W2 W3 W4 W5 Supply P1r 3.30 =2.80+0.5 3.24 3.29 3.26 3.36 27,000 P1o 4.02 3.96 4.01 3.98 4.08 7,000 P2r 3.18 3.28 3.34 3.35 20,000 P2o 3.88 4.00 4.04 4.05 5,000 P3r 3.25 3.32 3.07 25,000 P3o 3.95 3.93 3.77 6,000 Demand 9,000 13,000 11,000 15,000 8,000 90,000 56,000

Using QM for Windows Assume Plant 1 is Closed: Start QM for Windows Select Module Menu Select Transportation Select File Menu Select New Define Data set for Transportation

Using QM for Windows Fill in data grid with problem data from the Tabular without P1 Solve the problem by clicking the solve button

Using QM for Windows Total Variable Cost without P1 = $188,360 The solution can be viewed in the data grid

Using QM for Windows Assume Plant 2 is Closed: Select File Menu Select New Define Data set for Transportation

Using QM for Windows Fill in data grid with problem data from the Tabular without P2 Solve the problem by clicking the solve button

Using QM for Windows Total Variable Cost without P2 = $183,430 The solution can be viewed in the data grid

Using QM for Windows Assume Plant 3 is Closed: Select File Menu Select New Define Data set for Transportation

Using QM for Windows Fill in data grid with problem data from the Tabular without P3 Solve the problem by clicking the solve button

Using QM for Windows Total Variable Cost without P3 = $189,930 The solution can be viewed in the data grid

Use Excel Solver to solve the question Open Excel Select QM and Transportation from the menu bar

Excel Solver Fill in the spreadsheet initialization as follows:

Excel Solver Without P1 Fill in the tabular after enter the spreadsheet initialization and click OK Select tool and solver from menu bar

Excel Solver Without P1 Set Solver Parameters as follows: Then click solve View the solution

Excel Solver without P2 Repeat the Steps in Slides 12 and 13 Fill in the tabular after enter the spreadsheet initialization and click OK Select tool and solver from menu bar

Excel Solver without P2 Set Solver Parameters as follows: Then click solve View the solution

Excel Solver without P3 Repeat the Steps in Slides 12 and 13 Fill in the tabular after enter the spreadsheet initialization and click OK Select tool and solver from menu bar

Excel Solver without P3 Set Solver Parameters as follows: Then click solve View the solution

Conclusion From the result of QM for windows or Excel Solver, We conclude that: Without Total Variable Cost P1 188,360 P2 183,430 P3 188,930

Discussion Question 1 Evaluate the various configurations of operating and closed plants that will meet weekly demand. Determine which configuration minimizes total costs. To close the Plant 2 minimize total cost because by closing the Plant 2 will minimize the total variable cost.

Discussion Question 2 Discuss the implications of closing a Plant. To minimize the cost is to determine the lowest total variable cost for closing the plant.