Inspection and Testing

Slides:



Advertisements
Similar presentations
COMPANY MAINTENANCE MANUAL
Advertisements

AS9102 First Article Inspection Report
Radiopharmaceutical Production
ISO 9001:2000 Documentation Requirements
Transition from Q1- 8th to Q1- 9th edition
1 HYDROSTATIC TESTING Approved for Public Release.
ISO 9001:2000 Certified Next Steps? Where do we go from here?
Final/Shipout Inspection Approved for Public Release.
EQUIPMENT VALIDATION.
First Article Inspection Report
ISO 9001 : 2000.
EPSON STAMPING ISO REV 1 2/10/2000.
SUBSAFE Approved for Public Release
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
The ISO 9002 Quality Assurance Management System
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
FAA Workshop on Key Characteristics for Advanced Material Control
Quality Assurance/Quality Control Policy
D. Keane June Internal Quality Audits (4.14) -ISO Requirements for Internal Audits -The Audit Process -Templates for Meeting Requirements.
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
Technical requirements  Sampling  Analysis  Reporting of the results.
ISO 9000 Certification ISO 9001 and ISO
Technical requirements:
First Article Inspection
1 Inspection and Testing Approved for Public Release.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
DataLyzer® Spectrum Gage Management System introduces……
Introduction to ISO New and modified requirements.
Rocky Mountain RAPS Process Validation Presentation 6/7/06 By Clay Anselmo.
VALIDATION METHODOLOGY
Company duties under the ISM Code
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
From Research Prototype to Production
Visit us at E mail: Tele:
October SYS 1 Quality Audit and ISO9000 Quality Standard Kinnison, Chapter 17.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
Process System Capability An introduction to 9103 ‘VARIATION MANAGEMENT OF KEY CHARACTERISTICS’ Bernard LAURAS AIRBUS.
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
QUALITY MANAGEMENT STATEMENT
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
Internal Auditing ISO 9001:2015
Duties and Responsibilities
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Visit us at E mail: Tele:
First Article Inspection Reports (FAIRs) Instructions for Suppliers
Quality Control significance in pharmaceutical industry
Responsibilities of Test Facility Management, Study Director, Principal Investigator and Study Personnel G. Jacobs Belgian GLP Monitorate Zagreb, 17 December.
World Health Organization
First Article Inspection Reports (FAIRs) Instructions for Suppliers
Introduction CSWIP (Certification Scheme for Welding and Inspection Personnel) is administered by The Welding Institute. The CSWIP certification process.
ISO/IEC
Administration of a FIDIC Contract - Project Control
WORKSHOP INTRODUCTION
First Article Inspection
Quality Management Systems – Requirements
First Article Inspection (Per AS9102)
First Article Inspection Reports (FAIRs) Instructions for Suppliers
This teaching material has been made freely available by the KEMRI-Wellcome Trust (Kilifi, Kenya). You can freely download,
Technical requirements:
SQA01 Guidance Material: FAI Review
Good Laboratory Practices
Operationalizing Export Certification and Regionalization Programmes
First Article Inspection
How to conduct Effective Stage-1 Audit
Supplier Briefing Pack
Radiopharmaceutical Production
Presentation transcript:

Inspection and Testing Prepared By:- Mr. Amit Phogat (Lecturer in Mechanical Deptt.) Approved for Public Release

Inspection and Testing Introduction All materials and services supplied to Electric Boat must be inspected and tested in accordance with Purchase Order invoked specifications, drawings, standard clauses, etc. Determine if supplier or government have additional or more stringent requirements. Inspection and Testing Approved for Public Release

Introduction (continued) Purchase order imposes inspection systems via EB2678 and Standard Clauses (60-5, 60-19, 60-58) for MIL-I-45208, MIL-Q-9858, or ISO9000 series Accordingly, suppliers must establish and maintain a compliant inspection system System must also address subtier suppliers Be aware of Supplemental Technical Requirements (60-58 STRs) for ISO9000 Inspection and Testing Approved for Public Release

Introduction (continued) Inspection and Testing that result in OQE must be performed by a supplier’s organization independent of production, i.e., the Quality Control Department. Inspection and Testing Approved for Public Release

3 Basic Types of Inspection: Receiving Inspection verifies acceptability of materials, services, and associated documentation at receipt. Inspection and Testing Approved for Public Release

3 Basic Types of Inspection: In-Process Inspection performed at manufacturing stages deemed necessary to verify: internal compliance with requirements as production progresses, statistical process control charting, non-accessible assembly, etc. as required by the purchase order, drawing, or specifications to be an EB or Government Hold/Witness Point (SC37-8 series). Inspection and Testing Approved for Public Release

3 Basic Types of Inspection: Final Inspection shall verify that the product is dimensionally acceptable, properly assembled, and the documentation is satisfactory in accordance with the purchase order. Inspection and Testing Approved for Public Release

Inspection and Testing Requirements Inspection and Testing must be accomplished using clear, complete, and current procedures and instructions Inspection and Testing shall be performed in appropriate environmental conditions with respect to temperature, humidity, noise, vibration, etc. Inspection and Testing Approved for Public Release

Requirements (continued) Instruction needs to specify: Source of the inspection or test criteria drawing, specification, standard clause, etc. Gaging or tooling required to ensure proper accuracy of measurements Provision for recording the actual results as objective quality evidence for reference Inspection and Testing Approved for Public Release

Requirements (continued) When required by a standard clause (10, 60, 76 series), drawing, or specification, procedures shall be approved by Electric Boat on a Vendor Procedure Approval Request (VPAR), prior to performance of the testing. Inspection and Testing Approved for Public Release

Requirements (continued) Examples of Testing Procedures requiring Electric Boat approval: NDT Procedures Noise Testing Procedures Shock Testing Procedures Vibration Procedures Inspection and Testing Approved for Public Release

Requirements (continued) Examples of Testing Procedures requiring Electric Boat approval (continued): Forging test specimen location drawings Production Procedures (when specified by the Purchase Order or Procurement Specification) Qualification and First Article Procedures (when specified by the Purchase Order or Procurement Specification) Inspection and Testing Approved for Public Release

Electrical Testing Dielectric Voltage Withstand Test Dielectric Voltage can be a Destructive test. Voltage Level and time should be considered. Example: Operating Voltage is 440VAC Test at 2 X 440 +1000VAC= 1880VAC Inspection and Testing Approved for Public Release

Electrical Testing Insulation Resistance An Insulation Resistance test is normally done with DC and is usually performed at a lower voltage level such as five (500VDC) hundred volts. An IR test measures the quality of the insulation system and provides a measure in ohms or megohms. It is sometimes used before a HiPot Test as both a predictor of a failure condition and to provide a quantitative value of the insulation system. Often performed before, during and after Hydro on Electrical Hull Penetrators. Inspection and Testing Approved for Public Release

Inspection and Testing Electrical Testing Continuity Determines if there is an uninterrupted electrical connection between two points. Resistance or DC Resistance Measured in ohms The opposition to current flow Report actual results EX: > 1 Ohm Inspection and Testing Approved for Public Release

Inspection and Testing Documentation Inspection and test results shall be documented, preferably on a company form with letterhead. Inspection and test results must clearly indicate: the type and number of inspections or tests performed the results of the inspection or test the signature/date of personnel performing the test additional requirements of the applicable SC76-9 series Inspection and Testing Approved for Public Release

Documentation (continued) When required by the Purchase Order, generally a Standard Clause, the Inspection and Test Reports shall be provided to Electric Boat. Inspection and Test Reports shall not contain any qualifying statements, such as “to the best of our knowledge”, “while in our possession”, “approximately”, etc. Inspection and Testing Approved for Public Release

Documentation (continued) All instruments, gages, and tools used to perform official inspections and tests must be calibrated in accordance with a documented calibration program. Actual instruments, gages, and tools used to perform official inspections and tests should be identified and listed in the inspection or test report: provides additional objective quality evidence traceability if gage out of calibration Inspection and Testing Approved for Public Release

Documentation (continued) Inspection Records and Test Reports shall be traceable back to the product being tested or inspected and the applicable procedures or instruction being used. Corrections of errors on Inspection Records or Test Reports shall be in accordance with the requirements of Electric Boat Specification 2678. Inspection and Testing Approved for Public Release

Inspection and Testing Suggestion Initiate a method and procedure defining type and accuracy of gages to be used for dimensional inspection of particular attribute tolerance ranges Gage for +/-.020” tolerance different than +/-.0005” tolerance as is a 50psig test different than a 500psig test 10% rule Inspection and Testing Approved for Public Release

Inspection and Testing Suggestion To better ensure that the integrity and caliber of the inspection system and the personnel are being maintained: Implement an overcheck program that periodically confirms inspector results Implement a refresher training and qualification program for inspectors (similar to NDT, welding, etc.) Inspection and Testing Approved for Public Release