CEOS Sea Surface Temperature Virtual Constellation (SST-VC)

Slides:



Advertisements
Similar presentations
WGClimate Work Plan for John Bates, Chair WGClimate 4th Working Group on Climate Meeting.
Advertisements

CEOS-CGMS Working Group on Climate John Bates, NOAA SIT-30 Agenda Item #11 Climate Monitoring, Research, and Services 30 th CEOS SIT Meeting CNES Headquarters,
GEO ADC meeting, Washington DC, USA, Sep Slide # 1 DA DA Virtual Constellations Ivan Petiteville, CEOS GEO ADC Meeting, Washington DC,
Integrated ocean surface products Julia Figa-Saldaña, Hans Bonekamp EUMETSAT CEOS WG/VC working day EUMETSAT, Darmstadt, Germany 16 th September 2015.
Overview: CEOS Capacity Building Activities CEOS Systems Engineering Office (SEO) WGCapD-5 Agenda Item 24 Working Group on Capacity Building & Data Democracy.
Information on a potential CEOS Sea Surface Temperature Virtual Constellation (SST-VC) Craig Donlon (ESA) Kenneth S. Casey (NOAA) CEOS Plenary, Rio De.
GHRSST/CEOS SST-VC, V1, 13 May 2014 Coordination Group for Meteorological Satellites - CGMS Add CGMS agency logo here (in the slide master) Coordination.
Incoming Themes for 2017 Frank Kelly, USGS
Analysis Ready Data LSI-VC – Adam Lewis Co-chair
Committee on Earth Observation Satellites
CEOS Work Plan Andrew Mitchell - NASA WGISS-43
CEOS Carbon Strategy – WGClimate Actions
CEOS-30 Action Status Agenda Item 1.2 CEOS Plenary 2017
Committee on Earth Observation Satellites
WGISS Working Group for Information Systems & Services
Title Goes Here Name (s), Organization, CEOS Affiliation CEOS SIT-33
Title Goes Here Name (s), Organization, CEOS Affiliation CEOS SIT-33
CEOS Status/Overview Steven Hosford WGCapD-7 Agenda Item #6
LSI-VC Jenn Lacey, USGS, LSI-VC Co-Lead CEOS SIT-33
Extension of ARD concept to Atmosphere and Oceans?
Committee on Earth Observation Satellites
CEOS Plenary 2018 Astrid – Christina Koch, European Commission
Title Goes Here Name (s), Organization, CEOS Affiliation CEOS SIT-33
Return to First Principles
WGCapD: Working Group on Capacity Building and Data Democracy
WGCV Chair’s Report K. Thome NASA WGCV Plenary # 44
CEOS and GEO Workplan Review
CEOS Status/Overview Steven Hosford LSI-VC-5 Agenda Item #1.4
CEOS/CGMS Working Group Climate
Session 2: Analysis Ready Data
Introduction to the VC-WG Day
Session 6: Ad hoc Teams Introduction
Session 4: Working Groups Introduction
Precipitation Virtual Constellation (P-VC)
Precipitation Virtual Constellation (P-VC)
WGISS Working Group for Information Systems & Services
CEOS SIT Chair Priorities
Proposed 2019 CEOS chair initiative
Atmospheric Composition VC Report
Committee on Earth Observation Satellites
2016 Plenary Themes Alex Held, CSIRO
Session 3: Virtual Constellations Introduction
Review of Chair Priorities
LSI-VC Work Plan Updates
Committee on Earth Observation Satellites
SIT Chair Priorities and SIT-33 Objectives
WGCapD: Working Group on Capacity Building and Data Democracy
WGCapD Perspectives of Work Plan –
Discussion Virtual Constellations
SIT Chair Introduction
CEOS Virtual Constellations Process Paper
WG Capacity Building & Data Democracy (WGCapD)
WGCapD: Working Group on Capacity Building and Data Democracy
WGCapD: Working Group on Capacity Building and Data Democracy
SIT-31 Sessions CEOS SIT Chair Team ESA/ESRIN, Frascati, Italy
WG Disasters Observation for Disasters
SIT Chair Priorities and SIT-34 Objectives
VC Title Goes Here Name (s), Organization, CEOS Affiliation
AHT Title Goes Here Name (s), Organization, CEOS Affiliation
WG Title Goes Here Name (s), Organization, CEOS Affiliation
Freshwater from Space Discussion -Next Steps
Precipitation Virtual Constellation
Committee on Earth Observation Satellites
Atmospheric Composition Virtual Constellation (AC-VC)
Update on OCR-VC Activities & Actions
Committee on Earth Observation Satellites
Sea Surface Temperature – Virtual Constellation
Precipitation-Virtual Constellation
VC/WG/AHT Working Day Outcomes
CEOS Analysis Ready Data Strategy
Presentation transcript:

CEOS Sea Surface Temperature Virtual Constellation (SST-VC) Committee on Earth Observation Satellites CEOS Sea Surface Temperature Virtual Constellation (SST-VC) Kenneth S. Casey/NOAA and Anne O’Carroll/EUMETSAT, SST-VC Co-Chairs CEOS SIT-33 Session 3: Virtual Constellations, Agenda Item 3.2 Boulder, CO, USA 24 – 25 April 2018

SST-VC Related Action Items CEOS Work Plan and Action Status for the SST-VC (1 of 2) SST-VC Action Status SST-VC Related Action Items Est. Date Action Status CEOS-31-06 End 2017 LSI-VC to provide CEOS VCs with a CARD4L package to stimulate their feedback on the Framework and to allow the VCs to assess the applicability to their work. LSI-VC will utilize feedback to inform their recommendations for a broader ARD strategy. Complete. Comments provided during SIT Tech Workshop 2017 on complementarity between CARD4L and SST-VC/GHRSST Regional-Global Task Sharing Framework (R/GTS) and GHRSST Data Specification (GDS). Written response provided to A. Siqueira last week to close action. CEOS-31-07 CEO to establish a CEOS Work Plan task to track the sea surface temperature passive microwave radiometer continuity issue, and encourage all agencies to support the forthcoming workshops on this matter in North America and Europe. Complete. “VC-35: Passive microwave radiometer continuity” CEOS 2018-2020 Work Plan item created. See next slide for Work Plan item status. SITTWS-2017-19 Apr 2018 CEOS agencies to support continuity and redundancy of PMW for SST via the upcoming PMW workshop (April 2018, USA TBC) No progress. Meeting not scheduled to our knowledge. Provide max total of five slides to address these points in your final presentation Suggestion - 1 slide each to address Linkages to CEOS Work Plan (e.g. action numbers), open SIT and Plenary actions Indication of required decisions and discussion points Team Achievements and Planned Outcomes [See slide 9] Synergies amongst teams (e.g. VC-VC, VC-WG, WG-VC, WG-WG, other) [See slide 10] Sustainable commitment [See slide 11] Proactive Consideration of Plenary and SIT TWS deliverables and discussion items CARD4L: CEOS Analysis Ready Data For Land

Background Information CEOS Work Plan and Action Status for the SST-VC (2 of 2) SST-VC CEOS Work Plan Status CEOS 2018-2020 Work Plan Item Est. Date Background Information Status VC-19: Documented plan for the SST Virtual Constellation Q3 2018 Building on Donlon, et al (2010) … .the SST-VC will describe and justify the requirements and design for the modern virtual constellation for SST... Complete draft to be circulated in early May 2018 for review prior to SST-VC meeting in Darmstadt in June. On schedule for issue in Q3 2018. VC-35: Passive microwave radiometer continuity Q4 2018 Coordinate inter-agency efforts to seek continuity and redundancy of Passive Microwave Radiometer observations for SST. Presentation to ECMWF/ESA workshop on using low frequency PMW in research & operations. See: www.ecmwf.int/en/learning/workshops. AMSR-2 follow-on mission discussion. Copernicus High Priority Candidate Missions (HPCM): ESA coordinating mission requirements for the Polar Ice and Snow Copernicus Imaging Microwave Radiometer (CIMR). Two parallel Phase A/B1 contracts are now being negotiated; 1st CIMR MAG has met; Consolidated MRD by kick-off of industrial contracts expected in May. Provide max total of five slides to address these points in your final presentation Suggestion - 1 slide each to address Linkages to CEOS Work Plan (e.g. action numbers), open SIT and Plenary actions Indication of required decisions and discussion points Team Achievements and Planned Outcomes [See slide 9] Synergies amongst teams (e.g. VC-VC, VC-WG, WG-VC, WG-WG, other) [See slide 10] Sustainable commitment [See slide 11] Proactive Consideration of Plenary and SIT TWS deliverables and discussion items CIMR: Polar Ice and Snow Copernicus Imaging Microwave Radiometer MAG: Mission Advisory Group MRD: Mission Requirements Document

SST-VC Team Achievements and Planned Outputs Sea Surface Temperature is a designated ECV Currently ~90 GHRSST-compliant products in the SST-VC catalog and CWIC, with numerous data discovery standards (CSW, OpenSearch, schema.org) and access standards (OPeNDAP, TDS, WCS, WMS) Six of the GHRSST datasets are considered climate data records (four AVHRR Pathfinder products at Levels 2 and 3, and two Level 4 Daily OISST products), and extend back into the early 1980s Items that can be followed-up in the next year: SST constellation white paper GHRSST XIX and SST-VC-7 Workshop on understanding SSTs Over and Around Reefs (SOAR) in planning and hosted by the Australian Institute of Marine Science and NOAA Coral Reef Watch (27-31 Aug 2018, Townsville) Ongoing efforts by GHRSST/SST-VC in both data management and constellation definition can contribute to future CEOS coordination and agency planning efforts For clarity on the team contribution to the global observing architecture and national planning purposes, please summarise major past achievements and planned future outputs, especially in terms of: Specific datasets, products, or standards ECVs Architecture studies Gap analyses / advocacy And comment on the availability of these to contribute to future coordination efforts by CEOS or mission planning activities of its agencies Identify items that can be followed-up in the next year

SST-VC Perspectives on Synergies Among Teams For the SST-VC, natural synergies exist with WGISS, WG-Climate, and the other ocean VCs Synergies also exist with other VCs interested in PMW radiometry, like the Precipitation-VC SST-VC believes there could be more synergies and commonalities around data format standards and data content standards, to achieve greater interoperability across VCs and relevant applications Brainstorming results: Coordinated efforts with CARD4L, to link GHRSST Data Specification and CARD4L product specifications? Closer collaboration with WGISS, cross-VC common data standards? More active and direct involvement in COVERAGE and/or Blue Planet? ... For your team, please identify synergies that exist, or should exist, between the VCs and the WGs to support the broader CEOS objectives including opportunities for the framework provided by WG activities to align with and support the thematic activities and aspirations of your VC or all VCs Identify also any obstacles/barriers to progress and suggestions for how to overcome those obstacles/barriers.

The SST-VC and Sustainable Commitment BoM/CSIRO, CMA, ESA, EUMETSAT, ISRO, JAXA, KMA, NASA, NOAA, SANSA, and UKSA comprise the SST-VC All agencies listed are actively participating, and we consider this a viable team. Participation levels and intensities vary based on the particular topics being addressed. BoM, ESA, EUMETSAT, JAXA, NOAA, and NASA all actively create GHRSST-compliant data. The others are active in the discussions and meetings, but are not yet submitting GHRSST-compliant data SST-VC meets in person once each year, collocated with GHRSST Science Team meetings. Ad hoc teleconferences held as needed. Travel support to get people to the annual face-to-face meeting is the single biggest obstacle. This challenge is felt mostly by the US agencies, but other agencies sometimes struggle with this aspect. Identify the active agencies in your team and whether this implies a viable team for your objectives How frequently does your team physically meet? Are their any obstacles to the future viability of your team meeting its objectives? A full and frank understanding of the status and outlook for each group will help CEOS understanding of their potential contribution to the observing strategy

Thanks! Any Questions? Questions? Kenneth.Casey@noaa.gov Anne.OCarroll@eumetsat.int