IC network selection process

Slides:



Advertisements
Similar presentations
WG 2A ECOSTAT 4-5 MARCH 2004 Task on Harmonisation of Freshwater Biological Methods Progress Report Presented by Ana Cristina Cardoso Joint Research Centre.
Advertisements

WG 2A ECOSTAT 7-8 July 2004 Task on Harmonisation of Freshwater Biological Methods Status Report AC Cardoso and A Solimini Harmonisation Task Team: JRC.
WG 2A ECOSTAT Meeting 4-5 March 2004 Meeting of the WFD CIS Working Group 2A ECOSTAT summary Presented by Anna-Stiina Heiskanen Joint Research Centre The.
WG2A meeting 7-8 October 2004 Working Group 2A ECOSTAT Agenda item 9b Discussion on final Intercalibation register.
Working Group 2A ECOSTAT Finalisation of the intercalibration register Presented by Wouter van de Bund Joint Research Centre Institute for Environment.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
NE ATLANTIC GEOGRAPHICAL INTERCALIBRATION GROUP (NEA GIG)
Task on Harmonisation of Freshwater Biological Methods
Intercalibration excersice progress report Presented by Palle Haastrup Joint Research Centre Institute for Environment and Sustainability Inland.
Common Implementation Strategy for the Water Framework Directive Working Group A ECOSTAT Ecological Status 7th Meeting Stresa, Lago Maggiore, Italy
Project Objectives, Workplan and Timescales
D5 EUTROPHICATION REVIEW PROCESS
Results of the metadata analysis Meeting of the Working Group 2A on Ecological Status (ECOSTAT) March 4-5 , 2004, Ispra, Italy Peeter Nõges Anna-Stiina.
SW/MW guidance Milestones
Synthesis of the intercalibration process Working group 2.5.
Working Group 2A ECOSTAT Objectives & Agenda of the meeting March 2005
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Chemical Monitoring mandate
Intercalibration Report on State - of - play and way forward Presented by Anna-Stiina Heiskanen Joint Research Centre The Institute for Environment.
WG 2A Ecological Status First results of the metadata collection for the draft intercalibration register 2nd meeting WG2A, 15-17/10/03.
Task 1 - Intercalibration WG 2A ECOSTAT - Intercalibration
Progress report Working Group D - Reporting SCG meeting May 2008 Unit D.2 Water and the Marine - WFD Team.
Review of Decision 2010/477/EU and MSFD Annex III
Working Group 2A ECOSTAT Intercalibration process - state of play Wouter van de Bund & Anna-Stiina Heiskanen Joint Research Centre Institute for Environment.
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, October 2005 Progress in the intercalibration exercise.
Task on harmonization WFD Annex V 1.3.6
Water Directors’ Meeting Common Implementation Strategy
Progress report ATG Hymo 1 May – 20 October 2016
19th meeting of the WG GES 22/03/2018
WG 2.5 Intercalibration.
Progress report Working Group D - Reporting SCG meeting May 2008 Unit D.2 Water and the Marine - WFD Team.
Discussion agenda Summary & proposals (30 min)
Common Implementation Strategy for the
Update on progress since last WG meeting (13-14 June 2002)
Meeting of the WFD CIS Working Group 2A ECOSTAT Introduction & objectives Presented by Anna-Stiina Heiskanen Joint Research Centre The Institute.
Working Group A Ecological Status - ECOSTAT State of play in the intercalibration exercise Water Directors Meeting, November 2005.
Outcome of 2^ Seminar of the WG 2.7 Roma, January
INTEGRATED TESTING OF GUIDANCE DOCUMENTS IN PILOT RIVER BASINS
on a protocol for Intercalibration of Surface Water
Project 2.7 Guidance on Monitoring
Progress Report Working Group A Ecological Status Intercalibration (1) & Harmonisation (3) Activities Presented by Anna-Stiina Heiskanen EC Joint Research.
Intercalibration Decision and Technical Report
of the Work Programme 17. March 2003
WFD – CIS Working group A ECOSTAT
Pilot River Basin Water Framework Directive.
WG A Ecological Status Progress report April-October 2009
EU Water Framework Directive
Water Directors meeting Mondorf-les-bains, June 2005
Harmonisation and standardisation – Status and way forward
Working Group A ECOSTAT progress report on Intercalibration Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Water Directors meeting Warsaw, 8-9 December 2011
Common Implementation Strategy for the Water Framework Directive
Working Group 2A ECOSTAT Guidance for the intercalibration process Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
River groups with extension
Metadata analysis.
WFD CIS 4th Intercalibration Workshop
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, 22 Febraury 2006 Progress Report.
Common Implementation Strategy for the
WG A Ecological Status Progress report April-October 2010
EU Water Framework Directive
Common Implementation Strategy for the
EU Water Framework Directive
WG A ECOSTAT Draft Mandate
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Fish intercalibration – rivers Progress and expected outcome
ECOSTAT nutrient work : Brief update February 2017
WG A Ecological Status Progress report October 2010 – May 2011
History EU+Norway Water Directors meeting in Paris Oct 2000 Member States and the European Commission agreed in Paris to developed a Common Strategy.
Why are we reviewing reference conditions in intercalibration?
Presentation transcript:

Summary of activities & next steps from the 4th Intercalibration Workshop

IC network selection process Instruction ‘manual’ for selection of sites for IC network / incl. Geographical IC groups, Common surface water body types/ pressures/ quality elements selected for Lakes, Rivers, Coastal and Transitional Waters” prepared and communication coordinated by EEWAI Draft distributed for comments to WG & Experts: 9 April Communicate with your experts! We prefer only one response per country! Comments expected by: May 1 to email: EEWAI@jrc.it Final ‘Manual’ distributed together with metadata questionnaire to all WG & experts on 15 May

Timetable for IC selection process Questionnaire sent to MS & CC May 15 MS & CC provide metadata End of July Expert evaluations of metadata Sep-October Meeting of ECOSTAT WG Late October IC draft register ready November 20 Meeting of Art 21 Comm December 4-5

Drafting groups 3) Guidance for IC exercise (start later/ september) 1) Classification (start: ASAP) nominations by 15 April to: silvia.kerzmar@uba.de 2) Harmonization/ Standardization state-of-play (start: ASAP) Coastal expert (based on on-going work of Coast gr) Inland waters expert/ former monitoring gr expert CEN- representative Commission/ JRC nominations by 15 April to : eewai@jrc.it 3) Guidance for IC exercise (start later/ september) nominations by 15 April to: eewai@jrc.it

Ecological Status WG: Meetings in 2003 Kick-off of ECOSTAT WG, in Brussels July 1-2 Drafting group on Classification June 3 Drafting gr. Classification & Eutrophication Sept. (tbc) IC sites selection Experts meetings Sept-Oct. 1) rivers & lakes, 2) coastal waters (TBC) ECOSTAT WP (IC draft register, final agreement on classification paper) at JRC/ Ispra Week 43 (20-24 October - to be confirmed)

Accession countries involvement Accession countries (Experts & WG members) will receive compiled site selection manual for comments as MS representatives - they need to join the process as others Baltic countries meeting this week - WG leaders (JRC) will present output of this meeting ICPR meeting next week - Austria will present Odra river int. commission meeting next week Other AC outside these meetings will be contacted & informed separately by WG leaders (JRC) all AC will need to join expert groups & WG JRC will fund participation of CC experts in one of the workshops in 2003 JRC/ EEWAI will be focal point for information for AC CC