Taking AWP Global Yogesh Srivastava Co-Chair of AWP Committee at COAA

Slides:



Advertisements
Similar presentations
Amitava Mitra, Solution Architect, Oracle Primavera, TCS
Advertisements

HEAT TRACING SPECIALIST
Just-In-Time and Lean Systems
Workface Planning APEGGA Conference Apr 2007 Jeph Virtue.
Just-in-Time and Lean Systems
Chapter 7 – Just-in-Time and Lean Systems Operations Management by R. Dan Reid & Nada R. Sander s 2 nd Edition © Wiley 2005 PowerPoint Presentation by.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
Lean Manufacturing Case Study Prototype Design-Build.
Lean operations and JIT
JUST IN TIME. Just in Time Getting the right quantity of goods at the right place at the right time.
BIM Overview Stacy Scopano. AEC is a fragmented industry.
Freeleansite.com The Lean Enterprise Why Change ? Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
Year 12 Business Studies Operations REVIEW.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
Construction Work Packaging
JIT and Lean Operations
Chapter 7 – Just-in-Time and Lean Systems
Project Team 191: Lean Principles in Construction.
Supply Chain Management Ontology Kanchan Karadkar MS in Industrial Engineering December 2, 2013.
Chapter 14 Global Production, Outsourcing and Logistics 1.
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
Lean Production.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Operations Management Optimising operations. The aim of an OM system is to extract maximum productivity and quality from the production process. This.
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
Operations Fall 2015 Bruce Duggan Providence University College.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
Main Function of SCM (Part I)
I © 2015 Bentley Systems, Incorporated Andrew Smith, Feb 2016 How BIM can positively influence rail O&M.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
to prevent delay in Engineering and construction management
Construction Work Packaging
Software Engineering cosc 4359 Spring 2017.
advices for advancing the productivity of the construction industry:
Director’s Progress Review Closeout Meeting
INTRODUCTION Kaizen is the Japanese word for "improvement" or "change for the better" refers to a philosophy or practices that focus upon continuous.
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
What is Lean Construction?
Lean operations and JIT
Project Management BBA & MBA
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Turning LEAN into GREEN
Supply Chain Management Principles
Inputs and Outputs to Aggregate Production Planning
The Times 100 Business Case Studies
Pull Manufacturing and Just In Time
PRODUCTION.
Lean Manufacturing and Just-In-Time Philosophy
Copyright Scott Bloss, All rights reserved.
KEYNOTE STAGE SPONSOR.
Leading Indicators and Dashboarding for Advanced Work Packaging
Lean thinking in EPC Projects
BIM - Building Information Modeling A well-structured BIM is a key to achieve success in the Building Design and Construction process. Qatar Green Leaders.
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
© LEAN CONSTRUCTION INSTITUTE
Just-In-Time and Lean Production
Path of Construction Enhancing the Best Practice for Engineering & Supply Chain to Support AWP Implement Presenters: Glen Warren – COAA Co-Chair, Industry.
History of Project Management: Post 1950s
Part II Project Planning © 2012 John Wiley & Sons Inc.
MODERN TRENDS IN PRODUCTION ENGINEERING
Director’s Progress Review Closeout Meeting
Tips for success and traps to avoid
Japanese Production Methods
Keepin’ it Real A CII / COAA Panel Discussion Glen Warren Bill O’Brien
Operations Management
Controlling Project Cost and Schedule
Quality Management MNGT 420
Presentation transcript:

Taking AWP Global Yogesh Srivastava Co-Chair of AWP Committee at COAA Global Director, Hexagon PPM Construction, Fabrication & Planning Solutions Co-Chair of AWP Committee at COAA Contributing author of CII/COAA RT 272 - AWP Best Practice

14/11/2018

CII-COAA: Advanced Work Packaging Volume I: Recommended Process Volume II: Implementation Guidance Volume III: Case Studies and Expert Interviews

AWP Definition AWP is the overall process flow of all the detailed work packages (CWPs, EWPs, and IWPs). It is a planned, executable process that encompasses the work on an engineering, procurement, and construction (EPC) project, beginning with initial planning and continuing through detailed design and construction execution. Advanced work packaging provides the framework for productive design and progressive construction, and presumes the existence of a construction execution plan. CII-COAA, IR 272-2, Vol. 1 “AWP provides a structured method and work process for early engagement of construction considerations and expertise in advance to influence engineering design, project controls, and supply chain and their related processes, in scoping, coding and prioritizing the deliverables in alignment to the build method and path of construction on a project.” Yogesh Srivastava, Co-chair COAA AWP Committee, CII-COAA AWP Best Practice IR 272 contributing author

Industry being challenged for… Improve Safety & Quality Cost Certainty Visibility Cost Certainty Scope clarity Subcontractors Enhance Productivity Leadership Schedule Certainty Material Confidence Schedule Certainty Adoption of Best Practices Cultural: Working in other regions such as Middle East Asia Pacific North America Company specific Europe

AWP/WFP Best Practices continue to evolve Construction Industry Institute (CII) & COAA’s research team delivered an end to end AWP/WFP Process view Source: CII

The AWP Work Process WORK PACKAGES / COMPLETION / TURNOVER PWPs Unit EWP: Engineering deliverables CWP: EWP + Construction IWPs: Foreman level work execution package FIWP: Field installation work packages MIWP: Module Installation work package Sub systems System Packages CWA (Construction Work Areas) Project Controls Work Break Down Sub Areas PWPs EWPs CWPs IWPs IWPs Executed TCPs / Sub Systems System Packages Functional Control Work Break Down Engineering Design Construction Planning Field/ Mods Execution Start of Progressive Turnover Sub system / Tag based Turnover Turnover Completion Reproduced with permission from Teknoplant

AWP: Basic Design, Stage 1 Setup of WBS Structure / Coding Design Area Definition Project Database & Server Level 3 Schedule CWP Execution Plan EWP Release Plan SCM Plan Design, Plot Plan & Estimate Path of Construction CWAs and Early CWPs / EWPs Reproduced with permission from Teknoplant

AWP: Detail Design, Stage 2 Incorporate Turnover Requirements (O&M Review) CWPs/EWPs (3D Model) Project Database & Server Level 4 Schedule Update CWP Execution Plan with IFC defn. Issue EWPs Issue POs IWP Release Plan EWP Progress Align Doc Management Early IWPs Reproduced with permission from Teknoplant

AWP: Construction Execution, Stage 3 Workface Planning Release CWPs and create IWPs IWP based Bag & Tag Materials Project Database & Server Level 5 Schedule IFC Issue EWPs, CWPs & IWPs Issue POs IWP Progress Identify and Manage Safety, Constraints, Equipment, Services Execute IWPs and start completions Reproduced with permission from Teknoplant

AWP: Construction Completions, Stage 3 Pre-startup Safety Reviews QC Documentation / Punch lists Project Database & Server Issue IWPs for Systems As-Builts Compilation Build TO Packages System Completions As-Builts Build System Packages Reproduced with permission from Teknoplant

Construction: An industry at a changing phase Architecture, Engineering & Construction Process, Power, Marine BIM AWP LEAN Manufacturing

Economies of Information The need for increased efficiency, productivity & cost certainty in project delivery Architecture, Engineering & Construction Process, Power, Marine Economies of Scope WORK PACKAGES Economies of Information DATA CENTRICITY BIM AWP Economies of Time JIT, TQM, Kanban LEAN Manufacturing

LEAN, BIM & AWP can be synergistic Process, Power, Marine Architecture, Engineering & Construction AWP LEAN BIM Manufacturing

LEAN

Japanese Management Lean Production Total Quality Management Just in Time Kanban Kaizen Continuous Improvement Theory Z Company for Life

LEAN Production "Lean production is a superior way for humans to make things. It provides better products in wider variety at lower cost. Equally important, it provides more challenging and fulfilling work for employees at every level, from the factory to headquarters.“ Idea is to be focused on the importance of getting things right the first time rather than spending a lot of time checking afterward Japanese Management Lean Production Total Quality Management Just in Time Kanban Kaizen Continuous Improvement Theory Z Company for Life

Economies of Scope The Change in Lean Approach They found the system rife with muda -- a Japanese term that encompasses wasted effort, wasted material and wasted time “Lean production: Its genius was to shift the focus of manufacturing from economies of scale to "economies of time." Japanese Management Lean Production Total Quality Management Just in Time Kanban Kaizen Continuous Improvement Theory Z Company for Life Construction: Add a Quanta called Package Economies of Scope

Principles behind Lean The first was by making every employee a quality checker, responsible for spotting errors as they happen and correcting them immediately. Toyota gave workers the right to stop the production line as soon as they saw errors. Second was - started making components "just in time," with parts arriving just as they were needed on the production line. The third way to save time was "demand pull.“ Kanban Japanese Management Lean Production Total Quality Management Just in Time Kanban Kaizen Continuous Improvement Theory Z Company for Life

Classical Mass Production Methods: The first is the inability of a classic mass-production system to respond to rapid changes in demand. Mass producers tend to be much keener on keeping standardized designs The second cost is an unacceptably high rate of faulty products. Large batches make it difficult to detect defects. Japanese Management Lean Production Total Quality Management Just in Time Kanban Kaizen Continuous Improvement Theory Z Company for Life

Rework Causes: Alberta Example 13% 18% 30% 26% 13%

Principles of LEAN The first was by making every employee a quality checker, responsible for spotting errors as they happen and correcting them immediately. Toyota gave workers the right to stop the production line as soon as they saw errors. Second was - started making components "just in time," with parts arriving just as they were needed on the production line. The third way to save time was "demand pull.“ Kanban

BIM

What is BIM BIM is an approach to design, construction and management of assets. It supports the continuous and immediate availability of project design scope, schedule and cost information that is reliable, integrated, fully coordinated, and of a high quality. Cost Schedule Clash Facility Management Analysis

BIM Technology Evolution

AWP

AWP: Managing scope by work packages across stages “AWP provides a structured method and work process for early engagement of construction considerations and expertise in advance. Incorporating these in engineering design, project controls, supply chain and their related processes, project efficiencies are increased by managing scope, coding and prioritizing the deliverables in alignment to the build method and path of construction on a project.” Yogesh Srivastava, Co-chair COAA AWP Committee, CII-COAA AWP Best Practice IR 272 contributing author

The AWP Work Process WORK PACKAGES / COMPLETION / TURNOVER PWPs Unit EWP: Engineering deliverables CWP: EWP + Construction IWPs: Foreman level work execution package FIWP: Field installation work packages MIWP: Module Installation work package Sub systems System Packages CWA (Construction Work Areas) Project Controls Work Break Down Sub Areas PWPs EWPs CWPs IWPs IWPs Executed TCPs / Sub Systems System Packages Functional Control Work Break Down Engineering Design Construction Planning Field/ Mods Execution Start of Progressive Turnover Sub system / Tag based Turnover Turnover Completion Reproduced with permission from Teknoplant

Building Information Modeling Plant Life-cycle Management 7D: Component Data & Specs Cost & Estimate 6D: Visualization Schedule Integration 5D: Cost & Estimate Visualization TECHNOLOGY EVOLUTION BUSINESS PROCESS & 4D: Schedule Integration 2D Drawing outputs 3D Model 3D Model Drawings Components and Specifications Architecture, Engineering & Construction Process, Power & Marine

Convergence of BIM and PLM; differing routes to the same end DATA CENTRIC BIM / PLM PLM AEC Drawings 3D Model 4D: Schedule Integration 5D: Cost & Estimate 6D: Visualization 7D: Component Data & Specs Process, Power, Marine Component Data & Specs 3D Model 2D Drawing outputs Visualization Schedule Integration Cost & Estimate