Duct Insulation Attachment Team Portland State University Michael Thilavanh, Osten Palmrose, Chase Doyel, Clint Everett, Haoyuan Xu, Sheng Chen
Overview Project Sponsor Project Overview and Targets Initial Concepts Research and Experimentation Final Design Recommendations and Next Steps Questions
Project Sponsor Streimer Sheet Metal Works Inc. Air Duct Assembly Manufacturing Started in 1946 after WWII Family owned business Company Advisor: Mark Van Sickle (Manufacturing Manager) Faculty Advisor: Robert Paxton
Project Overview Duct Insulation Attaching Mechanism
Project Overview and Targets Goals: 20% speed improvement 95% fastening success rate Accommodates 1 and 2 inch Gripnails or Weld Pins Accommodates various shape, size sheet metal Manufacture machine
Initial Concepts External and internal research done by team Designed three possible machines Number of heads Gripnail vs. Weld Pin Safety features Flat surface or Grid surface Could also redesign and improve existing machine
Initial Concepts (Cont.)
Research and Experimentation Fastening Strength Gripnail impact test Gripnail and Weld Pin extraction test Finite Element Analysis Frame Design Modal Analysis
Final Design
Linear Motion and Hopper Hopper placed top of each actuator 3 moveable heads, 1 stationary head Move along single ACME screw Supported by upper and lower rail
Frame and Impact Surface I-beam for the center column Square tubing for frame structure FEA analysis showed greater frame strength with gusset Raised harden impact surface
Actuators Secondary actuator loads Gripnail Magnet holds Gripnail Lasers
Control Panel 8 electronic air solenoids 4 for impact actuator 4 for loading actuator PLC unit for machine control Moisture separator
Recommendations and Next Steps Proof of Concept Phase Order Components Refine Bill of Materials Development Impact Mechanics and Feeding System Actuator Movement Frame Structure
Questions?