Tertiary Vacuum Control

Slides:



Advertisements
Similar presentations
Air and Water Chiller Basic Class
Advertisements

1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Michael Hoch / EP-AIT1 TPC Resistor Rod. Michael Hoch / EP-AIT2 Resistor Chain: Design Constrains  current per resistor chain: 241  A = 25W (total =
Gas ammonia out to turbine poor mixture water/ ammonia rich mixture water/ ammonia Gas Assisted Solar Absorption Heat Engine GASAHE heat Diffusion absorption.
1 Nikhef Activities on CO 2 Cooling Bart Verlaat, Nikhef Introduction meeting with FOM director W. van Saarloos 1 Picture: LHCb-VELO evaporator.
CWS 70ºF CWR 80ºF Cooling Tower Humid air Out with heat Dry air In Central Energy Plant A/C Unit Work EMCS 404 Chilled Water Supply 40ºF Chilled Water.
PRR TRD COOLING A. Marín (GSI) 7/01/2004 ALICE PRR TRD COOLING P.Glässel, A.Marín, V.Petracek, J.Stachel, M.R.Stockmeier, J.P.Wessels ALICE PRR TRD COOLING.
BROAD Absorption Chiller Working Principle and Central A/C System
Product Introduction.
IBL temperature analyses Bart Verlaat 22 April
Objective Learn about Cooling and Cooling systems Define heat pump Learn about energy storage systems.
Heating and Air-Conditioning
Equation solvers Matlab Free versions / open source codes: –Scilab MathCad: Mathematica:
Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.
1 CO 2 cooling of an endplate with Timepix readout Bart Verlaat, Nikhef LCTPC collaboration meeting DESY, 22 September
Status overview of the cooling 31 August 2015 Bart Verlaat, Raphael Dumps 1.
Chiller basics With Phil Rodin. Things to check when chiller is not running or is in alarm.
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
Tracker Thermal Control System 1 AMS Tracker Thermal Control System (TTCS) Phase II Safety Presentation SRII meeting, 21 May 2007, Houston Johannes van.
David Garvin Product Manager EarthDirEX Geothermal Copyright © 2015 Nortek Inc. All rights reserved.
VTCS overview 13 April 2006 NIKHEFBart Verlaat 1 NIKHEF involvement in VELO ~1 m module support CO 2 cooling detector "hood" kapton cables Vacuum vessel.
Nuclear Thermal Hydraulic System Experiment
LHCb VELO Meeting LHCb VELO Cooling System Bart Verlaat (NIKHEF) 25 February 2003.
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
1 GL th IIF/IIR Gustav Lorentzen Conference on Natural Working Fluids Bart Verlaat National Institute for Subatomic Physics (NIKHEF) Amsterdam, The.
IBL cooling thermal chock incident 15 October The IBL cooling team.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
LHCb-VELO Microchannel fracture safety system and evaporator concept 26 June 2015 Bart Verlaat 1.
LHC CMS Detector Upgrade Project FPIX Cooling Update Stefan Grünendahl, Fermilab For the FPIX Mechanical Group, 29 January 2015 Stefan Grünendahl,
AIDA Traci commissioning LHCb – CO 2 cooling meeting 18 March 2015 Kamil Wojdyla, Lukasz Banasik, Nicola Spadavecchia, Tomasz Kucharski, Piotr Dziurdzia,
IBL cooling operation at bake-out IBL CO2 meeting 10 April 2014 Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Olivier Crespo Lopez 1.
1 Engineering Forum: experiences from cooling systems for LHC detectors Bart Verlaat National Institute for Subatomic Physics (NIKHEF) Amsterdam, The Netherlands.
Limits of the current VTCS Ann Van Lysebetten Bart Verlaat Martin van Beuzekom VELO upgrade meeting 14/11/2008 pix module construction kick-off 09/11/2009.
IBL cooling branch layout and commisioning 6 febryuary 2014 Jan Godlewski, Bart Verlaat, Tomasz Blaszczyk, Eric Richards, Lukasz Zwalinski, Sven Vogt,
TRACI Status Meeting Overview of the TRACI 100-W CO 2 cooling machine Bart Verlaat 22 September
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
Page 1 Sapphire by pass line  Design Concept of Cooling Water System : Funnel 10 line Tank 2 10 tones Chiller -20cm tilt - 5cm distance between growers.
Lecture Objectives: Discuss the exam problems Answer question about HW 3 and Final Project Assignments Building-System-Plant connection –HVAC Systems.
Lecture Objectives: Introduce HW3 Learn about sorption chillers.
CO 2 Controlling a 2-phase CO2 loop using a 2-phase accumulator
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
Overview of recent CO 2 cooling developments As an example for LHCb-Velo and UT cooling? Kick-off meeting 28 may 14 Bart Verlaat 1.
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
Status of the Marco chiller and Marco capacity analyses Bart Verlaat, Lukas Zwalinski, Maciej Osterga, Jan Godlewski MPI Munich,1 March.
21 June Experiences with CO 2 cooling hardware and applied designs. Experiences from past CO 2 systems and philosophies for the.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
Lecture Objectives: Learn about thermal storage systems
Experience in Design and Implementation of CO2 Cooling Control Systems
Mechanical and cryogenic configurations
Fixed Orifice Tube Cycling Clutch System (FOTCC)

Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
IT-4189 Supply and installation of a cryogenic distribution system
VELO Thermal Control System
Christian Veelken last updated 11/09/06
Aachen Status Report: CO2 Cooling for the CMS Tracker at SLHC
VELO Thermal Control System
Pixel CO2 Cooling Status
Detector Technology Group
Recirculating CO2 System
VELO Thermal Control System
Members of project: Christian Brosch Andreas Maier Tamara Bubeck
CO2 Cooling IPNL Nick Lumb, 28/01/09.
CO 2 CO2 cooling experiences in the LHCb Velo Thermal Control System
CO 2 CO2 Cooling for HEP experiments Bart Verlaat TWEPP-2008
SNS PPU Cryomodule Instrumentation
SNS PPU Cryomodule Instrumentation
CO 2 CO2 COOLING FOR THE LHCB-VELO EXPERIMENT AT CERN Bart Verlaat
Presentation transcript:

Tertiary Vacuum Control 8 x 50 pins Electrical Vacuum feed through connectors VTCS sensor and actuator overview per VELO half Tx_FL001 Tertiary vacuum (036) (048) (047) Tx_BD003 4x Mounting Board (Capacity = 20x PT100 & 2x Heater (2A) per board (034) Tx_PT002 (033) Tx_PT004 Tertiary Vacuum Control (035) Local Control Box Tx_PT003 Heater group Tx_HT001 Heater group Tx_HT003 Tx_VL02 Tx_VL009 _ + (046) _ + (037) (039) Tx_PT001 CO2 in and outlet Tertiary vacuum connection to secondary vacuum (041) (42) _ + _ + (038) (040) Electrical Connector Type: 6 pin LEMO (FGG.OB.306.CLAD52) Heater group Tx_HT002 Heater group Tx_HT004 (004) (001) (018) (015) (032) (029) Electrical Bulkhead Connector Type: 6 pin LEMO (EEG.OB.306.CLL) (02) (016) (030) (01) = Tx_TT01 (02) = Tx_TT02 …… (48) = Tx_TT48 Temperature sensor labeling: (007) (008) (009) (010) (011) (012) (013) (014) (017) (019) (020) (021) (022) (023) (024) (025) (026) (027) (028) (031) (003) (005) (006) TL_HX001 TL_HX002 TL_HX003 TL_HX004 TL_HX005 TL_HX006 TL_HX007 TL_HX008 TL_HX009 TL_HX010 TL_HX011 TL_HX012 TL_HX013 TL_HX014 TL_HX015 TL_HX016 TL_HX017 TL_HX018 TL_HX19 TL_HX021 TL_HX23 TL_HX024 TL_HX025 TL_HX026 TL_HX027 TL_HX20 TL_HX22 (043) (044) bverlaat@nikhef.nl Tx = TL for left detector half and TR for right detector half

VELO Thermal Control System (VTCS) Tertiary System Layout at VELO VTCS Left Local Control Box Test_Connection Tertiary vacuum Secondary vacuum TL_VL006 TL_VL003 Vapor mixture return S.15 Insulated concentric tube TL_BD001 TL_PT001 TL_VL002 TL_PT002 TL_FL002 Liquid in S.06 (046) S.08 (047) S.09.28 Left S.05 S.07 TL_BD002 TL_VL001 TL_FL001 TL_VL004 S.10.01 S.10.27 TL_HX105 TL_HX028 TL_VL007 S.13 (048) S.12.28 S.14 TL_VL008 TL_BD003 TL_PT003 (001) = Tx_TT001 (002) = Tx_TT002 …… (048) = Tx_TT048 (xxx) = Internal rod sensor Temperature sensor labeling: S.11.01 S.11.27 TL_VL009 TL_PT004 Primary vacuum Shielding wall Secondary Vacuum TL_BD004 TLR_VL001 Left Tertiary vacuum control TL_HX001 TL_HX027 TLR_VL002 Right Tertiary vacuum control S.01 = Tx_S.01 S.16.01 = Tx_S.16.01 SB_S.0 labeling: TR_HX001 TR_HX027 TR_VL009 TR_PT004 Secondary Vacuum 50 meter TR_BD004 S.11.01 S.11.27 TR_BD003 TR_PT003 Vapor mixture return TR_VL007 S.14 S.13 (048) S.15 TR_HX028 TR_VL008 TR_BD001 TR_PT001 TR_PT002 TR_BD002 S.12.28 S.10.01 Right S.10.27 Liquid in S.06 (046) (047) S.09.28 S.05 TR_VL001 S.07 TR_FL001 S.08 TR_VL004 TR_VL002 TR_FL002 TR_HX105 Insulated concentric tube VTCS Right Local Control Box TR_VL006 TR_VL003 VELO Detector Test_Connection bverlaat@nikhef.nl Tx = TL for left detector half, TR for right detector half, TLR for combined hardware

Tertiary VTCS schematics at RB84 plant (101) = Tx_TT101 (102) = Tx_TT102 …… (125) = Tx_TT125 (xxx) = Internal rod sensor Temperature sensor labeling: Tertiary VTCS schematics at RB84 plant S.01 = Tx_S.01 S.16.01 = Tx_S.16.01 Section labeling: Vapor mixture from concentric tube Liquid to concentric tube Liquid to concentric tube Vapor mixture from concentric tube TL_LT101 TL_FL101 S.05 S.05 TR_FL101 TR_LT101 TL_BD103 TL_PT102 TR_PT102 TR_BD103 (101) S.15 TL_VL113 TR_VL113 (101) S.15 TL_VL101 (120) (120) TR_VL101 (109) (109) S.21 TL_BD101 S.16 TR_BD101 S.21 TL_BD107 TLR_VL111 S.16 TR_BD107 SA_HX107 / TL_HX103 S.04 S.04 SA_HX108 / TR_HX103 TL_VL112 TR_VL112 (108) TLR_VL110 (108) SB_HX107 / TL_HX104 TL_VL102 TL_VL111 TL_HT103 TL_HT103 TR_VL111 TR_VL102 SB_HX108 / TR_HX104 TL_AC101 (123) (123) TR_AC101 (125) S.17 S.17 TL_PT104 (125) TL_HT105 S.03 TLR_VL109 S.03 TR_PT104 TR_HT105 TL_PT101 TR_PT101 TL_BD102 TL_BD106 TR_BD106 TR_BD102 (107) TL_VL109 TR_VL109 S.12.29 TL_HT104 S.09.29 S.09.29 TR_HT104 (118) (116) S.02 (116) S.12.29 (107) (103) (124) (117) S.02 (117) (124) (118) (104) TL_VL110 TL_FL102 TLR_VL115 TR_FL102 TR_VL110 (103) (104) TLR_S.01 TL_VL108 TR_VL108 Tambient SB_HX103 / TL_HX102 TLR_VL107 TR_VL115 TL_VL115 (115) (102) (119) TL_S.01 (102) (119) S.20 TL_HT101 (111) TR_S.01 TR_HT101 TL_VL107 TR_VL107 (121) (115) S.20 TLR_HT102 (115) (121) SA_HX105 / TR_HX101 SA_HX103 / TL_HX101 (122) (114) (114) S.23 TL_HT102 (114) (122) TR_HT102 SB_HX105 / TR_HX102 S.18.02 (113) (122) (113) (113) S.23 (105) TL_PT103 TR_PT103 (105) (106) S.18.01 (106) TLR_PT103 S.18.01 S.18.02 S.22 TL_PM101 TL_VL103 (112) TLR_PM101 (112) TR_HX105 (112) TR_PM101 S.22 TR_VL103 TL_BD104 TL_VL114 TL_VL106 TLR_S.20 TR_VL106 TR_VL114 TR_BD104 (110) S.19 TLR_VL114 (110) TL_VL105 S.19 TL_VL104 TR_VL104 TLR_VL105 TLR_VL101 Tertiary VTCS Left Detector (TL) Tertiary VTCS Right Detector (TR) bverlaat@nikhef.nl Tx = TL for left detector half, TR for right detector half, TLR for combined hardware

Secondary VTCS main chiller (A) (101) = SA_TT101 (102) = SA_TT102 …… (122) = SA_TT122 (xxx) = Internal rod sensor Temperature sensor labeling: Secondary VTCS main chiller (A) SA_PT102 SA_FL101 SA_SG102 S.01 = SA_S.01 S.10.01 = SA_S.10.01 Section labeling: 3/8” SA_S.06 3/8” 1/2” SA_PT103 / SA_TT109 SA_S.02 12ºC SA_S.12.01 1/2” 3/8” SA_HX101 (PA_TT102) (120) SA_S.12.05 SA_SG103 (105) 6ºC SA_S.03 SA_SG105 SA_VL103/ 129 SA_HX102 SA_S.07.05 SA_VL104 3/8” (PA_TT101) (102) (114) SA_VL107 SA_HX106 (103) S.09.01 SA_VL127 3/8” S.11.01 SA_S.04 SA_VL102 (119) (108) 5/8” ½” SA_VL108 SA_HX103 / TL_HX101 3/8” 3/8” SA_S.05 SA_VL117/130 SA_VL101 SA_S.11.05 SA_VL122/131 (106) (107) (104) SA_PT105/ SA_TT116 SA_PT104 / SA_TT113 S.07.01 SA_VL106 S.08.01 SA_PT106/ SA_TT118 ½” SA_HX108/ TR_HX103 SA_VL126 ½” 1/2” 7/8” SA_AC102 SA_S.12.02 1/2” SA_PT101 SA_HX107/ TL_HX103 SA_S.10.03 SA_S.10.04 SA_SG104 1/2” SA_VL116 SA_VL121 SA_HX104 SA_S.01 (101) SA_VL115 SA_VL120 3/8” SA_VL111 SA-S.13 3/8” SA_S.09.03 SA_S.09.04 S.09.02 S.11.02 SA_S.15 (112) ½” SA_VL124/132 SA_PM101 (115) SA_S.08.03 SA_S.08.04 (117) SA_VL112 SA_HX105 / TR_HX101 SA_PT107 3/8” 3/8” SA_AC101 (122) SA_VL114 SA_VL119 (110) S.07.02 (111) SA_VL110 S.08.02 SA_VL128 7/8” 3/8” 3/8” SA_VL125/133 (121) SA_VL123 SA_S.14 SA_PT108 bverlaat@nikhef.nl Sx = SA for Water cooled chiller, SB for back-up air-cooled chiller

Secondary VTCS back-up chiller (B) (101) = Sx_TT101 (102) = Sx_TT102 …… (122) = Sx_TT122 (xxx) = Internal rod sensor Temperature sensor labeling: Secondary VTCS back-up chiller (B) SB_SG102 SB_FL101 S.01 = SB_S.01 S.10.01 = SB_S.10.01 Section labeling: 3/8” SB_S.06 SB_PM102 SB_PT102 5/8” SB_SG105 SB_HX101 SB_HX106 ½” SB_S.07 (114) (TT_PB101) SB_PT109 (119) (102 5/8” SB_S.12 5/8” 3/8” 3/8” ½” (105) ½” SB_S.11.03 SB_S.04 SB_PT103 SB_TT109 SB_PT104 SB_TT113 SB_S.11.01 SB_S.11.02 SB_VL104 SB_S.11.04 SB_VL117/130 SB_VL122/131 ½” ½” SA_VL127 ½” SB_PT105 SB_TT116 SB_PT106 SB_TT118 ½” SB_HX108/ TR_HX104 SB_VL108 SB_VL112 SB_S.01 SB_S.10.03 SB_S.10.04 5/8” SB_HX107/ TL_HX104 SB_S.05 SB_VL107 SB_S.09.01 SB_VL111 SB_S.09.02 (104) SB_VL116 SB_VL121 SB_AC102 (101) SB_VL115 SB_VL120 SB_HX103/ TL_HX102 SB_HX105/ TR_HX102 SB_S.09.03 SB_S.09.04 SB_S.15 (107) (111) SB_PM101 SB_VL124/132 (115) 3/8” 3/8” (117) 3/8” SB_S.08.01 SB_S.08.02 (121) 3/8” SB_S.08.03 SB_S.08.04 SB_S.13 SB_VL110 SB_VL125/133 SB_VL106 (122) SB_VL114 SB_VL119 3/8” 3/8” 3/8” 3/8” bverlaat@nikhef.nl SB_PT108 Sx = SA for Water cooled chiller, SB for back-up air-cooled chiller

Acronyms bverlaat@nikhef.nl Px = Primary Cooling System (6-12°C Water) PA= Primary A (6-12°C Water) PB=Primary B (Ambient air) Sx = Secondary Cooling system (R404a chiller) SA = Secondary A SB = Secondary B Tx = Tertiary Cooling System (CO2 system) TL = Tertiary Left TR = Tertiary Right AC = Accumulator PT = Pressure Transmitter BD = Burst Disc HX = Heat Exchanger HT = Heater LT = Liquid Level Transmitter TT = Temperature Transmitter FL = Filter PM = Pump/Compressor VL = Valve SG = Sight glass bverlaat@nikhef.nl