Team 5 Project Plan Review

Slides:



Advertisements
Similar presentations
Total Army Instructor LESSON 5 Conduct an After-Action Review.
Advertisements

SAE Aero Design Guidelines Rev A, 2013 Aero Design Oral Presentation Guidelines How to Deliver a Presentation The Judges will Notice.
Patrick Dempsey Bridget Fitzpatrick Heather Garber Keith Hout Jong Soo Mok PROJECT PLAN REVIEW September 26, 2000.
DR2 Presented by: Mark Blanton Loren Garrison Chris Peters Jeff Rodrian September 26, 2000 Chris Curtis.
Team 5 Dynamics & Control PDR 2 Presented By: Trent Lobdell Eamonn Needler Charles Reyzer.
Project Plan Review AAE451 – Team 3 October 2, 2003 Brian Chesko Brian Hronchek Paul Johnson (MIA) Ted Light Doug Mousseau Brent Robbins Emil Tchilian.
DR2 Stability and Control Preliminary Design Review and Performance PDR October 24, 2000 Presented By: Christopher Peters …and that’s cool Team DR2 Chris.
Project Plan Review Brian Barnett Rob Benner Alex Fleck Ryan Srogi John Keune.
Team 5 Aerodynamics QDR Presented By: Christian Naylor Charles Reyzer.
Team 5 Prototype Fabrication, Economic and Test Plan QDR Presented By: Maria Mullins Charles Stangle.
Team 5 Aerodynamics PDR Presented By: Christian Naylor Eamonn Needler Charles Reyzer.
March 22, Prototype Fabrication Economic & Test Plan QDR Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew.
Team 5 Structures PDR Presented By: Ross May James Roesch Charles Stangle.
AAE 450 Spring 2008 Stephanie Morris 3/27/08 Propulsion Final Slides.
Space Camp Huntsville, Alabama Located on the grounds of U.S. Space & Rocket Center.
Team 5 Critical Design Review Trent Lobdell Ross May Maria Mullins Christian Naylor Eamonn Needler Charles Reyzer James Roesch Charles Stangle Nick White.
The Lumberjacks Team /16/12 Brian Martinez.
Final Demonstration Team 2A The Charles Machine Works Downhole Generator Project.
Project Plan Review Boiler Xpress Oneeb Bhutta Ryan Beech Matt Basiletti Mike VanMeter.
Team 5 Vehicle Propulsion QDR 2 Presented By: Maria Mullins James Roesch.
Team 5 Aerodynamics QDR 2 Presented By: Christian Naylor Charles Reyzer.
Team 5 Design Concept Selection Trent Lobdell Ross May Maria Mullins Christian Naylor Eamonn Needler Charles Reyzer James Roesch Charles Stangle Nick White.
The U.S.S.E Team #4 Antonio Alvarez Janice Cruz Jose L. Gamboa Miguel Rivera Status Report #1 January 26 th, 2009 Description: A follower robot that will.
DR1 PF, E, & FTP PDR Prototype Fabrication, Economic and Flight Test Plan Preliminary Design Review October 26, 2000 Presented By: Mark Blanton & Chris.
1 Project Plan Review Ashley Brawner Neelam Datta Xing Huang Jesse Jones AAE451: Team 2 Matt Negilski Mike Palumbo Chris Selby Tara Trafton.
Strategic Planning Deanna Herwald Vice President-Quality Management Systems.
Dane BatemaBenoit Blier Drew Capps Patricia Roman Kyle Ryan Audrey Serra John TapeeCarlos Vergara Team 1: Prototype Fabrication, Economic, & Test Plan.
AAE450 Spring 2009 Landing Site Topography Time in Earth and Moon Shadow During Transfer [Kara Akgulian] [Mission Ops] February 11,
3.1 Project Management – time and resources, staying on track
Managing Projects to Achieve Desired Results
AAVG General Meeting September 9, 2015.
Senior Leadership Rounding Flow
Oct 22 Group Leaders Planning meeting
Project XYC: Project Plan
Team 5 Final Design Review
Project Plan Review Team “Canard” September 14th, 2006 Team 1:
MSBA Owner Project Manager Review Panel
Team 5 Final Design Review
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
February 12 – 19, 2018.
COMMUNICATION.
مراجعة عامة.
Broward County Consolidated Communication Committee Update
DBBC 2020.
Center on Professionalism
فرایند تسهیلگری در مددکاری جامعه ای
Team 5 Vehicle Propulsion PDR 1
Team 5 Vehicle Propulsion PDR 1
A Vestry/Warden Day Presentation February 24, 2018
أنماط الإدارة المدرسية وتفويض السلطة الدكتور أشرف الصايغ
Connecting Rural America through Broadband Technology
Prototype Fabrication, Economic, & Test Plan QDR
Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis
فلوشیپ اخلاق زیست پزشکی استادیار دانشگاه علوم پزشکی ایران
Jeff Stuart 1/31/2008 Dynamics and Control Simplified Rigid Body Equations of Motion AAE 450 Spring 2008.
Alfred Lynam February 21, 2008 Dynamics and Control D&C simulation code compatibility test with trajectory code. AAE 450 Spring 2008 Dynamics and Control.
Prototype Fabrication, Economic, & Test Plan QDR
EDSI Way Training Schedule - Train to Gain WASHINGTON HEIGHTS TEAM
Fiscal Year Budget Plan
Setting a Goal Outdoor Living 9.
Eagle Space Flight Team A Student Team’s Plan to Fly a Rocket to Space

Activity Manager Activity Leaders Team Leaders Peer Leaders Followers.
Progress report discussion
Chapter 3: Project Integration Management
Conduct an After-Action Review
Charge for CSPEC Detector Construction Workshop
Dornsife Performance Evaluation Calendar
Team 5 Vehicle Sizing PDR
Aether Aerospace AAE 451 September 6, 2006
Presentation transcript:

Team 5 Project Plan Review Presented By: Nick White Charles Reyzer

Outline Team Responsibilities Scheduling Group Dynamics February 1, 2005 AAE 451 – Team 5

Responsibilities Leadership Teams Nick White (CEO) Charles Reyzer (CTO) Teams Aerodynamics Christian Naylor, Charles Reyzer Propulsion James Roesch, Maria Mullins Structures Ross May, Clay Stangle Dynamics & Control Trent Lobdell, Eamonn Needler February 1, 2005 AAE 451 – Team 5

Responsibilities Teams CAD/Industrial Design Budget Center of Gravity Clay Stangle, Ross May, Christian Naylor Budget Maria Mullins Center of Gravity Eamonn Needler Class Note-Taker Clay Stangle Webpage Charles Reyzer February 1, 2005 AAE 451 – Team 5

Scheduling Presentations February 1, 2005 AAE 451 – Team 5 Name Time # Nick 30 4 Charles 5 Christian 25 Ross Clay 3 Trent James Maria Eamonn February 1, 2005 AAE 451 – Team 5

Scheduling Estimated Budget Milestones 9015 Man-Hours Project Planning (2/1) Airfoil Selection (2/8) Motor Selection (2/22) Design “Frozen” (2/24) Parts Ordered (3/10) Critical Design Review (CDR) (3/24) Begin Construction (3/24) Flight (4/19) Estimated Budget 9015 Man-Hours $450,750 Development Cost February 1, 2005 AAE 451 – Team 5

Scheduling Group Meetings Team Meetings Weekly Meetings (Sundays 12:30) After Class (Tuesday/Thursday) Team Meetings Arranged by teams when needed February 1, 2005 AAE 451 – Team 5

Group Dynamics Monthly Lunches Code of Conduct Constructive Criticism Communication with Leaders February 1, 2005 AAE 451 – Team 5