TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS

Slides:



Advertisements
Similar presentations
Because the client has a need, We have a job to do;, Because the client has a choice, We must be the choice; Because the client.
Advertisements

AG BUILDING CONSTRUCTION. Unskilled / Semi-skilled Labor Skilled Trade / Craftsman Technicians Design & Management.
MOSAICS. We are going to be designing and making a Roman Mosaic this term. You will learn how Romans made mosaics Plan and Design your own Mosaic Make.
Mosaics. History of Mosaics Mosaic can be traced back through several cultures. The first culture attributed with mosaics was the Aboriginal Native Americans.
S.Thomas College Gurutalawa OLD BOYS ASSOCIATION 2008/09 JUNIOR DORMITORY TOILET PROJECT.
CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
Building for Learning Project Photo Progress Report 4 November 2009 – December 2009 Project commencement 21 st September 2009.
Unit 9 Finishes Teaching Objectives 1. Have basic idea of finishes 2. Understanding something about wall finishes, floor finishes and ceiling finishes.
Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
Module 3: Restroom Cleaning Problems and Solutions SPARKLING RESTROOM TRAINING PROGRAM.
Resale Property 3 Bedroom Detached Villa in Paphos.
Futureview Solar Solutions Elysburg, Pa. Call
When the floors are in position they are left a few weeks to dry. Meanwhile various tradesmen can start to put the finishing touches to the building, both.
PREFORMED COMPRESSIBLE WATERSTOPS
Problem-solving with MATLAB Week 4: Computing volumes: cubic feet, gallons, measuring water NAME _________________________.
Techno Homes Chemicals Solutions for Tomorrow's Technology.
Concrete Over site 300mu DPM / 1200 gauge (Tape all joints with Polythene Tape) Floor finish 50mm Gvylon screed 250mu DPM -clear plastic (Tape joints with.
Introduction to a pit installation
Insulation Ashfield Direct Learning Tim Gregorczyk Your Photo Will go Here! Ks4 Energy.
Problem: surface ponding. Solution: surface or subsurface drainage.
1 STR – Multipurpose machines STR 702 STR 702S STR 580 STR 701 STR 703.
BOLD STEP® Safety Treads. BOLD STEP Safety Treads Permanent Solution Cover Damaged Concrete, (at fraction of the cost of cement repairs) Increases Step.
The Mosaic Idea For Physics
Pool Project SWIMMING POOL 3500sq ft. DECK AREA 7000sq ft. SHELTER400sq ft. EQUIPMENT ROOM/STORAGE SHELTER 1400sq ft.
INTERIOR PAINT & DRYWALL REPAIR Identify the tools needed to paint interior ceilings & walls Learn to repair damaged drywall Learn how to prepare rooms.
Patterns using ceramic tile. ceramic tile walls, and floors, consist of several interdependent components: substrate: gypsum board, plywood, cementitious.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
Christine Davis Tarryn Hardgrove Becky Kalla. Current Convocation Athletic Training Room.
The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation.
1 TT10 Remedial works What is happening. 2 Compression failure in crown (some cases) Tension/Shear failure in shoulders (typical) Compression Tension.
POOL CONSTRUCTION THE 5 MAJOR STEPS 1. Plan2. Dig3. Build4. Finish 5. Swim!
Swimming in the backyard By: Michiel Keegstra Ian Koelman Thijs Hakkenberg Tom van Veenhuizen Elbert van Barreveld.
CST 15, 21, 23B. CA Standard 15.0 Students apply algebraic techniques to solve rate, work, and mixture problems.
Unfinished French Oak Planks Supplied, laid over screed sub floor on batons. Sanded to a fine finish and sealed with three coats of Sadolin spirit based.
TRUMAN MIDDLE SCHOOL Presented by Counsilman ▪ Hunsaker Facility Audit.
Volume and Surface Area of Prisms and Cylinders Per. Names: Date: 2/26/16.
Go Back > Question 1 8x 3 ? A cube has side length 2x. What is its volume? 2a.
How Our Earth Sheltered Homes are Constructed Earthlog ® Equity Group, Inc. The American Dream … The Future is Now
When all the walls have been coated with Carlite finish and dried the plumbers can return to fit all the necessary pipe work and the radiators. Then a.
Deep Residential Basement, Chelsea. Toureen Plant Toureen Plant Toureen Contractors City Basements Groundworks RC Frames Groundworks RC Frames Petrol.
1 Day Product Training Course. How to choose a Tile Adhesive or Grout Type of tile Substrate Service Condition.
2010 Product Awareness Floor Tiling. Weber.set rapid plus Uses: For fixing ceramic, porcelain and natural stone tiles Walls and floors Interior and exterior.
Tile & Grout Cleaning (770)
Submersible Pumps and Motors Suppliers & Manufacturers in UAE.
Substrate Identification Wall Tiling. Principal Wall Substrates Cement/sand rendering Gypsum plaster Plasterboard Existing tiling Timber based boards.
Install an Epoxy Coating on Garage Floor?. Part - I Preparing the Floor.
Weber Tile Fixing.
SWIMMING POOLS CONSTRUCTED AND REPAIRED
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
Borough of Conshohocken Authority 2016 Odor Control Project
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
APPLICATIONS OF TECHNOLOGY
MDX-R3 INSTALLATION PROCESS ADJUSTABLE CONCRETE POOLS
Photo Album by V. Venkatesan.
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
MDX-R3 INSTALLATION PROCESS NON-ADJUSTABLE CONCRETE POOLS
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
ART 3&4: Final!!! Part 1: History+Clay
Bathroom Shower Base Re-enamelling
BACK SOLUTION:
Introduction to Weber Tile Fixing Products.
Best Paint Options for a Concrete Around Pool By: Authentic Plastic and Tile
Apply Plaster Materials to Internal Surfaces
Steps of Swimming Pool Construction in Adelaide Statewide Pools -
Glen Eira Leisure Removal of Tiles and Painting to Pools
All about Waterproofing
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
Minuteman Vocational Technical Regional High School Progress
Value of contract: Length of contract: Contract start date:
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
Presentation transcript:

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS POOL DEPTH REDUCTION TO LEISURE CENTRE TRAINING POOL

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS DAY ONE OF THE POOL DEEP END REDUCTION - THE DRAINING OF THE POOL

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS REMOVAL OF THE POOL LINER TO ENABLE US TO DE- GLAZE EXISTING TILES UNDERNEATH

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS WORK IN PROGRESS

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS THE PUMPING OF THE LIGHTWEIGHT CONCRETE

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS FINISHED LEVEL OF NEW LIGHWEIGHT CONCRETE, SHOWING NEW OUTLET SUMP PIPEWORK

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS GETTING READY FOR SCREEDING AND TILING

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS TILING TO WALLS POOL FLOOR EPOXY COATED

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS FINAL COATING OF EPOXY TO THE POOL FLOOR. WALLS MOSAIC TILED AND EPOXY GROUTED

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS WORKS COMPLETE READY TO FILL WITH WATER