How do airports plan to solve their future ATM challenges?

Slides:



Advertisements
Similar presentations
Transport TEN-T 2012 Calls for Proposals Info Day SESSION 2 MULTIMODAL AND CROSS-CUTTING PRIORITIES AIR TRAFFIC MANAGEMENT Unit Single European Sky - DG.
Advertisements

Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.
AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services.
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Future Airspace Strategy (FAS) Heathrow Airport Consultative Committee 31 st March 2010 Phil Roberts Assistant Director of Airspace Policy 1 1.
Episode 3 1 Episode 3 EX-COM D Final Report and Recommendations Operational and Processes Feasibility Pablo Sánchez-Escalonilla CNS/ATM Simulation.
Enav.it Session 3 Steps towards the SESAR deployment and the ATM system modernisation.
The European Shared Environmental Information System Meropi Paneli
Smart Regulation Responding to the needs of SMEs Commission Communication COM(2013) final of
SESAR Single European Sky Air traffic management Research
ATM Conference, Oslo May 19 th, 2015 ATM Master Plan 2015 Consequences for cost, safety, performance and environment.
David Bowen Head of ATM Operations and Systems
Cost effective ATM – from the perspective of airspace users Torbjørn Lothe, ATM Conference 19 May 2015.
Joanna Fiedler Enlargement and Neighbouring Countries Unit DG Environment European Commission REReP → RENA Vision of the European Commission PEIP Regional.
Nigel Makins EUROCONTROL
WP8 – Innovation Support Kelly Vavasi General Secretariat for Research and Technology (GSRT) 1 st Innovation Dialogue Forum Becici, 8-9 November 2010.
Status of QUACO project
AVINOR FLYSIKRING AS AVINOR AIR NAVIGATION SERVICES INVESTMENTS AND FINANCING FOR AVINOR DEPLOYMENT PER INGAR SKAAR.
Achievements and next steps in the Central-South Region Central-South Region 3rd SG meeting Milan, November 16 th 2010.
2015 CEF Transport Calls Action Proposals Preparation Mid-Term Review Workshop ©
HST Region High Speed Trains and Regional Development ”HST Region” Updated PP-Presentation October/December2008.
HST Region High Speed Trains and Regional Development ”HST Region” Updated PP-Presentation October 08/January 09.
Stela Barova, senior expert, “Marine environmental protection and Monitoring” Department, “Plans and Permits” Directorate State of play of MSFD implementation.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
Module 02 Essential Requirements for ATCOs. Training Objectives  Appreciate the content of the essential requirements for ATCOs as described within EASA.
Second ATM R&D projects Co-ordination and networking meeting 14 Nov 2007 Advanced Remote Tower - ART A concept study of Enhanced functionalities during.
European Transparency Requirements - update Transmission Workstream 1 st May 2008.
EUROPEAN REGIONAL DEVELOPMENT FUND CLUE final conference, 24 September 2014, Turin EU Interregional Cooperation State of play and perspectives Johanna.
What are the consequences of SES for the Air Force
Marek Stavinoha Legal officer DG MOVE A4 European Commission
Department of Livestock Development
International Federation of Air Traffic Safety Electronics Associations PCP and CP2 by Robert Schneebuaer IFATSEA Ambassador.
ESA Iris Programme: status
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
Effective air navigation services in Norway – reflections from airspace users Torbjørn Lothe, Director General, Federation of Norwegian Aviation Industries.
Presented by United Arab Emirates
Introduction to JASPERS and reflections on Sustainable Roads Kristian DUUS, JASPERS Roads Division, Vienna Regional Office.
The SESAR Deployment Manager
IFATSEA General Assembly Keynote address Berlin, Germany November 2015
GRI-S : Infrastructures The Union list of projects of common interest
OptiFrame WP1: Project Management
Oslo Airport Gardermoen
WG-I #16 Meeting SESAR Security Tasks
London 14 October 2015 Freek De Witte Head of Stakeholder Relations
PROGRESS & CHALLENGES ATCOS’ VIEWS
The Single European Sky Implementation Programme: SESAME
Supporting Data for a KfW Financed Investment Project on the Montenegrin Coast 18 May 2017, Wien ●
26th February 2015 Teleconference
International Federation of Air Traffic Safety Electronics Associations IFATSEA European Regional Meeting 2016 Update ICB by Robert Schneebauer 17.
Preparations for post-2020 Impact Assessment European Commission Directorate General for Regional and Urban Policy Unit DGA Policy.
Project Coordination Group (PCG) for the implementation of the MSFD
IS&T Project Reviews September 9, 2004.
Steps during and after a Pre-commercial Procurement
Steps during and after a Pre-commercial Procurement
Sharon Mahony Environment Unit
26th February 2015 Teleconference
The evaluation process
Introduction. Presentation of the mandate of the Task Force
Steps during and after a Pre-commercial Procurement
Fitness Check EU Water Policy
Steps during and after a Pre-commercial Procurement
Opening national ATM functions to competition
5.b3 Monitoring & Reporting 2019
DG Environment, Unit D.2 Marine Environment and Water Industry
European PPP Expertise Centre (EPEC)
DG Environment, Unit D.2 Marine Environment and Water Industry
ANSP Business Innovations in present environment Aviation Seminar in Tartu
Preparatory meeting for the establishment of the Project Coordination Group (PCG) for the implementation of the MSFD 13 November :00-13:30 European.
EASA ATM/ANS regulatory update
Presentation transcript:

How do airports plan to solve their future ATM challenges? Johan Steinkjer, Technical Director ATM, Avinor Airports

How do airports plan to solve their future ATM challenges? 3rd Runway at Oslo Airport, Gardermoen Pilot Common Projects and Second Common Projects (PCP/CP2) EU funding for PCP projects. Future ATM system for TWR (FAS TWR) ATC TWR competition at Avinor Airports.

3rd RWY 3rd RWY: Ministry of Transport and Communications has given the green light for the planning of eastern alternative. Approval for actually building 3rd RWY needs to be given by the MoT. 3rd RWY will not be built until the full capacity of the 2 existing RWYs has been fully utilized. Capacity report by GFL in final stages to assess theoretical capacity.

BSL G1-2a – Pilot Common Projects

Revision of IR 716/2014 - Pilot Common Projects EC has given a mandate to the SESAR Deployment Manager (SDM) to draft a report that should prepare and facilitate the review of the IR 716/2014. EC is looking for a minimal revision to optimize the current IR. No introduction of new or withdrawal of existing ATM functionalities is envisaged. The EC specifically mentions in the mandate: the fine-tuning of the description of the ATM functionalities potentially adapt the stakeholders potentially adapt the geographical scope the deployment target dates.

Timeline for revision of PCP

…and at the same time «Second Common Projects» EC has tasked SESAR Joint Undertaking (SJU) to propose candidates to a new Common Project (CP2). Candidates will be chosen from the SESAR 1 Solution catalogue. A total of 39 SESAR solution will be assessed before the summer and the CBA for each will be updated. Final delivery to the EC is 1st November 2017. For airports its important to focus on performance, not technology.

EU funding for Common Projects (PCP/CP2) Regulation (EU) No 409/2013 on the definition of common projects, the establishment of governance and the identification of incentives supporting the implementation of the European ATM Master Plan Common projects shall also: (a) demonstrate a positive business case for the European ATM Network, based on an independent cost-benefit analysis, and identify any potential local or regional negative impact for any specific category of operational stakeholders; (b) identify incentives for deployment, (…), in particular to mitigate negative impacts on a specific geographical area or category of operational stakeholders;

Funding - Norwegian Status CEF Call 2014: Avinor Flysikring AS (AFAS) received funding for phase I of Borealis Free Route Airspace Project. CEF Call 2015: Oslo Airport prepared application for pre-project “Future ATM System Tower”. Withdrew application after feedback from SESAR Deployment Manager. AFAS applied for funding of phase II of Borealis Free Route Airspace Project. All other participants got funding, not AFAS. AFAS in collaboration with OSL applied for funding of extended AMAN project (ref. PCP). No funding received. PENS project in collaboration with Eurocontrol and other European ANSP’s. All other participants got funding, not AFAS. CEF Call 2016: AFAS re-applied for all projects not receiving funding in 2015. Oslo Airport didn’t bother.

Revision of IR 716/2014 - Pilot Common Projects EC has given a mandate to the SESAR Deployment Manager (SDM) to draft a report that should prepare and facilitate the review of the IR 716/2014. EC is looking for a minimal revision to optimize the current IR. No introduction of new or withdrawal of existing ATM functionalities is envisaged. The EC specifically mentions in the mandate: the fine-tuning of the description of the ATM functionalities potentially adapt the stakeholders potentially adapt the geographical scope the deployment target dates.

Future ATM System in Norwegian TWR AFAS is replacing Natcon with Indra system through the «iTEC alliance» (UK, DE, ES, NO, NL, PL, LT). Timeframe 2021-2022 and this will affect all TWRs in Norway that has Natcon as their TWR system. OSL to implement all available technology to postphone building 3rd RWY as long as possible: Current ICW has limitations Reduce separation Reduce ATCO workload Increase capacity Fulfill the PCP for OSL Feasability study in progress.

Competition of TWR services at Avinor airports Meld. St. 30 (2016–2017) «Verksemda til Avinor AS». MoT has given Avinor «go-ahead» with competing TWR services at Avinor airports, pending Parliament descision in June. Start the work in 2017. CNS services is already open to competition. Where the business case is positive, Remote TWR might be an alternative to competition. Competition needs to be coordinated with the Norwegian Defence Forces. 13 airports identified as of special interest for the Norwegian Defence Force.

What has Avinor Airports done so far… Established «Avinor Airport ANS Department» Tested tender procedure at BGO and SVG for the 2017 contract. Analysed Avinor TWR to assess which TWR (s) should be competed first. Cost efficiency Norwegian Defence Force Attractiveness to market Remote TWR Wait untill autumn…