Change Management Production, Sales & Distribution, PRA & IS-Oil

Slides:



Advertisements
Similar presentations
Restaurant Management System
Advertisements

SE 464: Industrial Information systems Most Images and inform. used in these slides are SAP © Not to be used for other than educational purposes Systems.
© Tally Solutions Pvt. Ltd. All Rights Reserved Tally.ERP 9 for Readymade Paint Dealer.
Annual Supplier/Customer History Consolidated Delivery/Dispatch Reports Annual Delivery/Dispatch/Rejection History Batch Explosion Report (Back-tracking.
Petrol Pump Solution on Tally.ERP 9. Click to edit Master text styles Second level Third level Fourth level Fifth level Powered by Various Functionalities.
Right Solution, Right Time, Right Price Billing. Business Process Workshop The objectives of the Billing workshop is to: Provide an overview of the Billing.
Process Management and Control and Physical Inventory SAP Implementation
FIXED ASSETS ZETA ERP. FLOW PANEL.
INVENTORY & ORDER PROCESSING
Introduction to SAP R/3.
University of Southern California Enterprise Wide Information Systems The Procurement Process Instructor: Richard W. Vawter.
SAP R/3 Materials Management Module
Procurement Processes SAP Implementation
The Procurement Process
16 Cost sheet. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor.
Production Planning Processes Theories & Concepts
SAP Supplier Management EIN 5346, Logistics Engineering Spring 2010.
Configuring the MM Structures. Slide 2 Review of the Procurement Process Goods Receipt Pay Invoice Purchase Requisition Purchase Order Invoice Receipt.
Istanbul Kultur University Enterprise Wide Information Systems The Procurement Process.
Business Process Overview IE 450 Enterprise Perspective of Manufacturing System.
1 Logistik mit SAP Chair or Production & Operations Management University of Vienna All for One Vienna, Austria Franz Birsel The Logistic Chain.
Phase II: Procurement SAP University Alliances Version 2.2
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013.
PROJECT COSTING ZETA ERP. FLOW PANEL.
Clients (and the interface level) Application Server (and the application level) Database Server (and the Database level)
CSIA S – Analytica Success factors and basis for making informed business decisions Management reporting Financial statements.
Forecasting Statutory Allocation. What is Statutory Allocation Statutory Allocation (including Net Derivation) represents a significant.
POINT OF SALE ZETA ERP. ZETA POS.
Enterprise Assets Management EGN 5622 Enterprise Systems Integration Fall, 2015.
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Ganda ERP Project | 0 CFC ERP Cut-off Strategy 31 December 2014.
Production Planning Processes EGN 5620 Enterprise Systems Configuration Fall, 2015.
VIRTUAL Restaurant Software
SAP MATERIALS MANAGEMENT(MM) TRAINING IN SOUTHAFRICA,AUSTRALIA
 Andersen Consulting IM01 - Organizational Structure & Master Data in IM November, 2000.
 TATA CONSULTANCY SERVICES MATERIALS MANAGEMENT.
 Tata Consultancy Services Production Planning PROCESSING MATERIAL MASTER.
, , Devloped By Deep Solutions.
/ Tutor: Salina Loum AAT Level 2 Basic Costing This Unit will be divided into 5 lessons:
MATERIALS MANAGEMEN T. Contact Us : Online | classroom| Corporate Training |
 Tata Consultancy Services  SAP AG CO - Controlling.
Aarohan ( ERP project, Oil India Limited ) Change Management Finance and Controlling.
 TATA CONSULTANCY SERVICES MM - Inventory management.
Presented by PERUMALSAMY M ,RAJESH R ERP Sales & Distribution Module.
Customer Order and Account Management Business Processes Chapter 7.
Budget management March 20th 2017
Prof. Dr. Olga Popova, OVGU Prof. Dr. Jörg Jablinski, OWL
SAP Materials Management (MM)
Block 5 Section 2 Part I How is performance measured within organizations? Prepared by Hanady Ali Osman.
Testing of Configurable Controls in SAP
BUDGET Process Change Description Type of Change Process
Over-the-Counter Sales Scenario Overview
Chapter 18 Automatic Account Assignment
Actual Postings Financial accounting Materials mgmt Controlling
16 Cost sheet
Procure to Pay Process This unit focuses on the procure to pay process. The first part describes the organizational levels and master data which support.
EzyAccounting An Accounting Software An Accounting Software By: Delicate Software Solutions Dubai, Manage Your Business… Not Just Accounts.
Managing Materials Requirements Planning Course
Global Bike Inc.. Global Bike Group Background: ▫Consists of two companies located in the US and in Germany History: ▫John Davis won numerous mountain.
Order-to-Cash (Specified Products) Scenario Overview
Order-to-Cash (Specified Products) Scenario Overview
Over-the-Counter Sales Scenario Overview
BASIC SETTINGS CONTENTS OF THE COURSE: Definition of Company
Purchase request from customer
Production Planning and Detailed Scheduling (PP/DS) in SCM EGN 5623 Enterprise Systems Optimization Fall, 2012.
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5346 Logistics Engineering Fall, 2015.
Presentation transcript:

Change Management Production, Sales & Distribution, PRA & IS-Oil

PP/SD/PRA/IS-Oil – KEY PROCESS CHANGES A new concept of Sales order for all kinds of sale like Crude oil, Natural Gas , LPG and services etc. shall be done through the system ie by creation of sales order, delivery, and invoicing. Respective Dept. shall create SO through the system. Based on Sales Order & Delivery, Finance Dept. shall raise the Invoice. Product price will populate automatically to the Sales order. Parameters like material temperature, test density, BSW, etc would have to be maintained in the system for Quantity Conversions

PP/SD/PRA/IS-Oil – KEY PROCESS CHANGES The production process of crude oil, Gas , condensate, formation water will be captured in the system through Logistics process. Two material codes will be used for production of Condensate from Gas wells & LPG. Spiking of condensate at OCS or CTF and conversion from condensate to Crude Oil will be captured through the system. Two material codes will be used for production of crude oil, ie ZCRUDE & CRUDE OIL. Both are valuated. CRUDE OIL will be the dry quantity on which royalty will be paid. Water will be drained in 3 points ie at installations, at CTF and at customer points. No royalty payment on water produced. Pipeline Losses will be posted as Water Drain.

PP/SD/PRA/IS-Oil – KEY PROCESS CHANGES The quantity of natural gas flared will be captured in the system and will be valuated . Common logic will be used for production and disposal of natural gas in all installations. (For OCS-1 to OCS-8, flared volume was derived from production & disposal volume and for rest of the installations flared volumes are the actual measured volume). The annual target for LPG will be captured in the system on which MRP run for production and availability of raw material & finished product will be done once in a month. This will be used to create Process Orders to capture the Production activities. Master Recipes, MRP Controllers, Planned Orders and Process Orders are new concepts in OIL.

PP/SD/PRA/IS-Oil – KEY PROCESS CHANGES Quality Control and testing of semi finished & saleable finished products shall be done and recorded in the SAP system. In PRA module, volume allocation to be made on produced (dry) Crude, Natural gas, formation water, condensate, fresh water injected to the reservoir. Different Delivery networks are created for each and allocation will be made daily & once in a month. The daily production statement for each installation will be an output of daily allocation.

Thank you