Shifted Uniform Series

Slides:



Advertisements
Similar presentations
Chapter 3 Combining Factors and Spreadsheet Functions
Advertisements

© 2012 by McGraw-Hill, New York, N.Y All Rights Reserved 4-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin.
(c) 2002 Contemporary Engineering Economics 1 Chapter 4 Time Is Money Interest: The Cost of Money Economic Equivalence Development of Interest Formulas.
Borrowing, Lending, and Investing
© 2012 by McGraw-Hill, New York, N.Y All Rights Reserved 3-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin.
Shifted gradients begin at a time other than between periods 1& 2Must use multiple factors to find P in year 0 Arithmetic.
CTC 475 Review Uniform Series –Find F given A –Find P given A –Find A given F –Find A given P Rules: 1.P occurs one period before the first A 2.F occurs.
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
(c) 2002 Contemporary Engineering Economics
(c) 2002 Contemporary Engineering Economics
Interest Formulas – Equal Payment Series
LECTURE 6 NONUNIFORM SERIES Prof. Dr. M. F. El-Refaie.
EGR 403 Capital Allocation Theory Dr. Phillip R. Rosenkrantz
Chapter 2 Factors: How Time and Interest Affect Money
Single-Payment Factors (P/F, F/P)
The terms ‘nominal’ and ‘effective’ enter into consideration when the compounding period (i.e. interest period) is less than one year. A nominal interest.
AW involves converting all cash flows into an A value The AW for one life cycle is the same AW for 2,3,4, or or an infinite number of life cycles,as long.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 3-1 Developed.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Blank & Tarquin: 5th Edition. Ch.3 Authored by Dr. Don Smith,
Mutually Exclusive Independent Are compared only against do-nothing More than one can be selected Are compared against each other Only one can be selected.
Interest Formulas – Equal Payment Series
Exam 3 Practice Problems For Engineering Economy By Douglas Rittmann.
1 Cash Flow Patterns The “LEGO” blocks of Engineering Economics.
© 2012 by McGraw-Hill, New York, N.Y All Rights Reserved 5-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin.
Financial Mathematics 1. i = interest rate (per time period) n = # of time periods P = money at present F = money in future –After n time periods –Equivalent.
Interest Formulas for Single Cash Flows
A shifted uniform series starts at a time other than year 1 When using P/A or A/P, P is always one year ahead of first A When using F/A or A/F, F is in.
A shifted uniform series starts at a time other than year 1 When using P/A or A/P, P is always one year ahead of first A When using F/A or A/F, F is in.
MER Design of Thermal Fluid Systems Econ Lecture 2 Professor Bruno Winter Term 2002.
(c) 2002 Contemporary Engineering Economics 1. Engineers must work within the realm of economics and justification of engineering projectsEngineers must.
ENGINEERING ECONOMY DR. MAISARA MOHYELDIN GASIM Chapter 3 EQUIVALENCE.
1 Equivalence Between Two Cash Flows Step 1: Determine the base period, say, year 5. Step 2: Identify the interest rate to use. Step 3: Calculate equivalence.
Equivalence Factors and Formulas Moving Money Around.
Combining Factors. 1- Calculation for Uniform Serious that are shifted When a uniform series begins at a time other than at the end of period 1, it is.
Basic Of Engineering Economy
Chapter 2 Time Value of Money
Interest Formulas for Single Cash Flows
Complex Cash Flows Break complex flows into simpler patterns:
Chapter 2 Factors: How Time and Interest Affect Money
Nominal and Effective Interest Rates Lecture slides to accompany
Chapter 3 Combining Factors and Spreadsheet Functions
LECTURE 6 NONUNIFORM SERIES
CTC 475 Review Uniform Series Find F given A
Nominal and Effective Interest Rates Lecture slides to accompany
Chapter 2 Factors: How Time and Interest Affect Money
Alternative Classification
Chapter 3 Combining Factors and Spreadsheet Functions
Different Life Alternatives
Chapter 2 Factors: How Time and Interest Affect Money
Chapter 2 Factors: How Time and Interest Affect Money
Let’s work some problems…
Engineering Economy [3] Combining Factors Examples
Combining Factors – Shifted Uniform Series
Adopted and modified by Dr. W-.W. Li of UTEP, Fall, 2003
Note that P is Two Periods Ahead of the First G
Capitalized Cost Refers to the present worth of an infinite series A
Geometric Gradients Change by the Same Percentage Each Period
Combining Factors – Shifted Uniform Series
Engineering Economics - Introduction
Mc Factors: How Time and Interest Affect Money Graw Hill CHAPTER II
Varying Interest Rates
Practice sheet 4-1 Go over Homework.
Let’s work some problems…
OUTLINE Questions? News, Experiences? Chapter 3
Economic Life Economic life refers to the asset retention time(n) that yields its lowest equivalent AW Example: Determine the economic life of an asset.
Let’s work some problems…
Shifted Series & Random Single Amounts
Shifted Uniform Series
Combining Factors – Shifted Uniform Series
Chapter 3 Combining Factors and Spreadsheet Functions
Presentation transcript:

Shifted Uniform Series A shifted uniform series starts at a time other than year 1 When using P/A or A/P, P is always one year ahead of first A When using F/A or A/F, F is in same year as last A P=? A=10,000 0 1 2 3 4 5 6 i=10% Example: The present worth of the cash flow shown below at i=10% is: (a) $25,304 (b) $29,562 (c)$34,462 (d) $37,908 Solution: (1) Use P/A factor with n=5 to get P in year 1: P1= 10,000(P/A,10%,5) =10,000(3.7908) = $37,908 (2) Use P/F factor with n=1 to move P back to year 0: P0= P1(P/F,10%1) = 37,908(0.9091) = $34,462 Answer is (c)

Shifted Series & Random Single Amounts These cash flows require the use of multiple factors A=10,000 i=12% 0 1 2 3 4 5 6 7 6000 Example: The equivalent annual worth in yrs 1-7 for the cash flow shown below at i=12% per year is: (a) $8790 (b) $9530 (c) $10,330 (d) $11,780 Solution: The annual worth in yrs 1-7 can be found using either the A/P or A/F factors For A/P factor, find P in yr 0, then annualize with (A/P,12%,7) For A/F factor, find F in yr 7, then annualize with (A/F,12%7) Using A/F: A=[10,000(F/A,12%,6) + 6,000(F/P,12%,2)](A/F,12%,7) =[10,000(8.1152) + 6,000(1.2544)](0.09912) =$8,789.80 Answer is (a)

Arithmetic Shifted Gradients Shifted gradients begin at a time other than between periods 1& 2 Must use multiple factors to find P in year 0

Example : John Deere expects the cost of a (a)$101 (b)$295 (c)$370 (d)$397 Example : John Deere expects the cost of a certain tractor part to increase by $5 /yr beginning 4 years from now. If the cost in years 1-3 is $60, the present worth of the cost thru year 10 at an interest rate of 12%/yr is closest to:

Example : John Deere expects the cost of a certain tractor part to increase by $5 /yr beginning 4 years from now. If the cost in years 1-3 is $60, the present worth of the cost thru year 10 at an interest rate of 12%/yr is closest to: (a)$101 (b)$295 (c)$370 (d)$397 1 2 3 10 4 5 60 65 70 95 Cash Flow Diagram i=12% The cash flow diagram is as follows:

Example : John Deere expects the cost of a certain tractor part to increase by $5 /yr beginning 4 years from now. If the cost in years 1-3 is $60, the present worth of the cost thru year 10 at an interest rate of 12%/yr is closest to: (a)$101 (b)$295 (c)$370 (d)$397 1 2 3 10 4 5 P=? 60 65 70 95 8 i=12% The cash flow diagram is as follows: First find P2 for the gradient ($5) and its base amount ($60) in year 2: P2 = 60(P/A,12%,8) + 5(P/G,12%,8) = $370.41

Example : John Deere expects the cost of a certain tractor part to increase by $5 /yr beginning 4 years from now. If the cost in years 1-3 is $60, the present worth of the cost thru year 10 at an interest rate of 12%/yr is closest to: (a)$101 (b)$295 (c)$370 (d)$397 1 2 3 10 4 5 P=? 60 65 70 95 8 i=12% The cash flow diagram is as follows: First find P2 for the base amount ($60) & gradient ($5) in year 2: P2 = 60(P/A,12%,8) + 5(P/G,12%,8) = $370.41 Next, move P2 back to year 0: P0 = P2(P/F,12%,2) = $295.29

Example : John Deere expects the cost of a (a)$101 (b)$295 (c)$370 (d)$397 Example : John Deere expects the cost of a certain tractor part to increase by $5 /yr beginning 4 years from now. If the cost in years 1-3 is $60, the present worth of the cost thru year 10 at an interest rate of 12%/yr is closest to: P=? i=12% 1 2 3 4 5 10 60 60 60 65 70 95 The cash flow diagram is as follows: First find P2 for the base amount ($60) & gradient ($5) in year 2: P2 = 60(P/A,12%,8) + 5(P/G,12%,8) = $370.41 Next, move P2 back to year 0: P0 = P2(P/F,12%,2) = $295.29 Next, find PA for the $60 amounts of years 1 & 2: PA= 60(P/A,12%,2) = $101.41

Example : John Deere expects the cost of a certain tractor part to increase by $5 /yr beginning 4 years from now. If the cost in years 1-3 is $60, the present worth of the cost thru year 10 at an interest rate of 12%/yr is closest to: (a)$101 (b)$295 (c)$370 (d)$397 1 2 3 10 4 5 PT= ? 60 65 70 95 i=12% The cash flow diagram is as follows: First find P2 for the base amount ($60) & gradient ($5) in year 2: P2 = 60(P/A,12%,8) + 5(P/G,12%,8) = $370.41 Next, move P2 back to year 0: P0 = P2(P/F,12%,2) = $295.29 Next, find PA for the $60 amounts of years 1 & 2: PA= 60(P/A,12%,2) = $101.41 Finally, add P0 & PA to get PT in year 0: PT = P0 + PA = $396.70 Answer is (d)

Geometric Shifted Gradients Shifted gradients begin at a time other than between periods 1& 2 Equation yields P for all cash flow(i.e. base amt is included) P=A{1-[(1+g)/(1+i)]n/(i-g)} For negative gradient, change signs in front of both g’s

Negative Shifted Gradients For arithmetic gradients, change sign in front of G term from + to - For goemetric gradients, change signs in front of both g’s All other procedures are the same as for positive gradients