Routing Study of Light Rail Extension to Everett

Slides:



Advertisements
Similar presentations
Critical Condition Triaging School Enrollment Growth School Board Work Study November 13, 2013.
Advertisements

The concept of layers GIS and LIS Attributes of Cities in the Topography Data Frame.
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
Cambridge Area Metro Presentation to Cambridge Futures 23 rd November 2001 Michael May – Steer Davies Gleave Colin Brader - ITP.
Measuring and capturing mind share APTA 2013 Marketing & Communications Workshop.
Public Information Sessions November 30, 2010: City Center at Oyster Point December 1, 2010: HRT Norfolk.
 Matt Gates.  Forecast sprawl  Guide long-range population and employment forecasts o For the region o For individual counties  Allocate growth to.
OSG Analysis on the Gloucester County Rail Line Study State Planning Commission December 3, 2008.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood TODs & Complete Streets Unit 6: Station Design & Access.
© 2003 TranSystems Corporation Advisory Committee Meeting January 19, 2010.
King County Metro Long Range Public Transportation Plan Kirkland Transportation Commission_ April 10, 2015.
1. 2 VIA Long Range Plan  Vision for High-Capacity Transit across VIA service area by 2035  From extensive public and stakeholder input  Prioritization.
SEATTLE LIGHT RAIL STATION AREA PLANNING City of Seattle Station Area Planning in Seattle SEATTLE LIGHT RAIL STATION AREA PLANNING.
Seattle Station Area Planning Milestones & Events Transit-Oriented Development Program Information & Schedule Station Area Atlas Station Area Recommendations.
River to Sea TPO CAC A Presentation to: May 19, 2015.
Potential Sites for Transit-Oriented Development in San Diego Katie Lemmon UP 206 A Midterm Project February 8, 2011.
2030 Long-Range Transportation Plan Ithaca-Tompkins County Transportation Council Public MeetingFernando de Aragón TCPL October 15, 2008Staff Director.
Northern Lights Express High Speed Rail: MN APA Conference September 2011.
FRANCISCA MUNOZ JENIKKA PREMANATHAN SIOBHAN DAWKINS Site Selection: Regional Mall.
Background Transit-Dependent Communities o Low-income o Minorities o Auto-oriented development McKenzie 2013, Tomer 2011 Metro aims to “promote fair and.
People commuting to UW suffer delays, congestion using both public and private transportation. We propose a park & ride system with express shuttle service.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
West Phoenix / Central Glendale Transit Corridor Study Public Meetings May 2013.
Application LU-MIN Small-Scale Future Land Use Map Amendment Twenty Fingers Property May 2007 PLDRB.
Board of County Commissioners September 25, 2012.
Center for Transportation Excellence June 20 – 22, 2011.
PROJECT UPDATE PUBLIC OPEN HOUSE #3 OCTOBER 17 4:30 PM – 6:30 PM Dakota County Northern Service Center.
Planning for the Waller Creek District Oklahoma City Chamber of Commerce Delegation April 4, 2013.
Purpose To develop and evaluate a range of transit and transportation alternatives throughout the MPO area, considering: u Regional Goals and Objectives.
The Purple Line Transit Connecting Bethesda, New Carrolton, and the Washington Metro Presented by- Nick Flanders Rose Ryan Anupam Srivastava.
“Connecting People and Places” REGIONAL MOBILITY PLAN Future Scenarios October 19, 2009.
GREEN INFRASTRUCTURE FUNCTIONAL MASTER PLAN Prince George’s County MNCPP-C Draft: December, 2004.
October 2011 Schlumberger Site Assessment 36 Old Quarry Road Ridgefield.
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
SAFE ROUTES TO SCHOOL: INFRASTRUCTURE DESIGN TO CONSTRUCTION.
Orht I-5 North Coast Corridor Project CA Transportation Planning Conference – New Directions in Planning Integrating Resource and Infrastructure Plans.
Pedestrian Overpass Locations City of Kent 1. Objectives Find a location in Kent for a pedestrian overpass Allow better traffic movement by removing pedestrian.
Active Transportation Program California Transportation Commission Mitch Weiss 01/14/141.
Steve Horenstein CASE STUDIES OF COMPREHENSIVE PLAN PROCESSES AND RESULTS : Comprehensive planning as an economic development tool; Striking the right.
Introduction U.S. Army Corps of Engineers Metro Parks Mayor’s Office Metro Council District Representatives HDR, Inc.
Project Name County: X (Cuyahoga District #) Photo Type (All-purpose, Mountain Bike, Bike Lanes, etc.— pavement must be dedicated for non- motorized use.)
Land Development in Pierce County ArcGIS for Civil Engineers CEE 424 Joss Gramstad, John Wright, Brynn Carr December 8, 2006.
Solving the SR-520 Problem © 2005 Chaisy, Hurvitz, Jiang, Jun, ShinnersSlide 1 (of 31) Solving the SR-520 Problem prepared for UTRAN prepared by INSTEP.
Ayers/Saint/Gross Architects and Planners DAVIDSON CONCORD FRAMEWORK PLAN CONCEPTS.
Voorhees Town Center Vision
Rush Line Corridor: Connecting Manufactured Home Parks to Opportunity
Gateway EMX Performance Review
Mattapan High Speed Line
Plan Goals: Improve walkability and pedestrian safety Preserve and celebrate neighborhood character and sense of place Address code violations Improve.
Portuguese American Cultural Center Property Rezoning to
Planning Commission November 4, 2010
Bike and Transit Connections
Nolanville Main Street Sidewalk & Bicycle Connectivity
BNSF Railroad Trail Presented By Arvin Tunas Susan Hawk
skyway solutions BUILDING COMMUNITY, HONORING DIVERSITY
Draft Transportation Element September 6, 2017
Service Routes and Community Transit Hubs: Right Sizing Transit
Crossing Lake Washington
A Presentation to: River to Sea TPO Board May 27, 2015.
What run is the Narliest?
Streetcars, a better way to go!
Tweet about this presentation #TransitGIS
Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Board Transportation Committee October.
Adam Parast Kendra Hartstrom April Pust Sean Liner
I-85 Corridor Light Rail Transit Feasibility Study
ST CURRENT & FUTURE SERVICE MAPS
The Public Transit Using ----around Metro Purple Line
Transportation Management Plan Modernization Project
Red Line/HealthLine Extension Major
Prioritizing Watershed Protection in King County
Presentation transcript:

Routing Study of Light Rail Extension to Everett Presented by: Michael Casal Tom Le Sean Yeung Minh Pham 11 Dec. 2009 Picture: http://farm3.static.flickr.com/2476/3722296467_0ebc422d2e_o.jpg

Project goals/Design Requirements Connect U-district station to Everett Maximize potential users Minimize Impacts to existing recreational infrastructure Environmental impacts Cost

Design factors In order to achieve project restraints, data gathered for: Grade Wetlands Population Density Parks Trails Express stops (Light rail)

GIS Analysis Buffer Clips Erase Slope calculation Used constraints to narrow possible routes from U-district to Everett.

Option 1

Option 2

Option 3

Recommendations Option 1 Option 2 Option 3 This minimizes changes to existing infrastructure, follows a low slope, and runs through locations where people come from/go to. Option 2 Fails to follow population density as well as Option 1. Option 3 Fails to follow low slope constraints.

Sources Snohomish County GIS data <http://uwashington.worldcat.org/oclc/37441883&referer=brief_results>   King County GIS Data <https://wagda.lib.washington.edu/data/geography/wa_counties/king/index.html> Sound Transit Express Bus Stops <https://wagda.lib.washington.edu/data/geography/wa_counties/SoundTransit/index.html> White House Logo <http://www.wired.com/images_blogs/threatlevel/2009/05/us-whitehouse-logo.jpg>