Data provision changes

Slides:



Advertisements
Similar presentations
London & Zurich Plc User Guide. Service Benefits Full on-line management of client accounts Paperless direct debit – no signatures required Standing orders.
Advertisements

User Guide. Service Benefits  Full on-line management of client accounts  Paperless direct debit – no signatures required  Standing orders fixed not.
Civil Rights Data Collection
CIVIL RIGHTS DATA COLLECTION Workshop April 9, 2015 The Civil Rights Data Collection (CRDC) is a mandatory data collection of the U.S. Department of Education’s.
Hearth Bulk System Divisional Secretaries’ Briefing 2012.
© Copyright 2013 TONE SOFTWARE CORPORATION. Confidential and Proprietary. All rights reserved. ® Operator Training – Release Alarms Suppression and.
Tracking & Review Attaching Documents, Proposal Review, and Submission Office of Grant & Contract Services 17 January 2012.
0 eCPIC Admin Training: OMB Submission Packages and Annual Submissions These training materials are owned by the Federal Government. They can be used or.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
How long is the quiz available? The quiz will always have a start time but the end time can be unlimited or fixed. If your quiz has an END time, you will.
Extended Reserve Selection Methodology Workshop 2 Default values and proposed payment mechanism 1.
Selecting Extended Reserve Emily Calvert, Energy Analyst 1.
Invoices and Service Invoices Training Presentation for Raytheon Supply Chain Platform (RSCP) April 2016.
Orders – View and Print Boeing Supply Chain Platform (BSCP) Detailed Training January 2015.
Invoices Training Presentation for Supply Chain Platform: BAE Systems May 2015.
Efficient procurement of extended reserve Workshop 3 – operational management 28 April Auckland Clive Bull – Strata Energy Consulting.
Pennsylvania Information Management System (PIMS) PIMS Cognos Reporting Instructions December 2007.
Extended Reserve Technical Requirements Schedule (TRS) Presenters: Justin Blass, Project Manager Gillian Rodger, Power System Analysis Kevin Wronski, Compliance.
Setting Up the Enterprise Catalog
An introduction to JDM Pro Release 2.0
Fill in Application Form
ACAP Online Application Process
GC0104 – Demand Connection Code (DCC)
T3/Tutorials: Data Submission
Basic Editing Functions
College Credit Plus Updates September 12, 2016.
Blanket Purchase Orders
Los Angeles Unified School District
PLASC 2016 Secondary Schools
Required Data Files Review
Training Presentation for Supply Chain Platform: BAE Systems
ERO Portal Overview & CFR Tool Training
Using HUD's CNA e-Tool for RAD Transactions
FedEx Billing Online (FBO) Non-Revenue Quick Guide
c.net5 Online Management
Boeing Supply Chain Platform (BSCP) Detailed Training
c.net5 Direct Management
Download Orders, Shipments, and Receipts
R4BP 3.9 key users testing Introduction 4-5 May 2017 Roberto Gilioli
Efficient procurement of extended reserve Industry briefing
Managing One-Time Payments & Compensation changes in Workday!
Overview & Basic Functionality
Results-Driven Priorities Application Training
Draft extended reserve selection methodology
Uploading Data in the Staff Interchange
Trial balance financial accounts submissions
Tier 4 financial accounts submissions
Download Orders, Shipments and Receipts
FAFSA on the Web Preview Presentation
Guidance for PALS Proposers Day Poster
Guidance for PALS Proposers Day Poster
Hearth Bulk System Divisional Secretaries Briefing 2011.
Performance Review Submission Process and Steps for HRLs
PLASC 2012 Secondary Schools
5MS Systems Working Group
Word offers a number of features to help you streamline the formatting of documents. In this chapter, you will learn how to use predesigned building blocks.
NHS Adult Inpatient Survey 2018
Responding to a Rogers Sourcing Event STEP Table of Contents Page
Web SA: File Upload Function
Overview of Contract Association Batch Upload
Patient Safety Reporting System Course Contents
Lessons Learnt UKLC - November 2015
Cases Admin Training.
WALL COLMONOY NAME OF PRESENTATION DATE.
Meter Reads.
EMS &Trauma Registries Update
Manage Sourcing - Supplier
CSI Human Resource (HR) Data Collection Prep
Purchase Document Management
SESSION TITLE Session #<insert number here> Date Month Year
Presentation transcript:

Data provision changes Extended reserve manager Consultation briefings 31 October 2016 - Wellington 3 November 2016 - Auckland

Contents Summary of changes Unit configuration file Unit load file Uploading to the portal Cleaning and estimating data © Copyright NZX Ltd. 2016

In response to feedback The key changes: Unit configuration csv fields simplified, better explanations Unit load csv simplified and layout changed Portal changes Instructions and checklists to clean data Instructions for estimating missing or bad data

Example – unit configuration file Unit Configuration Changes 19 fields remain the same Removed fields – double-ups or no longer needed: currently used currently provide flexible currently armed SCADA indication SCADA capable Clarified the instructions: General rule: state the characteristics the demand unit will have when in service. current block allocation – 1 or 2 if currently on an AUFLS block at point of submission, or N if not Altered fields: existing functionality = trip control df/dt – U or B only – existing relays will be U for under-frequency only, or B for both df/dt and u/f. All new relays will be B as they must be supplied with both. flexible capability – S or N – S for the demand unit is capable of being armed and disarmed via SCADA remote control or N if no fast response capable – Y or N – when in service, will the demand unit be capable of responding within <250ms New fields: zone substation – text identifier, or N for no zone sub tested block 1 tested block 2 tested block 3 tested block 4 Note: N to all for the first selection process. Y for second / later selection processes where the demand unit is configured and tested for the AUFLS block settings. © Copyright NZX Ltd. 2016

Example – unit load file Unit Load Changes Major change to file format. Instead of 50-54 columns holding all trading periods for 1 day for a Demand Unit, we now have 4 columns holding the data for one trading period for one Demand Unit. (old file format on top, new file format on bottom) Also: Header changed – now column headings Removed fields: flow direction checksum Altered fields: date becomes trading period © Copyright NZX Ltd. 2016

Example – unit load file Start of daylight saving © Copyright NZX Ltd. 2016

Example – unit load file End of daylight saving © Copyright NZX Ltd. 2016

Screenshots of new portal © Copyright NZX Ltd. 2016

Screenshots of new portal – Successful file upload © Copyright NZX Ltd. 2016

Screenshots of new portal – File upload failure © Copyright NZX Ltd. 2016

File upload process Portal changes More flexibility in grouping your unit load data Better help / validation comments on the portal Samples of unit load and unit configuration files © Copyright NZX Ltd. 2016

Cleaning data – zeros Data specification: instructions section 4.3, checklist section 5.5 1.3 million zeros submitted in the most recent year of data Some zeros are valid (see 4.3.1, page 21) ERM did not query the submitted zeros to the level proposed in the data specification ERM may query: >6 contiguous zeros (3 hours for a planned outage) >50 zeros per demand unit per year (total outages) © Copyright NZX Ltd. 2016

Cleaning data – negatives, spikes Data specification: instructions section 4.3, checklist section 5.5 Negative values must be confirmed (injections are rare) Spikes, swells: must be identified for each year and demand unit identify any trading period MW value that is >200% of the average annual MW value © Copyright NZX Ltd. 2016

Estimating data Guidance provided: Data specification section 4.4 Guidance provided: Copy from most relevant similar period OR Average of several equivalent periods © Copyright NZX Ltd. 2016

Draft data specification This is a draft specification The data specification is subject to finalising the selection methodology so changes may occur. © Copyright NZX Ltd. 2016

Questions © Copyright NZX Ltd. 2016