CEAF Type: Change Approval Request

Slides:



Advertisements
Similar presentations
Update to RMS February 3,  2015 AMWG Leadership ◦ Esther Kent (CNP) and John Schatz (TXU), by affirmation, return as co-chairs  2015 AMWG Goals.
Advertisements

1 Confidential PCR Process Change Request Mike Rizuto Supplier Development Technologist March 16, 2015 Rev 3.
Industrial Power Systems Division Confidential ‘Green’ Emissions Compliance Flexibility Schemes.
Phase Difference = Phase Difference = 0.05.
Concept Analysis Document Executive Summary Template, (To view template instructions – Save this template to project files, reopen and then select View,
Product Ratings and Performance Certifications Presented by: Tom Gustafson, Hartzell Fan, Inc. AMCA International Technical Seminar 2009.
Travel Website Enhancement Project Project Update First Name Last Name.
Legal Notices and Important Information Intel processor numbers are not a measure of performance. Processor numbers differentiate features within each.
Project Status Report Presenter Name Presentation Date.
July 11, 2003 HAPL e-meeting. 1 Armor Design & Modeling Progress A. René Raffray UCSD HAPL e-meeting July 11, 2003 (1)Provide Parameters for Chamber “System”
Topic 6 Managing stage boundaries
Copyright © 2007, Oracle. All rights reserved. Using Change Management.
Kevin Colvett, P.E. Nashville Corrective Action Plan and Engineering Report, Phase III for Metro Water Services and the City of Brentwood, TN Presentation.
The reading is 7.38 mm. The reading is 7.72 mm.
PROCUREMENT General Overview of Procurement Process on Dublin Waste to Energy Project.
Single Module Vertical Outlet Tube Change
2017 Single Module Beta to LP Changes
Last results from tests
Date of download: 10/12/2017 Copyright © ASME. All rights reserved.
MP3L David Keng, Monica Agarwal 03/17/2008
Presenter Name Presentation Date
2018 Natural Gas Beta to LP Changes
FHS 9th Grade Electives & Other Graduation Requirements
CEAF Type: Awareness Engine Family Affected: MXNA
Presenter Name Presentation Date
Dimensioning Standards
Info. For CEAF Heated Breather Tube Change Engines: QSB4. 5/6
Governor Pad Location Change on ISC/ISL HT Twin Cylinder WABCO Air Compressor Mahesh Koyyada on behalf of Kimberly Van Selow.
2016 PM sensor water shield addition in Horizontal Side-Out (ISB and ISX applications) and Vertical End-Out (ISB applications Only) SCR 11/30/2015.
عمل الطالبة : هايدى محمد عبد المنعم حسين
L9 E6 OBD Phase C Product Update
Changing the orientation of the adjusting link within CF Options to resolve interference issue Options Impacted: CF , CF , CF , CF ,
VPCR CEAF César F. Demarchi March, 22nd 2017.
Information To support CEAF Obsoleting Grid Heaters with Heater Control Modules for B Tier 1 and Tier 2 Options: AH9044, AH9083, AH9084, AH9122, & AH9128.
Removing the Backshell from Oil Pressure Sensor Connector Option Impacted: WR ,WR ,WR ,WR ,WR ,WR ,WR ,WR ,WR ,WR ,
Information to Support CEAF: ISL Euro3 WWCP V Software Update
Information to Support CEAF: New Software release for ISB and ISL Euro 4 and 5 Products Lisa Ferguson Cummins Confidential.
Affected Options: BR Option; EB Option; PH Option;
Information to support CEAF Notification of approval of new assembly line at the suppliers Chinese manufacturing location for the , COMPRESSOR,
LP fuel lines redesign on ISX15 engines Date- 6th Sep 2017
Tolerances.
Mounting Zone Edge and Profile Tolerance Change on EPA2017 Inlets
Sticker Label Location Change on UL2 Supply Module
Pilot phase - Learnings
LP fuel lines redesign on ISX15 engines Date- 6th Sep 2017
EGTS CAL ID Update Cummins Confidential CEAF Type: Change Notification
VPCR OVERVIEW The banjo fitting, from Cummins ISL16 330, is not oriented to install the remote fuel filter. As shown in the picture #1(next slide), the.
a + 2 = 6 What does this represent? 2 a
Project Scope Change Summary: Processing change at RMEP to close draincock P/N S923E on all L series engines Background: Customers have requested that.
Hydraulics Updates to the IndianaDesign Manual
TOLERANCES.
LP fuel lines redesign on ISX15 engines Date- 4th Aug 2017
Thing / Person:____________________ Dates:_________________

LP fuel lines redesign on ISX12 engines Date- 6th Sep 2017
Cummins Westport Near Zero Engines.

Presentation transcript:

Lift Eyes Tolerance Change for EPA2017 Horizontal Systems- Updated EI & EO Linear Tolerance CEAF Type: Change Approval Request Technical Configuration(s) Affected: D313029BX03, D563025BX03 , D103016BX03 Engine Family Affected: ISB, ISL, ISX Market(s) Impacted: On-Highway. Anticipated Production Date (mm/yy): 10/2016 Option(s) Affected: PE9487, PE9485, PE9486, PE9532, PE9483, PE9534, PE1072, PE1073.

Overview of Change Immediate need to deviate from current lift eye tolerances due to limited manufacturing process capability. This would be followed by a change of lift eye tolerance callouts on P-phase prints. Configurations Impacted: All Horizontal Systems

Print Tolerance Callout Change on Side Inlets and Side Outlets +/-3° Lift Eye Tolerance Change on Side Inlets and Side Outlets: Linear: +8mm/- 5mm Angular: +/- 3° The P-phase prints will include lift eye tolerances that are smaller or equal to the above listed values. +8mm/- 5mm Current Lift Eye Tolerance Callout on Prints

Print Tolerance Callout Change on End Inlets and End Outlets Lift Eye Tolerance Change on End Inlets and End Outlets: Linear: +2.5mm/-5mm Angular: +/- 3 ° The P-phase prints will include lift eye tolerances that are smaller or equal to the above listed values. +2.5mm/-5mm +/-3° Current Lift Eye Tolerance Callout on Prints