e-/e+ Vertical beam size with 6 Wigglers Low and Off

Slides:



Advertisements
Similar presentations
AR1 BPM Calibration (for new electronics) Before any TOA measurements we attempted to look at the BPM calibration (AR2-BPM-03) Turn off quads (Q1,Q2) and.
Advertisements

FLASH Simulations SASE Killer Igor Zagorodnov S2E Meeting DESY 24 June 2014.
BUILD-UP SIMULATIONS FOR DAFNE WIGGLER W/ ELECTRODES Theo Demma.
Electron cloud tune shift measurements for long trains Tune Shift versus current: Measured the tune shift for 45 and 115 bunch positron trains with 14ns.
Electron-cloud instability in the CLIC damping ring for positrons H. Bartosik, G. Iadarola, Y. Papaphilippou, G. Rumolo TWIICE workshop, TWIICE.
E+ Tune Measurements for 4-ns Spaced Bunches Tune Measurements of 4-ns spaced bunches: An update of the strides made using the digital BPM system to measure.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York Recent Studies with ECLOUD Jim Crittenden Cornell Laboratory for.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
Health Products. What is the Function of this Product? 1.
25-26 June, 2009 CesrTA Workshop CTA09 Electron Cloud Single-Bunch Instability Modeling using CMAD M. Pivi CesrTA CTA09 Workshop June 2009.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
Witness Bunch Experimental Studies at CESR-TA Robert Holtzapple Alfred University/Cal Poly San Luis Obispo.
E- Cloud Machine Studies-Systematic Study of Single Bunch Tunes I. Pinger timing effect on single bunch tunes II. Vertical/horizontal pinger high voltage.
Recent electron cloud studies at CESR David Rice Cornell University Laboratory for Elementary-Particle Physics.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Use of Node Locate in a very large Piping Model TRIFLEX® WINDOWS PipingSolutions, Inc. 22 June
Lattice DSB (new version in progress) S. Guiducci Webex 8 February 2011.
Intra-beam Scattering in the LCLS Linac Zhirong Huang, SLAC Berlin S2E Workshop 8/21/2003.
Cesr-TA Simulations: Overview and Status G. Dugan, Cornell University LCWS-08.
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
RMS Dynamic Simulation for Electron Cooling Using BETACOOL He Zhang Journal Club Talk, 04/01/2013.
Distributive Property Review 2(x + 4) 2(x) + 2(4) 2x + 8.
3 February 2010 ILC Damping Ring electron cloud WG effort Mauro Pivi SLAC on behalf of ILC DR working group on e- cloud ILC DR Webex Meeting Jan 3, 2010.
Parameter scan for the CLIC damping rings July 23rd, 2008 Y. Papaphilippou Thanks to H. Braun, M. Korostelev and D. Schulte.
TBT Data & Lattice Measurement for Recycler Ming-Jen Yang December 17, 2014.
IntraBeam Scattering Calculation T. Demma, S. Guiducci SuperB Workshop LAL, 17 February 09.
Electron Cloud R&D at Cornell ILCDR08--7/8/08
Solving Multi-Step Equations and Using the Distributive Property
e- Cloud Machine Studies-Tune Shift Studies
Machine parameters of SuperKEKB
Electron Cloud Meeting
IntraBeam Scattering Calculation
IntraBeam Scattering Calculation
Recent Electron Cloud Studies at CESR and Future Plans
A.Kulikov SLAC MAC review October 2003
The Effect of Poisson Data Weighting on Streak Camera Diagnostics
e+/e- Vertical Beam Dynamics during CHESS Operation-Part II
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
أنماط الإدارة المدرسية وتفويض السلطة الدكتور أشرف الصايغ
Movies v Plays
CesrTA Experimental Schedule and Priorities
This file contains class distributions for all quizzes and exams, starting with quiz 1. Two graphs will be posted for each quiz/exam. The first graph.
e+ Vertical Beam Size during CESR-c Collisions
e+/e- Vertical Beam Size during CESR-c Collisions
e-/e+ Vertical Beam Dynamics with 6 and 12Wigglers On
ILC Damping Ring electron cloud WG effort
ICFA Mini-Workshop, IHEP, 2017
e- tunes-witness bunch 42
e+ Vertical Beam Size during CESR-c Collisions
ECMbias in the presence of Beamstrahlung
G. Codner, E. Tanke, M. Palmer Cornell University
The mid-point of two points.
e- Cloud Studies-Tune Studies with 45 Bunch Trains
M. Forster, G. Codner, R. Holtzapple, J. Kern, and E.Tanke
Comparing Permitted And Protected Left Turn Phasing
Comparing Protected/Permitted And Protected Left Turn Phasing
Beam Size Flip-Flop Measurements
Introduction to excel and Distributions
EXP file structure.
e+/e- Vertical Beam Size during CESR-c Collisions
Preliminary Analysis of April 24, 2006 CESR Bunch Measurements
e+ tunes-witness bunch 42
Averages and Range: Mean from a list of data – version 2
M. Forster, G. Codner, R. Holtzapple, J. Kern, and E.Tanke
JLEIC Ion Integration Goals
Domain-Range f(x) Notation
JLEIC electron ring with damping wigglers
Presentation transcript:

e-/e+ Vertical beam size with 6 Wigglers Low and Off R. Holtzapple, G.Codner, M.Forster, J. Kern, M.Palmer, and E.Tanke 8/24/2006

e+ 100 Turn Average Distribution e+ Single Turn Distribution

e+ Single Turn Dynamics e+ I=0.5mA/bunch Wiggler On File:418 Movie of single turn mean position and sv for all 45 bunches.

e+ I=0.5mA/bunch 6 Wigglers @80% File: 421

e+ I=0.5mA/bunch 6 Wigglers @60% File: 423

e+ I=0.5mA/bunch 6 Wigglers @30% File: 426

e+ I=0.5mA/bunch 6 Wigglers Off File: 428

e- 100 Turn Average Distribution e- Single Turn Distribution

e- single Turn Wigglers On I~1.9mA Bunch 10

e- Bunch 30 Wigglers on I~1.9mA/bunch

e- Bunch 32 Wigglers on I~1.9mA/bunch

e- I=0.56mA/bunch 6 Wigglers Off File: 430

e- I=0.78mA/bunch Wigglers On File: 407

e- I=1.9mA/bunch Wigglers On File: 401

e- I=1.9mA/bunch Wigglers On File: 401 Bunch 1 Bunch 10 Bunch 5 Bunch 15 Movie of the 1st 50 turns of every 5th bunch

Bunch 20 e- I=1.9mA/bunch Wigglers On File: 401 Bunch 30 Bunch 25 Bunch 35

e- I=1.9mA/bunch Wigglers On File: 401 Bunch 40 Bunch 45