Work Update J. Rzepiela 8/17/10.

Slides:



Advertisements
Similar presentations
Emittance dilution due to misalignment of quads and cavities of ILC main linac revised K.Kubo For beam energy 250 GeV,
Advertisements

Emittance dilution due to misalignment of quads and cavities of ILC main linac K.Kubo For beam energy 250 GeV, TESLA-type optics for 24MV/m.
 LCLS beam energy is 200-times lower at sec-21 than SLC beam (2-times lower in FFTB)  LCLS emittance is 5-50 times smaller than SLC  Need weaker corrector.
Hamid Shoaee High Level Physics 20 April 2006 High Level Physics Applications Update on Plans, New Directions Fairley,
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
Mike Zelazny FAC April 17 th, 2007 Matlab Applications Image Management Bunch Length Measurement Feedback Software Engineers.
Diane Fairley High Level October 24-28, 2005 High Level Physics Applications LCLS Week / FAC October 24-28, 2005.
November 12, 2008 Controls Software D. Fairley LCLS Feedback.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Diane Fairley High Level October High Level Applications FAC Review October 12, 2006 High Level Applications.
Simulation of IP beam size with orbit jitter + wakefield in EXT-FF ATF2 Project Meeting K.Kubo.
Update on ILC ML Lattice Design Alexander Valishev, for the FNAL LET group FNAL AP Dept. Meeting March 7, 2007.
CLIC programme at FACET Update on CERN-BBA A. Latina, J. Pfingstner, G. De Michele, D. Schulte (CERN) E. Adli (Univ. of Oslo), J. Resta Lopez (IFIC) In.
Tests of Dispersion-Free Steering at FACET (CERN-BBA) A. Latina, J. Pfingstner, D. Schulte (CERN) E. Adli (Univ. of Oslo/SLAC) In collaboration with: F.J.
Characterization of Fast Orbit Feedback System Om Singh, APS, ANL NSLS-2 Beam Stability Workshop BNL, April 18-20, 2007.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
BROOKHAVEN SCIENCE ASSOCIATES High level applications and EPICS control GUOBAO SHEN NSLS-II, Control Group May 4 th, 2009.
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
Providing Beams for Power Production What has been done Problems and Boundary Conditions Future improvements and possibilities.
Baseline RTML in TDR ( For discussion ) S.Kuroda ( KEK )
Wire scanner controls at SLAC. Subgroup for one emittance measurement station Wire to select Scan range Park position Selection x,y,u Single scan Start.
July 19-22, 2006, Vancouver KIRTI RANJAN1 ILC Curved Linac Simulation Kirti Ranjan, Francois Ostiguy, Nikolay Solyak Fermilab + Peter Tenenbaum (PT) SLAC.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
1 Henrik Loos 1 13 Sep 2011 APE Meeting Recent Activities H. Loos 09/13/2011.
Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
1 H. Hayano for the ATF collaboration Low Emittance Beam Generation in ATF H. Hayano for the ATF collaboration BPM electronics improvement emittance tuning.
1 Alternative Bunch Compressor 30 th Sep KNU Eun-San Kim.
Kiyoshi Kubo Electron beam in undulators of e+ source - Emittance and orbit angle with quad misalignment and corrections - Effect of beam pipe.
Specifications of Tevatron BPM Upgrade Jim Steimel.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
9/2/2003Tev BPM requirements1 Tevatron BPM and BLM requirements Mike Martens.
1 1 Orbit Response Update 30September 2010 Jeff Rzepiela Update 9/30/10 J. Rzepiela Orbit Response Measurements.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Controls Test Stand Test stand proposal document review - Dayle. The activities can be prioritized according to which measurements we need to do first.
ERHIC Orbit Correction Studies (Minor Update) Using Oct’14 lattice and dispersion diagnostic January 5, 2015Stephen Brooks, eRHIC FFAG meeting1.
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg June 18-20, SLAC Tune Tracker/Feedback Mike Laznovsky.
LCWS, UTA, Reaching ultra-low emittance at SLS through (systematic and) random optimization LCWS 2012 Joint CLIC/ILC Working Group – Damping.
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
What did we learn from TTF1 FEL? P. Castro (DESY).
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
8 th February 2006 Freddy Poirier ILC-LET workshop 1 Freddy Poirier DESY ILC-LET Workshop Dispersion Free Steering in the ILC using MERLIN.
IP Tuning Task Updates Glen White, SLAC January
LCLS Commissioning & Operations High Level Software
FACET Tests Update A. Latina, J. Pfingstner, D. Schulte,
Operations Machine Simulator.
Weiming Guo Accelerator Physics Group / ASD Advanced Photon Source
Further Tracking Studies and March Trip Plan
Firmware Update 29/03/2017 Rebecca Ramjiawan.
March Trip Plan Mikey Davis 01 March /7.
LCLS Commissioning & Operations High Level Software
Progress activities in short bunch compressors
Alice solenoid – orbit distortion
What am I working on… H. Loos 08/02/2010.
Status of Phase Feedforward Tests
Data Mining Ideas.
Orbit Response Measurement Update
Multiplexing of LCLS II SXR beamlines using a canted undulator concept
Project updates Jeff Rzepiela 6/28/11.
Juan, Emanuele, Natalia, Yngve, Sofia
Beam-Based Alignment Results
APE Update Nate Lipkowitz 9/13/2011.
OCELOT orbit correction and optimizer
High Level Physics Applications for LCLS Commissioning
Linac Diagnostics Commissioning Experience
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
Thursday 10:00 Fill 1986 in stable beams.
LHC An LHC OP guide… under construction J. Wenninger
High Level Physics Applications Lehman Review February 7 - 9, 2006
100th FCC-ee Optics Design Meeting
Presentation transcript:

Work Update J. Rzepiela 8/17/10

Summary Enhancements to existing HLA Ease-of-use Orbit Response Wirescanner jitter correction Correlation Plot prescan Correlation Plot smoothing Correlation Plot zigzag mode Correlation Plot multiknob support Ease-of-use Charge Change FEE Mirror Switch Orbit Response IOC support

Enhancements to existing HLA Wirescanner

Enhancements to existing HLA Correlation Plot

Correlation Plot -- Prescan

Correlation Plot -- Smoothing

Ease of Use – Charge Change

Ease of Use – FEE Mirror Switch

Orbit Response Program Any corrector in any sector is selectable The max range, number of kicks, and settle time are configurable Orbit response at each BPM in sector is measured for each kick Can display measured orbit response, model orbit response, etc.

IOC support -- Emittance Soft IOC Added PVs to store measured bunch lengths Added FEE HW devices (e.g. pop-ins) to store photon beam size measurements in PVs