Kevin “Doc” Hoover Water’s Edge Hydrology, Inc.

Slides:



Advertisements
Similar presentations
Kevin L. Hoover Waters Edge Hydrology, Inc. – Wetland Conservation Approaches.
Advertisements

Maryland Department of the Environment Restoration and Regulation Discussion Presented by: Wetlands and Waterways Program Maryland Department of the Environment.
LEGG PARK DOG PARK PROJECT DESIGN Prepared for: Meridian Township Parks Commission Board August 9, 2011.
Ecological Systems Maintaining and Enhancing Natural Features and Minimizing Adverse Impacts of Infrastructure Projects Course Review.
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
SMCRA Surface Mining Reclamation and Control Act of 1977 imposed uniform standards of what was required for reclamation Title II of Act Sets up Office.
North Carolina Ecosystem Enhancement Program (NCEEP) Project Implementation.
Bill Orme, Senior Environmental Scientist, State Water Board Liz Haven, Asst. Deputy Director, Surface Water Regulatory Branch, State Water Board Dyan.
-Reducing Wildlife Hazards through Habitat Modification -34 th Annual Airports Conference Loomacres Wildlife Management
Clean Water Act Section 404: An O&G Perspective Andrew D. Smith SWCA Environmental Consultants.
Environmental Consultants BMI Environmental Services, LLC AN OVERVIEW OF THE WETLANDS REGULATORY PROCESS AS IT RELATES TO THE PROPOSED OCEAN SPRINGS HIGH.
Siting Considerations for Utility Scale Photovoltaic Power Generation Systems. Tim Green, Brookhaven National Laboratory NE FWS Biologists Conference February.
Most Common Conservation Practices Forestry Illinois.
Wetland Creation Why and How Char Ison and Caleb Asbury.
Watershed-based Plan To Restore the Hackensack Meadowlands: The Meadowlands Comprehensive Restoration Implementation Plan Terry Doss and Karen Appell The.
S e s s i o n 5 Managing riparian land for terrestrial wildlife.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Non-Zoning Wetlands Bylaw Public Hearing January 15, 2009
Alkali Creek Road Slope Stabilization and Stream Relocation The project scope changed after major rainfall caused slope failure jeopardizing safety and.
ARE 309Ted Feitshans020-1 Unit 20 Regulation of Wetlands Section 404 of the Clean Water Act, Section 10, Rivers and Harbors Acts of 1890 and 1899.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Implementing Conservation Measures to Reduce Impacts to Migratory Birds.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
Farm Ponds and Fish and Wildlife
River and Canal Maintenance Activities Allowed Under RIDEM Wetlands and Water Quality Regulations Russ Chateauneuf Chief Groundwater & Wetlands Protection.
Maximizing Impact / Minimizing Impact: Balancing Human and Environmental Concerns through Site Access Design Lee-Anne Milburn Department of Landscape Architecture.
Mission, Brender, and Yaksum Creeks Habitat Conditions Low flows and associated high temperatures affect distribution and abundance of native species.
Restoration Ecology. Key terms Intervention Mitigation Reallocation Reclamation Re-creation Rehabilitation Remediation Restoration.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Fish Habitat Restoration.
Wetlands and Waterways Permits Ken Franklin Statewide Permits Program Coordinator Geo-Environmental, ODOT.
Low Impact Development (LID)
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
Recreational Trails Program Federal Requirements.
Importance of the Lower Wenatchee River in Salmon Recovery* The Lower Wenatchee is a critical migration corridor for all ESA listed species Of the total.
WETLANDS, PERMITS, AND CONSTRUCTION INSPECTION Project Inspectors Conference Wilsonville, Oregon Presentation by: Oregon Department of Transportation Environmental.
Why Conserve Swainson’s Hawks?. Two Reasons Endangered Species Act –Section 2080 –Incidental take permit –HCP CEQA –Mandatory finding of significance.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers Mobile District General Permit for Living Shorelines in Alabama and Mississippi.
Nashville Zoo at Grassmere Stream and Water Quality Improvements Quality Improvements Littlejohn Engineering Associates, Inc. Civil & Environmental Consultants,
Nason Creek Salmon Habitat Conditions* Development, and road building have affected riparian (streamside) habitat, large woody debris and gravel recruitment.
Planning Habitat Restoration for Dredging Projects WEDA Midwest Chapter Conference Green Bay, Wisconsin April 27, 2012 Jack Brunner.
Copyright © Kenneth Adelman, California Coastal Records Project. Malibu Lagoon Slide 1.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
Land Stewardship Program 10 Year Strategic Plan. Manages District natural areas, protect lands and mitigation banks through: Enhancement Enhancement Restoration.
Environmental Mitigation and ePM Project Commitment Database.
Definitions Wetlands Soils Plants Restoration.
1 Introduction to Ecological Re-Use Concepts: ITRC Technical and Regulatory Guidance Document 2006 Brownfields Conference Boston, Massachusetts Charles.
Restoration of the Swan Pond Embayment Michelle Cagley, Tennessee Valley Authority.
Overview of Everything You Need to Know About Mitigation.
Wetlands Focus Group. Responsibilities and Goals   Growth Managements Act (Chapter 163, FS) of 1985   Included the adoption of the State Comprehensive.
OPEN SPACE/ CONSERVATION
Restoration and Regulation Discussion
Watershed-based Plan To Restore the Hackensack Meadowlands:
Wayne C. Lehman Fish and Wildlife Regional Manager (Retired)
Restoration and Regulation Discussion
Environmental Critical Areas Regulations
Integrating Wetlands and Watershed Management: Lessons from the U.S.
THE CORPS REGULATORY AUTHORITY
The Gila River Restoration at Apache Grove
Hudson Wetlands Protection Bylaw
Delaware Bay Regional Biologists
Protection of species and habitats
Construction Management & Inspection
EPA Public Meeting Dallas, Texas May 10, 2005
Bill Kleiman Nachusa Grassland Project Director The Nature Conservancy
Wetland Mitigation.
Moratorium Session 7 Oceanfront Development Proposals: December 3rd Folly Beach Planning Commission Reminder that this presentation, as well as past.
Watershed-based Plan To Restore the Hackensack Meadowlands:
Environmental Regulations:
Restoration and Regulation Discussion
CONSERVATION 20/20 MANAGEMENT AND MANAGEMENT TRUST FUND OVERVIEW
Presentation transcript:

Kevin “Doc” Hoover Water’s Edge Hydrology, Inc. Wetland Mitigation Approaches Kevin “Doc” Hoover Water’s Edge Hydrology, Inc.

Mitigation Categories Creation – conversion of existing uplands to wetlands. Restoration – recovery of historic wetlands from disturbed conditions. Enhancement – improving the functions and values of wetlands. Preservation – protection of wetlands from future impacts.

“Wetland Triangle”

Conversion Considerations

Creation Can use excavation, fill, or both Avoid creating open water. Use sloping margins. Consider adding organic amendments Mitigation Ratio = 1 to 1 max.

Restoration Remove fills from historic wetlands. Impound artificial surface drainage. Break up subsurface drainage. Re-fill excavated areas to restore vegetation. Mitigation Ratio = 1 to 1 max.

Enhancement Remove invasive species. Plant to upgrade category (i.e. emergent to scrub/shrub). Plant adjacent uplands for fringe habitat. Add habitat features (bird boxes, nesting platforms, brush piles). Mitigation Ratio = 3 to 1 max.

Preservation Allowable only for certain situations. High value wetland No practical alternative May be component with other mitigation types Use by landowners restricted. May require fencing or signage. Mitigation Ratio = 4 to 1 max.

Other Considerations Total area requirements Deed restrictions Post-construction monitoring Repairs and maintenance Permit expiration dates Completion reporting

AVOIDANCE Saves Time Effort MONEY!