Houston, 4th & 5th February 2003

Slides:



Advertisements
Similar presentations
Predicting Future Gas Lift Performance in a Mature Water Flooded Field
Advertisements

Accounting and finance
Importance of Effective Sand Management - DTI View Colin Cranfield Reservoir Engineer Licensing & Consents Unit, Aberdeen.
by Wim der Kinderen Consultant Production Technologist
Modern pipe network models
Asset Management Optimization using model based decision support Speaker: Francesco Verre SPE Dinner Meeting – 25 th October 2011 – London.
Subsea Production Assurance A new generation of Smart Qualified Subsea Flow Assurance Integrity Monitoring Tools.
Choke Correlation and Gas Lift Curves P2ES Provides Several Curve Options 1.CC – Choke Correlation Curve Based on Oil Rate (OR) Based on Total Liquids.
McGraw-Hill/Irwin Copyright 2006 by The McGraw-Hill Companies, Inc.
Johan Castberg Production Challenges
Pipe Networks Pipeline systems Pumps pipe networks measurements
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Pipe Networks  Pipeline systems  Transmission lines  Pipe networks  Measurements.
Modeling River Ice and River Ice Jams with HEC-RAS
Lease Automatic Custody Transfer
The Master Budget and Flexible Budgeting
© Copyright 2005 POSC Production Reporting (draft specifications) Overview.
By: Gatut Widianoko Weatherford Artificial Lift Systems
Gas Lift Design Philosophy for Chevron’s Subsea Developments
Gas Lift Redesign in Dual Strings Completion
© Copyright 2006 POSC1 Gas Lift Scenario Flow Network Construction.
© ChevronTexaco 2001 Use of Transient Simulators to Assess Gas Lift Viability for Offshore Angola 2002 North American Gas Lift Workshop SHAUNA NOONAN /
Introduction A GENERAL MODEL OF SYSTEM OPTIMIZATION.
A decision services company dedicated to assist clients with the application of optimization technologies, and conceptual study techniques Upstream Services.
Shell Global Solutions PRODML Business Overview Ron Cramer.
2003 ASME/API GAS-LIFT WORKSHOP Dual Gas Lift – EMEPMI Experience
Petroleum Experts Ltd. Janvier Lissanon
LAFAYETTE, LA NEW ORLEANS, LA HOUSTON, TX.
© Copyright 2005 POSC Volume Reports and Flow Networks Overview.
Valuation of bonds and shares. Bonds Generally a fixed income security which promise to give a certain fixed cash flow to the holder at certain pre-determined.
ARTIFICIAL LIFT METHODS
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Pipe Networks 
Asset accounting-29.pptx This course will give an overview of the following Workbreakdown Structure Network Project Builder Project Planning.
Honeywell Proprietary Honeywell.com  1 Document control number Applying Automation Technology to Shale Gas Production Jerry Stanek Sanjay Sharma Jeff.
Gas Lift Design Philosophy for Subsea Developments 2001 European Gas Lift Workshop.
The Total Costs Curve TOTAL COSTS FIXED COSTS Revenue $$$ SALES VOLUME BREAKEVEN VOLUME VARIABLE COSTS.
Business Intelligence Energy, Resources and Utilities.
Oil and Gas Technology Program Oil and Gas Technology Program PTRT 2432 Artificial Lift Green Book Chapter 1 Planning an Artificial Lift Program.
Day 1 Session 1 Day 1Introductions Economics and accounting Building a basic project cash flow Economic and risk indicators The.
Fluid Sampling and Hydrates. Group Members:  Mohammad Afaq Akbar(23)  Nisar Ali(39)  Saif Ur Rehman(43)  Shahnawaz(46)  Uzair Ahmed Khan(49)
Risk and Managerial (Real) Options in Capital Budgeting
Subsea Injection Flow Metering
5th Shire River Basin Conference 22 February 2017 Shire River Basin Management Project Shire Basin Planning Tool Sub-Component A1 Development of a.
Day 4 – Part 1: Lumping and De-lumping
Novel Data Integration for Production Optimization: Two Case Studies
Financial Statements – Income Statement
Overview Modern chip designs have multiple IP components with different process, voltage, temperature sensitivities Optimizing mix to different customer.
Martin Shaw – Reliability Solutions
Asekhame Yadua Introduction Main Results
Analysis of Heading in Artificially Lifted Wells
Actual Postings Financial accounting Materials mgmt Controlling
Introduction to Decision Analysis & Modeling
Martin Shaw – Reliability Solutions
Gas Properties & PVT Tests
Automated Gaslift Control Pecten Cameroon Company
Exercise 1 HYSYS Review 11/12/ Design & Analysis II.
MARKETING WANTS ANOTHER $50,000
Continuous improvement is the process by which organizations frequently review their procedures, aiming to correct errors or problems. The most effective.
Production Reporting (draft specifications)
Flow Network Construction
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan Robustness Diagram Trends and Challenges.
Gas-Lift Breakout Sessions Fall 2003 Gas-Lift Workshop
CHAIR - JIM BENNETT EXXONMOBIL
Pipe Networks Pipeline systems You are here Transmission lines
Managing and Improving Reliability across the Entire Life Cycle
The Master Budget and Flexible Budgeting
Chapter 16 Joint Costs.
Chapter 25 price planning Section 25.1 Price Planning Issues
Lecture was elaborated with the help of grant project of Ministry of Education, Youth and Sports, FRVŠ n „Innovation of Subject Financing of Building.
Pipe Networks Pipeline systems You are here Transmission lines
Presentation transcript:

Houston, 4th & 5th February 2003 15/11/2018 Spring 2003 Gas Lift Workshop Unlocking the Value in Marginal Mature Fields: “Chasing the Barrels by Field-wide Gas Lift Gas Allocation Optimisation” Houston, 4th & 5th February 2003

IVANHOE, ROB ROY, HAMISH FIELDS - LOCATION 15/11/2018 IVANHOE, ROB ROY, HAMISH FIELDS - LOCATION 10°W 10°E 0°E 60°N 50°N Aberdeen UKCS Blocks 15/21a & b outer Moray Firth Scott / Telford

IVANHOE, ROB ROY, HAMISH FIELDS - DEVELOPMENT SCHEMATIC 15/11/2018 IVANHOE, ROB ROY, HAMISH FIELDS - DEVELOPMENT SCHEMATIC

IVANHOE, ROB ROY, HAMISH FIELDS - TOP RESERVOIR 15/11/2018 IVANHOE, ROB ROY, HAMISH FIELDS - TOP RESERVOIR 2km Ivanhoe Rob Roy Hamish

IVANHOE, ROB ROY, HAMISH FIELDS - RESERVOIR CHARACTER 15/11/2018 IVANHOE, ROB ROY, HAMISH FIELDS - RESERVOIR CHARACTER Supra Piper Mid Shale Main Piper GR FDC/CNL K PHI DT Basal shale

IVANHOE, ROB ROY, HAMISH FIELDS - PRODUCTION HISTORY 15/11/2018 IVANHOE, ROB ROY, HAMISH FIELDS - PRODUCTION HISTORY On stream 1989 Original reserves at start-up = 88 mmbls Original field life 10 years Projected field life extended several times Projected end of field life 2006 Current reserves estimates 187 mmbbl Aquifer support + Water injection + Gas lift The fields have always “over performed”

IVANHOE, ROB ROY, HAMISH FIELDS - GAS LIFT SYSTEM 15/11/2018 IVANHOE, ROB ROY, HAMISH FIELDS - GAS LIFT SYSTEM Gas lift type & description: Continuous gas lift (gas is injected at a constant rate into the tubing) There is a common gas lift line into each subsea manifold, it is fitted with pressure & temperature transmitters located upstream the gas lift subsea choke. Gas lift Characteristics: A system of subsea wellhead transmitters, each subsea wellhead is fitted with a flow transmitter, pressure & temperature transmitters, they can be interrogated in real time. There is also at a gas lift choke at each individual wellhead.

IVANHOE, ROBROY, HAMISH FIELDS - GAS LIFT SYSTEM 15/11/2018 IVANHOE, ROBROY, HAMISH FIELDS - GAS LIFT SYSTEM Why should we care about gas lift optimisation? Have a look at the production pie in IVRRH

IVANHOE, ROBROY, HAMISH FIELDS - GAS LIFT SYSTEM 15/11/2018 IVANHOE, ROBROY, HAMISH FIELDS - GAS LIFT SYSTEM Gas lift contribution to overall production has increased from 40% at the beginning of last year to the current 55% . This percentage was reduced to approximately 40% after the well intervention in IJ57 (re-perforations) and the new well drilled last year. It has increased again and will continue as the fields mature and water cut levels increase.

IVANHOE, ROBROY, HAMISH FIELDS - GAS LIFT SYSTEM 15/11/2018 IVANHOE, ROBROY, HAMISH FIELDS - GAS LIFT SYSTEM One key aspect of a gas lift system is the interaction between wells in the gathering network as back-pressure from additional gas in the flowline adversely affects production from all the other connected wells. The ‘optimal’ gas lift injection rate generally determined from a single-well analysis method has limited validity in analysing a production network of gas lifted wells. The oil production loss due to back-pressure effect in IVRRH gas lift system was estimated to be approximately 1,000 bbls/d. Therefore the need for a system approach to gas lift allocation optimisation based on a model that would optimise field-wide gas lift allocation.

IVANHOE, ROBROY, HAMISH FIELDS - GAP MODELLING 15/11/2018 IVANHOE, ROBROY, HAMISH FIELDS - GAP MODELLING GAP is a network analysis program that models the production gathering network from sandface through to the separator(s). The production system is simplified by combining the responses at each node until the entire system is represented by a single optimised performance curve

IVANHOE, ROBROY, HAMISH FIELDS - GAP MODELLING 15/11/2018 IVANHOE, ROBROY, HAMISH FIELDS - GAP MODELLING Define system components: tank or reservoir, wells, joints, pipelines, separators... Draw the system schematic: graphically link components, e.g. pipeline connections

IVANHOE, ROBROY, HAMISH FIELDS - GAP MODELLING 15/11/2018 IVANHOE, ROBROY, HAMISH FIELDS - GAP MODELLING

IVANHOE, ROBROY, HAMISH FIELDS - GAP MODELLING 15/11/2018 IVANHOE, ROBROY, HAMISH FIELDS - GAP MODELLING Generate & validate well performance: An automatic procedure allows GAP to control Prosper for generation of lift curve solutions. Allocate lift gas: It is the calculation procedure used to assign gas to gas lifted wells and calculate production rates and pressures throughout the system. Production optimisation: It consists of finding the optimum volume of lift gas to inject to each well. GAP allocates gas increments until all gas is allocated or maximum production is achieved.

IVANHOE, ROBROY, HAMISH FIELDS - GAP MODELLING 15/11/2018 IVANHOE, ROBROY, HAMISH FIELDS - GAP MODELLING Gap uses three methods of optimisation: Production: This option maximises the oil production rate, and GAP calculates the maximum rate that can be achieved for a specified volume of lift gas available. Revenues: This option optimises the revenues generated by sales of oil & gas produced after taking into account the costs of processing water and injection gas. Start-up scenario: This option optimises the amount of free gas produced, it will be used to rank wells in order of gas production in situations of limited lift gas supply.

IVANHOE, ROBROY, HAMISH FIELDS - GAP MODELLING 15/11/2018 IVANHOE, ROBROY, HAMISH FIELDS - GAP MODELLING Once the system is defined (all wells with valid IPR & VLP data and all pipelines calibrated), the model solves the network system for pressure and rates at various nodes by either: Network Solver option: It finds pressure and flow distributions in the network given fixed separator pressures. The gas allocation is set manually to each well and the model performs network calculations Network Optimiser option: It optimises the returns of oil produced, revenues or gas produced. Let the model calculate the optimum amount of gas injected to each well to maximise production

IVANHOE, ROBROY, HAMISH FIELDS - GAP MODELLING 15/11/2018 IVANHOE, ROBROY, HAMISH FIELDS - GAP MODELLING ############################################ # RESULTS - SUMMARY REPORT FOR ALL WELLS # System : IVRRH Production System Schematic System type : Production Optimisation Method : Production Pipeline prediction : Pressure and temperature Gas Available : 28.00 MMscf/day Gas injected : 24.88 MMscf/day Oil produced : 7924.46 STB/day Gas produced : 3.47 MMscf/day Water produced : 44432.25 STB/day Liquid produced : 52356.72 STB/day Name Oil Produced STB/day --------------- ----------- 57 3184.35 28 1367.95 31 703.44 24 666.84 40 78.20 27 1189.83 32 0.47 25 733.40 +++++++++++++++++++ + End of report +

IVANHOE, ROBROY, HAMISH FIELDS - GAP MODELLING 15/11/2018 IVANHOE, ROBROY, HAMISH FIELDS - GAP MODELLING ############################################ # RESULTS - SUMMARY REPORT FOR ALL WELLS # System : IVRRH Production System Schematic System type : Production Optimisation Method : Production Pipeline prediction : Pressure and temperature Gas Available : 28.00 MMscf/day Gas injected : 28.00 MMscf/day Oil produced : 8481.35 STB/day Gas produced : 3.57 MMscf/day Water produced : 45987.56 STB/day Liquid produced : 54468.90 STB/day Name Oil Produced STB/day --------------- ----------- 57 3997.98 28 852.86 31 1014.03 24 565.47 40 47.33 27 1240.50 32 152.31 25 610.87 +++++++++++++++++++ + End of report +

IVANHOE, ROBROY, HAMISH FIELDS - GAP MODELLING 15/11/2018 IVANHOE, ROBROY, HAMISH FIELDS - GAP MODELLING ############################################ # RESULTS - SUMMARY REPORT FOR ALL WELLS # System : IVRRH Production System Schematic System type : Production Optimisation Method : Production Pipeline prediction : Pressure and temperature Gas Available : 28.00 MMscf/day Gas injected : 28.00 MMscf/day Oil produced : 8836.45 STB/day Gas produced : 3.67 MMscf/day Water produced : 44688.90 STB/day Liquid produced : 53525.36 STB/day Name Oil Produced STB/day --------------- ----------- 57 4393.70 28 883.16 31 1092.68 24 575.84 27 1286.52 25 604.55 +++++++++++++++++++ + End of report +

IVANHOE, ROBROY, HAMISH FIELDS - GAP MODELLING 15/11/2018 IVANHOE, ROBROY, HAMISH FIELDS - GAP MODELLING ##################################### # RESULTS - SYSTEM SUMMARY REPORT # System : IVRRH Production System Schematic System type : Production Optimisation Method : Production Pipeline prediction : Pressure and temperature Gas Gas Oil Gas Water Oil Gas Revenue available injected Produced Produced Produced Gravity Gravity Generated MMscf/day MMscf/day STB/day MMscf/day STB/day API sp. gravMM US doll --------- --------- --------- --------- --------- --------- --------- --------- 0.00 0.00 5592.77 2.56 21791.55 33.7111 0.84 10.00 10.00 8391.19 3.48 36723.60 33.3662 0.82 15.00 11.66 8282.83 3.49 36670.50 33.3107 0.82 20.00 20.00 8706.09 3.56 42932.99 33.5149 0.81 25.00 25.00 8888.47 3.66 44481.04 33.5079 0.81 30.00 30.00 8769.06 3.65 44939.06 33.4983 0.81 35.00 30.42 8710.91 3.67 44505.83 33.4987 0.81 +++++++++++++++++++ + End of report +

IVANHOE, ROBROY, HAMISH FIELDS - GAP MODELLING 15/11/2018 IVANHOE, ROBROY, HAMISH FIELDS - GAP MODELLING The incremental net oil production due to gas lift gas allocation optimisation is estimated at 6% of the total production, this is approximately equivalent to 400 bbls/d. The modelling of gas lift gas allocation on a field-wide basis has allowed us to better understand and reduce the adverse back-pressure effects within the flowlines. This has accelerated cash flow and generated profit estimated at US $ 2.5 millions for year 2001. 306 days x 400 bbl/d x 0.85 (production uptime) = 104,000 bbls/year 104,000 x 24 $/bbl = US $ 2.5 millions

GAS LIFT PRODUCTION SYSTEM MODELLING - THE FUTURE 15/11/2018 GAS LIFT PRODUCTION SYSTEM MODELLING - THE FUTURE As This example shows, a field-wide gas lift allocation optimisation can contribute to maximise the value of marginal and mature fields up to 10% gain in oil production, accelerate cash flow and generate profit sooner.

GAS LIFT PRODUCTION SYSTEM MODELLING - THE FUTURE 15/11/2018 GAS LIFT PRODUCTION SYSTEM MODELLING - THE FUTURE The key to gas lift optimisation modelling is predicting the effects of changes, the gas lift optimisation should always be a proactive and continuing monitoring process ( it is to do with being effective. Effectiveness as doing the right thing, e.g. have a reliable simulation model…) Once the monitoring process is predictable, the gas lift gas allocation model becomes a production optimisation tool ( it is to do with being efficient. Efficiency as being better in what we do: optimise production…)