Characteristics of Regional Power Markets

Slides:



Advertisements
Similar presentations
Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
Advertisements

The Regulatory Assistance Project 177 Water St. Gardiner, Maine USA Tel: Fax: State Street, Suite 3 Montpelier, Vermont.
NARUC-FERC Demand Response Collaborative Meeting NARUC Fall Meeting Anaheim, CA T. Graham Edwards President & CEO November 11, 2007.
CREE Site Visit Oslo, September 19, 2013 Who Should Pay for Transmission? Nils-Henrik M. von der Fehr.
John B. Wharton, PE Technical Executive Baltimore, Maryland October 16, 2013 Perspectives on Grid-Integrated Microgrids Maryland Clean Energy Summit.
Midwest Demand Response Initiative Kick-off Meeting Bob Lieberman, Commissioner, Illinois Commerce Commission John Norris, Chairman Iowa Utilities Board.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Electric Restructuring- Experience in other states.
SEPTEMBER 29, 2014 | CONCORD, NH Eric Johnson DIRECTOR, EXTERNAL AFFAIRS New Hampshire Energy Summit Lessons Learned from Winter 2014 and How the ISO Is.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
Energy Production and Use in California Source: California Energy Commission
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
Henwood Consulting What’s Up ? California Electric Generation Markets Gary L. Hunt Managing Director.
1 Reforming the Energy Vision (REV) “Utility of the Future” Tom Mimnagh Consolidated Edison Co of New York New York Energy Week April 23, 2015.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
Demand Response in Midwest ISO Markets February 17, 2008.
FERC Assessment of Demand Response & Advanced Metering 2006 APPA Business & Financial Conference September 18, 2006 – Session 11 (PMA) Presented by: Larry.
Power Plant BI POWER GENERATION Evolution of Plant Ownership From Regulated Era Regulated Utility Monopolies To “Partially” Deregulated Era Independent.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
Overview of Distributed Generation Applications June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
Wholesale Electricity Market – Western Australia APEx Conference 2008 – Sydney Allan Dawson 13 October 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Smart Grid Workforce Education Presentation Smart Grid – A Framework for Change Brad Gaskill, CEO - Poudre Valley REA May 29, 2009.
Energy Security Powered by Microgrid Infrastructure Presented By: Colin Kelly Principal Distributed Energy Development Improving energy infrastructure.
Transmission Issues & Renewables Perspectives of a Wind Developer.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
AES NewEnergy To The Institute For Regulatory Policy Studies May 18, 2000 By David L. Townley.
The Wholesale Market Subcommittee Update Prepared for the July 31st TAC meeting.
DER Provide Grid Services for the 21 st Century Electric System Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy More Than Smart Conference.
May 4, 2001 Maryland PSC Summer Reliability Assessment Allegheny Power May 4, 2001.
1 PLANNING CONFERENCE ON MARYLAND’S ENERGY FUTURE WILLIAM GAUSMAN VICE PRESIDENT ASSET MANAGEMENT JULY 25 – 26, 2007.
Estimating the resource adequacy value of demand response in the German electricity market Hamid Aghaie Research Scientist in Energy Economics, AIT Austrian.
Wind Project Ownership - An Investor Owned Utility Perspective John R
IAAE International Conference Singapore June 18-21, 2017
Asia-Pacific Energy Regulatory Forum
Integrated Planning of Transmission and Distribution Systems
Wind Project Ownership - An Investor Owned Utility Perspective John R
Regional Transmission Organizations
Development of an Integrated Energy Market in Saudi Arabia
Building a Sustainable Energy Future
Smart Grid Developments in Alberta
Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy
Massachusetts Electric Restructuring Roundtable
THE STRATEGY OF INTERNATIONAL BUSINESS
Strategies of Reliable Transmission of Energy In A Competitive Market
EV charging – a grid perspective
Rate-of-Return Regulation
NASUCA Mid Year Meeting Gas Reliability
October 9, 2014 Kenneth W. Yagelski Managing Director Gas Supply
Alison Silverstein PJM Energy Policy Roundtable November 28, 2017
New England Resource Adequacy
إدارة التسويق.
Long-term Capacity Market
EVP, Chief Administrative Officer
Assessing Market Barriers to Distributed Generation
Infrastructure Needs and Our Electric Grid for the 21st Century
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Planning Reserve Margin
Wholesale Electricity Costs
Supplemental Project Planning Process Under Order 890 Within PJM
Making Green Tariffs Work for Your Customers
Comments on New England Regional State Committee*
Commissioner Anne C. George
Will Electric Vehicle adoption end in Grid Lock?
The Future Grid and Energy Storage
Putting Duct Tape on North America’s Last Energy-Only Market: ERCOT
Presentation transcript:

Characteristics of Regional Power Markets June 16, 2003 Harrisburg, PA Website: http://www.raponline.org

Market Issues Regional Power Markets – Some Concerns Market power Price spikes Resource adequacy Locational differences Long-range market efficiency System Planning and Expansion, including distribution system issues and challenges for the future (environment, diversity, other public interests.) Security and Reliability

Distributed Energy Resources DER is part of the big picture of electric utility investment DER can solve/prevent system problems State regulation, wholesale regulation, and wholesale markets can be organized to make the most of DER DER happens at the retail level Recognizing value

DER Values Values of distributed energy resources Reduced volatility Reduced costs running cost Reduced investment cost (if credit is allowed) Improved environment Cleaner than average (need to assess local margin) Back out spinning reserve Delay large asset construction (technology may provide better “big system” solutions later) Improved security Wouldn’t it be nice if a system operator could operate the same market, with the same loads and the same generators, year after year. The system would have its random influences of weather and forced outages. But the key forcing function of reliability concerns is sales and demand growth, and the faster the growth, the more difficult the system operator’s task, and the more volatile the market becomes.

Value Disconnect Who will compensate the distributed generator for providing these values? There are free-riders

Considerations Market Power – Needs active demand side Price Spikes – Promoted by demand growth Capacity – Customer resources may cost less and be less intrusive Improve energy – environment connection Efficiency – Regulation can help direct capital to most valuable investments Need a regional perspective to attract customer resources beyond those that emerge from state regulation. Is that the ISO/RTO? Does a Multi-state Entity need to cast public interest influence on the market? And can this influence really direct investment to high value places in the market? Can customer resources be regional resources?

The Market Value of Price-Responsive Load

Source: Optimal Energy

System Security Not too distinct from storms and failures New contingencies Resilient Network Single facilities vulnerable Assure minimal effect on customers in the event a facility is taken out DER serves local loads Lighter system loads than would otherwise exist reduces vulnerability