GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Advertisements

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 5 of 12 Subsystem Acceptance 1 GLAST Large Area Telescope Pre-Environmental.
GLAST LAT ProjectLAT Face to Face, July 17-18, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
1 GLAST LAT ACD FTF 3/17/05 GLAST Large Area Telescope: Face to Face Meeting March 17, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: David J.
GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT Project – Cost and Schedule ReviewNovember 3, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review November 3, 2004.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Martin Nordby Stanford Linear Accelerator Center Stanford University.
GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 1 GLAST Large Area Telescope: ACD Integration & Test Jim La/ACD I&T Lead.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 17, 2004 AntiCoincidnce Detector 1 GLAST Large Area Telescope: Face to Face Meeting November 17, 2004 AntiCoincidence Detector.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
GLAST Large Area Telescope:
GLAST LAT ProjectSept 3, 2003 AntiCoincidnce Detector 1 GLAST Large Area Telescope: Planning Meeting September 3, 2003 AntiCoincidence Detector (ACD) Subsystem.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Overview.
GLAST LAT Project CAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 1 Presentation 1 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review W.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST Large Area Telescope:
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Mechanical Integration
Gamma-ray Large Area Space Telescope ACD Final Performance
GLAST Large Area Telescope:
Gamma-ray Large Area Space Telescope
0.0 Instrument Suite Name Presenter’s name
Peer Review Agenda (Suggested).
7E: Tower test plans GLAST Large Area Telescope: Tracker Subsystem
Integration, Test, and Calibration
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope
GLAST Large Area Telescope:
Thermal Vacuum Test: Plans and Procedures
Integration and Test Organization Chart
Mechanical/Thermal Systems
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope: Jonathan Ormes / Rudolph Larsen
GLAST Large Area Telescope:
GLAST LAT System Engineering
Integration and Test Organization Chart
March ’05 Face to Face Meeting Introduction
Introduction and Overview
GLAST Large Area Telescope:
XRN4361 – UK Link Release 2 - Delivery
Overview Cost to Complete
GLAST Large Area Telescope:
Presentation transcript:

GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 David J. Thompson Thomas E. Johnson NASA Goddard Space Flight Center Subsystem Manager/Instrument Manager David.J.Thompson@nasa.gov Thomas.E.Johnson@nasa.gov

SIGNIFICANT ACCOMPLISHMENTS Completed Thermal Vacuum testing Lowering the ACD over the Tracker thermal simulator (required to drive the temperature of the ACD) Installed in Facility 225

SIGNIFICANT ACCOMPLISHMENTS Successfully completed Mass Property testing Mass and Center of Gravity within allocation Installed on the Mass Property Measurement Facility

SIGNIFICANT ACCOMPLISHMENTS ACD Team Photo - August 9, 2005

ACD Delivery to LAT

Near Term Milestones Vibration Acoustics Mass Properties PSR Shipping Milestone Description Date New Date Status/Notes ACD PER 5/24/05 6/8/05 (Act) COMPLETE Efficiency Verification Test 6/3/05 6/16/05 7/8/05 Thermal Vacuum 6/15/05 6/27/05 7/19-28/05 7/19-8/1 MMS/TB Installation 6/17/05 6/29/05 Vibration 6/23/05 7/11-14/05 Acoustics 7/15-18/05 7/18/05 Mass Properties 8/2-3 8/7 PSR 8/8 Shipping 8/9-12 8/10-13

ACD - Schedule Flow (as of 6/22) 10/4 – 2/5/05 2/7 - 2/15 Qual Electronics Chassis Environmental Test 1st flight chassis Environmental Acceptance Test (8d) The remaining Seven Flight Chassis Environmental Acceptance tests (25d) Delay due to EGSE Issues 5/1 – 6/7 6/10/04 – 1/28/05 2/15 – 2/22 2/28 – 5/10 Assemble last 2 rows of TDAs & WSF (124-130, 224-230, 324-330, 424-430) onto TSA Initial TDA/TSA I&T in B7 Install & test 1st flight Chassis onto ACD Install & test remaining flight Chassis onto ACD 6/29 – 7/8 6/8 7/11 – 7/14 7/9 6/22 – 6/27 6/7 ACD Subsystem Efficiency Verification test (include rotate ACD 90 degree)(10d) 6/28 > 6/27 actual Vibration Test (4d) Install Thermal Blanket (1d) ACD Integration complete MMS Install (1d) ACD Full Functional Test(5d) Pre- Environmental Review (PER) Was 7/19 – 7/28 Now 7/19 – 8/1 Was 8/1 – 8/2 Now 8/8 Was 8/3 -8/8 Now 8/9 – 8/12 Was 8/8 – 8/12 Now 8/13 – 8/17 7/15 – 7/18 Was 7/29 – 7/30 Now 8/2 – 8/3 Was 8/12 Now 8/17 Acoustic Test (3d) Thermal-Vac Test (10cd) Mass Properties (2d) Pre-ship Review (PSR) ACD ship to SLAC (5d) Post ship Check out (5d) ACD RFI

ACD Problem /Failure Report Status 4 PR’s open 3 open and provided to LAT for tracking at the LAT level 1 ready for closure (thermistor anomaly) 2 PFR’s are open Inside thermistor wire stay clear - Green, ready to close Inside base frame stay clear – CR prepared. Outside stay-clear violation CR in the works

Level 3 Milestone List

Milestone Variance Explanation All milestones completed as of 8/23/2005

Cost Report

Cost Variance Explanation Why overrun/underrun? Lag in accruals and invoicing. What will be done to correct? CR for $361K approved in August. Should be sufficient to close out work on ACD. Closing out all tasks and contracts. Only remaining cost risks are the chargebacks (i.e. for testing and fabrication support).

FTE Report (DOE/NASA-funded only)

FTE Variance Explanation Why overrun/underrun? Additional work. Closing out paperwork and issues. Schedule delay. What is the impact? Cost. What will be done to correct? Delivered ACD! Moving people off of project.