Preparations for a Lehman Review

Slides:



Advertisements
Similar presentations
Preparing for the CD-2 Review Elton Smith Hall D Collaboration Meeting October 12-14, 2006.
Advertisements

PROJECT RISK MANAGEMENT
Executive Session Director’s CD-1 Follow-Up Review of the APUL Project November 2-3, 2009 Dean A. Hoffer.
DOE/NSF U.S. CMS Operations Program Review Closeout Report Fermi National Accelerator Laboratory March 10, 2015 Anadi Canepa, TRIUMF Anna Goussiou, University.
Systems Engineering Management
RF Cavity / Coupling Coil Module
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
© Mahindra Satyam 2009 Project Metrics QMS Training.
Fermilab Implementation of DOE Critical Decision Process FRA Project Management System Presentation by L Edward Temple Jr Head, Office of Project Management.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
7/26/2006 Wyatt Merritt 1 DECam Preparations for Critical Decision 2/3a Preparations for CD2 Preparations for CD3a DECam MOUs.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
JLab preparations for upgrade, FY05 budget Elton Smith Hall D Collaboration Meeting May 20-22, 2004.
12 GeV Upgrade Project Status Allison Lung Hall C Users Meeting Jefferson Lab January 18, 2008.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
W.J. Foyt LUSI DOE Review July 23, 2007 Project Management 1 Project Management W. J. Foyt Project Scope Timeline Cost Estimate.
Light Source Reviews The BES Perspective July 23, 2002 Pedro A. Montano Materials Sciences and Engineering Basic Energy Sciences BASIC ENERGY SCIENCES.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
Hall D Electronics Review (July 23-24) Elton Smith Hall D Collaboration Meeting August 4-6.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
10/25/2007GlueX Collaboration Meeting1 October 25-27, 2007 Jefferson Lab This is approximately our 20’th such meeting.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Budget Status and FY03 Requests Elton Smith Hall D Collaboration Meeting Sep 12-14, 2002.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Project X Working Group Meeting January 15, :00 PM Snake Pit.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
Costing review Extract from slide of Philippe: The Panel was impressed by the quality of the presentations and degree of detail to which the value.
Budget Outlook Glen Crawford P5 Meeting Sep
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
Project X Collaboration Plan Steve Holmes Accelerator Advisory Committee Meeting May 6-8, 2008.
1 Ventilation Systems Capital Asset Projects Safety Significant Confinement Ventilation System (15-D-411) Exhaust Shaft (15-D-412) Ronald.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
Budget Status and FY04 Requests Elton Smith Hall D Collaboration Meeting Dec 11-13, 2003.
OFFICE OF SCIENCE Closeout Report by the Review Committee for the LHC-CMS Detector Upgrade Project Fermi National Accelerator Laboratory August 27, 2013.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
DOE Review of LARP – Feb 17-18, 2014 DOE Critical Decision Process Ruben Carcagno February 17,
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
Workshop Goals and Project Management “120A ” – FY15 Budget Request Steve Holmes PIP-II Budget Retreat July 22, 2014.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
CMS HL-LHC Detector Upgrades Project Planning Workshop, 26th – 30th Sept 2016, Fermilab Lucas Taylor Associate PM (for Cost, Schedule, Risk) Overview and.
Camera PDR/CD1 Planning 19 September 2008
SCT Project Management Issues
Head, Office of Project Management Oversight (OPMO)
CLIC work program and milestones
Project Management W. J. Foyt
ISA 201 Intermediate Information Systems Acquisition
East Hall under construction
Strength Through Science
Project Management – Part II
STEP 7 - EXECUTION PHASE: MONITORING & CONTROLING
Status, Misc Elton Smith Feb 21, 2003.
Risk Management Process (Revised)
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Conventional Facilities (WBS 1
Project Management Issues John N. Galayda, SLAC April 24, 2002
Fermi Lab – 2019 CMB-S4 Workshop
Linac Coherent Light Source (LCLS)
Preliminary Project Execution Plan
Conventional Facilities
LCLS Instrument MIE Project: Staffing, Schedule
Detector Proto-Technical board Sep 30, 2010
Presentation transcript:

Preparations for a Lehman Review Elton Smith Hall D Collaboration Meeting Dec 11-13, 2003

Project acquisition process and CDs DOE Order 413.3 (Initiated by the Office of the Chief Financial Officer)

Project phases and federal budget BR=Budget Request, PED=Project and Engineering Design Funds

Change Requests for G0 Experiment Cost Schedule Performance Approval 1 Minor, within WBS line item (<$5K or 1%) “float” No impact Subsystem manager 2 Within subsystem contingency allocation (>$5k or 1%) < 1 Quarter delay of milestone Sub-system change not affecting subsystem performance or scope Above plus Project manager and Spokesperson 3 Within overall G0 contingency (>$100k or 10%) > 1 Quarter delay of milestone Subsystem change affecting subsystem performance but not G0 performance Above plus L. Cardman and Executive Committee 4 > 1 Quarter delay of major project milestone Technical scope change, affects experiment capability Above plus Agencies

“Lehman” review gives CD-1 approval Review of entire 12-GeV project Cost Schedule Technical scope Prerequisites Acquisition plan CDR Preliminary project execution plan and baseline range Project data sheet for design Verification of mission need Preliminary hazard analysis report

Practically, CD-1 is an approval of CDR pCDR + section on accelerator + cost and schedule book Best preparation are the subsystem reviews that we are undertaking Cost and schedule will have to be covered (perhaps at a later stage)

BABAR Conceptual Design Review Combined a requirements review with their conceptual review Level for conceptual design was one level below a “module” WBS and preliminary cost estimate Interface document to other systems Grounding and shielding plan Report of the Electronics Review

Are there any major items missing in the R&D list Are there any major items missing in the R&D list? Is the priority given to each appropriate? It is critical that the choices made in the readout architecture reflect requirements imposed by the physics and detector choices. Balance priority between design and prototyping Report of the Electronics Review

A guess at the process Assess costs and schedule of 12-GeV upgrade project Adjust cost of project (accelerator and 4 halls) if “outside the box” Review scope in light of cost envelop Process will include PAC, similar to pCDR review Not clear at which point we will need to “de-scope” Conduct an internally commissioned review of project Based on outcome, schedule the DOE (Lehman) review of project

Impact of budget profile on schedule Fiscal years 02 03 04 05 06 07 01 Constant-effort budget in FY02* & O413.3 08 09 *Assumes increases beyond constant-effort in subsequent years. Constant-effort budget continues thru FY03* 10 Orig. schedule CD-0 CD-1 CD-4 CD-2 CD-3

Lab resources after CD-0 Assignment of Budget Current staff Determine the speed with which CD-1 can be achieved

Manpower (JLab)