Climate and biodiversity projects in Belarus and Ukraine: Re-wetting degraded peatlands Dr Zbigniew Karpowicz.

Slides:



Advertisements
Similar presentations
1 On-line resource materials for policy making Ex-Ante Carbon-balance Tool Food and Agriculture Organization of the United Nations, FAO Learning how using.
Advertisements

PRESENTATION OUTLINE Introduction Climate change initiatives Capacity Challenges.
GEF PROJECT TEMPLATES ANDGUIDELINES George Manful (PhD) Senior Task Manager, Climate Change UNEP UNFCCC Asia and Pacific Regional Workshop on Preparing.
Katoomba Group Training Initiative Climate Change, Markets and Services Welcome and Introduction Course Introduction and Guidelines Participant Introduction:
Francesca Romanin Jacur Milan University
GREEN BUILDING.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
IPCC Expert Meeting on HWP, Wetlands and Soil N 2 O Geneva, October 2010.
CEEWEB Academy III Strengthening civil participation in the implementation of EU nature conservation directives through the experiences gained by the 10.
Energy efficiency measures in the public building sector: the DEEP project Freiburg, 14 June 2007 Philipp Tepper Sustainable Procurement ICLEI - Local.
Wetlands International, Susanna Tol,
A. N. Gichu Kenya Forest Service REDD+ and REDD Readiness.
# Greenhouse gas reductions Michael Kvetny COWI 11 May Economics.
Climate Change and CDM in Thailand
Challenges and perspectives Wetland Management Susanna Tol – Wetlands International HQ.
MENA-OECD Investment Programme Draft Policy Considerations on Incentives Working Group 3 Meeting Cairo, Egypt 6-7 September 2006.
Challenges and options John Couwenberg Hans Joosten Greifswald University Are emission reductions from peatlands MRV-able.
JOINT IMPLEMENTATION MECHANISM IN BULGARIA J I MINISTRY OF ENVIRONMENT AND WATER 26 May 2004 Daniela Stoycheva – National Focal Point on CC, BULGARIA.
Implementation of Global Action Plan for Peatlands and Ramsar CC GAP future Wise Use of Peatlands Schiphol February, 2009.
Dr. I.Purica Ministry of Environment Romania Kyoto Protocol and its implementation in Romania.
Country Support Program, Istanbul, April 2010 UNDP-GEF PORTFOLIO IN BIODIVERSITY IN EUROPE AND CIS © 2010 UNDP. All Rights Reserved Worldwide. Proprietary.
FINANCING REDD – A CRITICAL EVALUATION OF THE REDD MECHANISM Patricia Blazey and Hope Ashiabor Patricia Blazey and Hope Ashiabor 1.
Green Investment Scheme in Bulgaria Christo Christov, Energy Institute, Bulgaria Workshop Facilitation Green Investment Scheme: first lessons learnt and.
Peatland Forest Degradation and Emissions in South East Asia Faizal Parish Global Environment Centre Marcel Silvius, Wetlands International Forest Day.
The Danish JI Program UNFCCC Workshop on the Implementation of Article 6 projects under the Kyoto Protocol Moscow, May 2004 by Ulla Blatt Bendtsen,
Kyrgyzstan priorities in environment protection B. Tolongutov, Director, State Regulation Center on Environment Protection & Ecological Safety Sector State.
GIS Development in Romania Vlad Trusca Head of Climate Change Unit Ministry of Environment and Sustainable Development “REC Workshop “Facilitating GIS:
Dr. Harri Vasander - UNIHEL RESTORATION OF TROPICAL PEATLANDS – THE GREATEST CHALLENGE FOR SUSTAINABLE DEVELOPMENT EU INCO-DEV STRAPEAT PROJECT STRATEGIES.
“STEWARDSHIP IN FORESTRY” Forestry Projects for Terrestrial Sequestration -- Regulatory and Public Acceptance Issues -- Jim Cathcart, Ph.D. Oregon Department.
Leveraging Carbon Offsets for Water Quality in the Deschutes Basin, Oregon Scott McCaulou, Deschutes Resources Conservancy Michael Ashford, The Climate.
Presentation “Green Investment Schemes – greenhouse gas emissions quotas trading mechanisms in Ukraine according to the Kyoto Protocol to the Convention.
United Nations Climate Change Conference in Copenhagen - COP 15 Restoring degraded peatlands to achieve GHG emission reductions Viktar Fenchuk Irina Voitekhovich.
Towards a VCS AFOLU standard for Peatland Rewetting and Conservation Igino.
14 November 2006 UNFCCC Side Event, COP/MOP, Nairobi Development and Implementation of a JI Track 2 project Manfred Stockmayer Director Camco International.
July 3 – 4, 2003, Szentendre Dr. Valdemars Scerbaks MSc Peteris Blumats.
Standardized national/sectoral baselines UNFCCC Technical Workshop on Joint Implementation Bonn, 16 October 2007 Manfred Stockmayer Managing Director Camco.
R-PLAN and REDD activities Review Lao PDR Flag of your country.
A role for the Wetland Convention in Wetland Restoration in Wetland Restoration Christopher Briggs Secretary General of the Ramsar Convention on Wetlands.
EU LIFE programme Bringing peatlands back to life João Pedro e Silva LIFE Nature & Biodiversity expert Neemo - Aeidl Athlone -29th September 2015.
KfW Carbon Fund From PoA to NAMA Barcelona 31th of May 2011.
Mitigation The potential to use protected areas in carbon storage and capture.
BioEnergy Sustaining The Future 2 BESTF2 Briefing Event 11 th December 2013 Dr Megan Cooper, BESTF co-ordinator.
A Brief History of REDD + Regional REDD+ Coordination Unit Tigray Regional State,Mekelle Sep 3 & 4/2015 MINISTRY OF ENVIRONMENT AND FOREST NATIONAL REDD+
About National Ecological Centre of Ukraine National Ecological Centre of Ukraine (NECU) is a non-governmental not-for-profit organization created in.
Sellers’ strategies regarding Joint Implementation Company Perspective
NATIONAL FORESTRY AUTHORITY
COLLABORATION WITH JRC WITH SPECIAL EMPHASIZE ON RIS3
Baltic Sea Conservation Foundation
MINISTRY OF ECOLOGY AND NATURAL RESOURCES OF UKRAINE
Mitigation Targets and Actions under Sierra Leone’s NDC
UNFCCC Cop 21 Paris Experiences on implementation of ecosystem-based approaches to climate change mitigation in peatlands Rio Conventions.
GEF Expanded Constituency Workshop
MINISTRY OF ECOLOGY AND NATURAL RESOURCES OF UKRAINE
UNFCCC Technical Workshop on Joint Implementation
APEC 21st Century Renewable Energy Development Initiative
Are emission reductions from peatlands MRV-able
UNDP - Fortis MDG Carbon Facility
Kenya’s REDD+ Readiness Activities
THE POTENTIAL FOR CONSERVATION CONTRACTS TO CONTRIBUTE TO BIODIVERSITY CONSERVATION IN MADAGASCAR Joanna Durbin, Aristide Andrianarimisa, Philip Decosse,
Bruxelles, 3rd October 2012 LIFE11 NAT/IT/00044 GESTIRE
Results of Workshop Organized by
Kyoto Protocol.
DG Environment, Nature Protection Unit (D3)
When and how to best consider the provision of the Habitats directive
ESTABLISHING CONSERVATION MEASURES FOR NATURA 2000 SITES
Joint implementation and eligibility requirements
REDD+ Policy Overview Climate Protection Through Forest Conservation in the Pacific Islands Inception Workshop, November 2010 Suva, Fiji Dr Sean.
Biodiversity, Natura 2000 & Green Infrastructure in the Regional Policy Mathieu Fichter European Commission, DG Regio Team leader "sustainable.
Possibilities for promoting environmental protection projects
THE KYOTO PROTOCOL AND BEYOND: A LEGAL PERSPECTIVE, Siena June 10, 2006 The Clean Development Mechanism: Challenges and Opportunities Axel Michaelowa.
Presentation transcript:

Climate and biodiversity projects in Belarus and Ukraine: Re-wetting degraded peatlands Dr Zbigniew Karpowicz

Why peatlands? The already well-known facts: Peatlands are the most space effective stores of carbon In the boreal zone they contain seven times more carbon per ha than any other ecosystem Carbon is accumulated and stored as long as the peatland stays wet In Belarus, peatlands occupy 1,4 mln ha 50% of Belarusian peatlands were drained in 1950-1980 and drainage of peatlands leads to huge emissions

Yelnia raised bog Ramsar site Dziakuj / Thank you

Two projects 1. Belarus 2. Ukraine

Project overview In Belarus, with BirdLife partner APB: re-wetting 18,000 ha of degraded peatland (2008-2011); In Ukraine, with BirdLife partner USPB: re-wetting 20,000 ha of degraded peatland (2009-2012); Michael Succow Foundation, based in Germany, are a partner with key responsibility for the development of the GEST approach; Carbon experts from the Silvestrum Ltd, Emmer International, Climate Focus and Beyond Carbon are being contacted for specific tasks; Both projects seek to sell voluntary Carbon credits from the re- wetted areas, income that will be re-invested in the long-term management of sites to fund further restoration after the projects end

The 7-M approach Measuring CO2 equivalents – develop a methodology – the GEST method Making the VCU (Voluntary Carbon Units) Making the Rewetting Monetising of Rewetting Monitoring the Areas Managing the Areas Maximising the Approach

Measuring CO2 equivalents Greenhouse Gas Emission Site Types (GESTs) Synergy of vegetation and gas emissions to map/estimate the baseline emissions before rewetting and to monitor the emissions after rewetting

2. Making the VCU Avoidance model Joosten, Augustin, 2006 Avoidance model estimates GWP potential of natural and degraded mires (IMCG) links mire restoration with the amounts of avoided CO2-eq emissions

3 (i) Making the rewetting

3 (ii) Making the Rewetting Site selection according to desired specifications Maximize carbon Maximize biodiversity Compromise Other incentives

3 (iii) Making the Rewetting (procedure from Belarusian experience) Site selection according to desired specifications Work out the scientific baseline study Acquisition of rewetting permission (1 month) Development of engineering plan (3-5 months) Agreement of engineering plan by Ministry of Nature Resources (1 month) Ecological expertise (3 months) Call for tender of construction work Implementation of engineering activities (3-5 months) Inspection and approval of construction work, transfer under authority of land manager Monitoring

3 (iv) Making the Rewetting Total rewetting procedure takes 1.5 years Costs depend on size of peatland & complexity of construction works Range between 15 – 150 €/ha pict. Provided by A. Kozulin

4 . Monetise the rewetting - Offering credits Offering the VCUs to potential investors: * EC and USA industrial concerns * commercial groups outside the ETS ie. 3% Group * Carbon brokers/traders Explore Green Investment Schemes Preparing for post-Kyoto Joint Implementation

5. Monitor the sites Site by site regular monitoring scheme (remote sensing) Documentation of changes in: Plant and bird species, water level stability Condition of dykes, sluices and other restoration devices Verification of conditions (aim to build-up a centralised database to store and analyse the revealed data): Biodiversity characteristics Physical characteristics

6. Manage the Areas: Benefits from the Re-wetting For conservation (biodiversity) For climate (maintenance of carbon equivalents reductions over time, prevention of fires) For community (employment and rural re-renewal: biomass production as an alternative to peat as an energy source) For capacity building (strengthening technical, scientific and NGOs)

Neighbouring countries: Ukraine and Russia 7. Maximize the approach Neighbouring countries: Ukraine and Russia Degraded peatlands Restored peatlands Carbon credits Restoration Avoidance model Restoration Management Voluntary market (now) Kyoto market (JI, post-2012) Trust fund PA scheme

Results Belarus: 8840 ha re-wetted as of 1st September 2010; Negotiations underway with potential first buyer of voluntary carbon credits; Ongoing biodiversity monitoring taking place to demonstrate benefits to birds and biodiversity; Emissions reductions gains of 3-6 tonnes CO2 equivalents per hectare/per annum from the re-wetted sites; Ukraine: Re-wetting will begin in early 2011, half of which (10,000 ha) will be within the existing protected areas network; Preparations for the creation by USPB of a Carbon Fund and a Land Fund that would rent, manage and financially maintain the rewetted sites; Operational and technical lessons learnt from the Belarus project will be transferred to the Ukraine project.

All pictures by: S.Koltovich/A.Osipovich Location: Grichino-Starobinskoje rewetted peat extraction site: 3 years after rewetting

All pictures by: S.Koltovich/A.Osipovich Location: Grichino-Starobinskoje rewetted peat extraction site: 3 years after rewetting

Zbigniew Karpowicz, Programme Coordinator (zbig.karpowicz@rspb.org.uk) Dziakuj / Thank you Zbigniew Karpowicz, Programme Coordinator (zbig.karpowicz@rspb.org.uk)