PROJECT RISK MANAGEMENT
Advertisements

Note: See the text itself for full citations. Information Technology Project Management, Seventh Edition.
Project Management Risk Management. Outline 1.Introduction 2.Definition of Risk 3.Tolerance of Risk 4.Definition of Risk Management 5.Certainty, Risk,
Project Management Gaafar 2007 / 1 This Presentation is uses information from PMBOK Guide 2000 Project Management Risk Management* Dr. Lotfi Gaafar.
Managing Risk: Turning the Titanic Into the Love Boat Kevin Lyday, CISSP, PMP, CIPP/G, CEA, etc. Associate Director, Information Resources, Office of Public.
Project Risk Management
Project Risk Management
Proprietary and confidential. © 2006 Perot Systems. All rights reserved. All registered trademarks are the property of their respective owners.
Chapter 11: Project Risk Management
Project Based Risk Management Defusing a potential ticking time bomb
Managing Project Risk.
Project Risk Management Risk Mitigation. Risk Management  The prime objective of risk management is to minimize the impact and probability of the occurrence.
Managing Project Risk.
Project Risk Management. Learning Objectives  Understand what risk is and the importance of good project risk management.  Identify project risks, describe.
Project Risk Management Presenter: Phil Harman, PMP Executive Director for ZCS Internal PMO and Enterprise Project Management (EPM) Practice Manager September.
Project Risk Management
PRM 702 Project Risk Management Lecture #28
Project Risk Management And Case study. Eng.Ahmed Ibrahim.
PMI Knowledge Areas Risk Management.
Project Risk Management Supplement. The Importance of Project Risk Management  Project risk management is the art and science of identifying, assigning,
Chapter 11: Project Risk Management
RISK MANAGEMENT PRESENTATION ASQ- GREATER HOUSTON SECTION 1405 Lila Carden, Ph.D., MBA, PMP University of Houston Instructional Associate Professor
Project Risk Management Mohammad A. Rob. The Importance of Project Risk Management Project risk management is the art and science of identifying, assigning,
BSBPMG407A Apply Risk Management Techniques 1 Apply Risk Management Techniques Project Risk Processes Part 2 C ertificate IV in Project Management
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
PMP, CAPM, PgMP, PMI-SP, PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services.
Quick Recap Monitoring and Controlling. Phases of Quality Assurance Acceptance sampling Process control Continuous improvement Inspection before/after.
Chapter 8 Managing Project Risk Copyright 2012 John Wiley & Sons, Inc. 8-1.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 11 Project Risk Management.
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 10 Risk Management Proactively managing the positive.
Project Management By: Dr Madhu Fernando Project Risk Management
IT Project Management, Third Edition Chapter 11 1 Chapter 6: Project Risk Management.
Risk Management in the Built Environment Qualitative and Quantitative Risk Management By Professor Simon Burtonshaw-Gunn – licensed under the Creative.
Project Management Learning Program 19 – 30 April 2010, Mekong Institute, Khon Kaen, Thailand Assumptions and Risk.
Advanced Project Management Project Risk Management Ghazala Amin.
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
PMP Study Guide Chapter 6: Risk Planning. Chapter 6 Risk Planning Planning for Risks Plan Risk Management Identifying Potential Risk Analyzing Risks Using.
SOFTWARE PROJECT MANAGEMENT
© 2008 Prentice Hall9-1 Introduction to Project Management Chapter 9 Managing Project Risk Information Systems Project Management: A Process and Team Approach,
 Define and recognize risk  Define the contents of a risk management plan  Conduct a risk identification and prioritization process  Define.
Introduction to Project Management Chapter 9 Managing Project Risk
Project Risk Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 3 rd Edition, Project Management.
PMP, CAPM, PgMP, PMI-SP, PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services.
Management & Development of Complex Projects Course Code MS Project Management Plan Risk Response Lecture # 28.
Project Risk Management Planning Division of Project Management November 2003.
BSBPMG508A Manage Project Risk Manage Project Risk Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG508A.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
GU, PMP preparatory Course, MODULE 10 1 MODULE 10 Project Risk Management (PMBOK® Chapter 11) Module Contents: Hot Topics Definitions Needed Inputs to.
First Solar Plane Flight 19/04/2013.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Managing Project Risk – A simplified approach Presented by : Damian Leonard.
 Define and recognize risk  Define the contents of a risk management plan  Conduct a risk identification and prioritization process  Define.
RISK MANAGEMENT PROCESS PREPARED BY: MUHAMMAD SULAIMAN
Chapter 8 Managing Project Risk.
Project Based Risk Management Defusing a potential ticking time bomb
Chapter 11: Project Risk Management
CHAPTER11 Project Risk Management
Project Risk Management
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
PROJECT RISK MANAGEMENT
The Importance of Project Risk Management
PMI North Area PMP Exam Study Group
Software Project Management (SPM)
Mumtaz Ali Rajput +92 – SOFTWARE PROJECTMANAGMENT Mumtaz Ali Rajput +92 –
Chapter#8:Project Risk Management Planning
Chapter 11 Risk Management
Project Risk Management
Chapter 11 Risk Management
Project Risk Management
Chapter#8:Project Risk Management Planning
Presentation transcript:

PMI North Area PMP Exam Study Group Risk Presentation Prepared by Denise Robertson 15 March 2003 Denise Robertson Information derived or quoted from from PMI, Mulcahy, and Look Glass Development's PMP Exam Prep Materials

Risk Management Processes Process I/O and Tools/Techniques emphasized on exam, so memorize them Memorize process in order: Risk Management Planning Risk Identification Qualitative Analysis Quantitative Analysis Risk Response Planning Risk Monitoring and Control Denise Robertson Information derived or quoted from from PMI, Mulcahy, and Look Glass Development's PMP Exam Prep Materials

Risk Concepts Risk tolerance Risk adverse Risk factors Probability Impact Range of possible outcomes Expected timing in project life cycle Denise Robertson Information derived or quoted from from PMI, Mulcahy, and Look Glass Development's PMP Exam Prep Materials

Unknowns Risks are also called “Unknowns” “Known Unknowns” are identified during Risk Management and are documented in the project plan Can be planned for with Risk Response “Unknown Unknowns” are unanticipated risks Cannot be planned for in advance Denise Robertson Information derived or quoted from from PMI, Mulcahy, and Look Glass Development's PMP Exam Prep Materials

Policy Level Organization’s Risk Management Policy on how to approach risk is now part of PMBOK Policy describes: Level of tolerance Level of acceptable risk Denise Robertson Information derived or quoted from from PMI, Mulcahy, and Look Glass Development's PMP Exam Prep Materials

Project Status 3 possible statuses: In Jeopardy Committed to Approved Denise Robertson Information derived or quoted from from PMI, Mulcahy, and Look Glass Development's PMP Exam Prep Materials

Risk Probability/Impact Matrix 2-D rating system that rates: Likelihood (probability) of a risk occurring between 0.0 and 1.0 or 100% certainty Impact of risk should it occur Impact scale can be Ordinal (ordered) Cardinal (assigned numeric values) Risk Score = Probability * Impact Denise Robertson Information derived or quoted from from PMI, Mulcahy, and Look Glass Development's PMP Exam Prep Materials

Evaluating Project Data for Use in Assessing Risk Assumption Testing Criteria: Stability of assumption Impact to project if assumption proves false Data Precision Ranking Accuracy Dependencies: Extent risk is understood Data available about risk Quality of data Reliability and integrity of data Denise Robertson Information derived or quoted from from PMI, Mulcahy, and Look Glass Development's PMP Exam Prep Materials

Monte Carlo Simulation Used in Quantitative Risk Analysis and Cost Analysis Evaluates the project, not the tasks, however: Provides probability of completing project on any specific day or for any specific task Provides probability of any task actually being on the critical path Provides percent probability that each task will be on critical path Takes into account path convergence Translates uncertainties into impacts to total project Can be used to assess cost and schedule impacts Results in probability distribution Denise Robertson Information derived or quoted from from PMI, Mulcahy, and Look Glass Development's PMP Exam Prep Materials

Decision Tree Analysis Quantitative Analysis Tool Diagram describes decision and probabilities associated with choices Determines aggressive or conservative route to highest Expected Monetary Value (EMV) Total of Probabilities * Consequences for a Choice Event = EMV Denise Robertson Information derived or quoted from from PMI, Mulcahy, and Look Glass Development's PMP Exam Prep Materials

Cost Reserve PMI recommends at least 10% Based on EMV: OR Based on EMV: Total of Probability * Risk Cost for all risks Remember risk can be negative or positive Denise Robertson Information derived or quoted from from PMI, Mulcahy, and Look Glass Development's PMP Exam Prep Materials

Risk Response Techniques Description Avoidance Changing project plan to eliminate risk or protect objectives from its impact Mitigation Reduces probability and/or consequences of adverse event to acceptable threshold Transference Shifting consequences of risk and ownership to a third party (Insurance is a form of transference.) Acceptance Project plan not changed to deal with risk. Project team unable to identify any other suitable strategy Denise Robertson Information derived or quoted from from PMI, Mulcahy, and Look Glass Development's PMP Exam Prep Materials

Residual and Secondary Risks Outputs from Risk Response Planning Residual Risks are those that remain after Avoidance, Transference, and Mitigation have been taken. Secondary Risks arise as a direct result of implementing a risk response Secondary risks should be identified and responses planned Denise Robertson Information derived or quoted from from PMI, Mulcahy, and Look Glass Development's PMP Exam Prep Materials