Project Management 101 Business Management.

Slides:



Advertisements
Similar presentations
Teaching Students Project Management Dr. Bill Oakes, EPICS Director Pamela Dexter, EPICS High School Coordinator 2011.
Advertisements

Project Management What is it? The management and control of a group of interrelated tasks required to be completed in an efficient and timely manner.
Having Fun with Gantt PERT &.
Chapter 10: Project Schedule Planning
Created by Monique Ellefson, VISTA Leader. Dec Iowa Campus Compact.
Importance of Project Schedules
Project Time Management
Masonry Bracing Life Safety Considerations During Construction of Masonry Walls.
Workshop-3 Gantt and Pert Chart.
Perimeters and Areas of Rectangles
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Chapter 6: Project Time Management
Appendix A Project Management: Process, Techniques, and Tools.
Project Management Seminar Unit #5 Prof. Christopher L. Howard.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Chapter 4: Project Cost Management
Project Management 101 Business Management.
Options for Adjusting an Impossible Project Schedule How to rework an impossible project schedule and meet a forced deadline.
Microsoft ® Office Project 2007 Training Linking Project tasks [Your company name] presents:
BELL RINGER What is the area of a regular decagon if its side length is 12 m and its apothem is 5m? Suppose the perimeter of some n-gon is 230 feet. If.
Project Management MLP, Careers & Employability Division.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Introducing Project Management Update December 2011.
Project Time Management
The roles and contracts within Live performance Kai. Oakley.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 10 Projects.
Copyright 2012 John Wiley & Sons, Inc. Chapter 3 The Project Manager.
Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Information Technology for Management Chapter 13: Project Management and SDLC Prepared by.
 Project Time Management includes the processes required to accomplish timely completion of the project  Part of Triple Constraints  Managers often.
Cindy Collins ETEC 665 More On The Proposal Budget Questions.
Floor Plans Floor plans are the central or core drawings of any set of CD’s. They not only contain a tremendous amount of information for consultants and.
Lesson 8 Pricing the Landscape Plan Reminder: student learning activities are at the end of this power point.
MGT 437 OUTLET Become Exceptional/mgt437outlet.com FOR MORE CLASSES VISIT
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Project Management module
Copyright All Rights Reserved by
By Wilmer Arellano Spring 2010
8 The Mathematics of Scheduling
Project Planning & Scheduling
TOPIC-8A- PROJECT TIME CONTROL
Creating team solutions
Costs and Economics of Construction
Project Planning & Scheduling
An-Najah National University
The value of a project-oriented approach to IT and how we do it in IBM
Copyright © Cengage Learning. All rights reserved.
ENGINEERING MANAGEMENT (GE 404)
CHAPTER 6 PROJECT TIME MANAGEMENT
Project Time Management
Chapter 3 The Project Manager © 2012 John Wiley & Sons Inc.
(Additional Information)
In this tutorial you will:
Project Time Management
Scheduling Theory By Sarah Walker 12/4/2018.
Engineering Project Project Management Project Management.
Lecture 6: Time-Cost Trade-Offs
PROJECT MANAGEMENT (BSBI 622)
Project Time Management
ARCH 435 PROJECT MANAGEMENT
Welcome W 15 Introduction to Engineering Design II (IE 202)
Fine-Tuning your plan and obtaining approval
Lesson Objective Understand Cascade diagrams and be able to use them to draw resource histograms.
Setting up a project file
Importance of Project Schedules
ENGINEERING MANAGEMENT (GE 404)
Chapter 3 The Project Manager © 2012 John Wiley & Sons Inc.
Trillo Apparel Company Revised Delivery Plan
CHAPTER 6 PROJECT TIME MANAGEMENT
PROJECT PLANNING AND SCHEDULING BY: AMINATH SHAAYAN SHAHID.
Presentation transcript:

Project Management 101 Business Management

Four Basic Elements of Project Management A successful Project Manager must simultaneously manage the four basic elements of a project: Resources Time Money Scope All these elements are interrelated. Each must be managed effectively All must be managed together if the project, and the project manager, is to be a success.

Resources People Equipment Material

Time Task durations – the time needed to complete the task Dependencies - relationships in which tasks or milestones rely on other tasks to be performed (completely or partially) before it can be performed Critical path - is a mathematically based algorithm for scheduling a set of project activities

Critical Path cont’d To prepare the project schedule, the project manager has to figure out what the tasks are, how long they will take, what resources they require, and in what order they should be done If you omit a task, the project won't be completed. If you underestimate the length of time or the amount of resources required for the task, you may miss your schedule. The schedule can also be blown if you make a mistake in the sequencing of the tasks.

For example: Think of a project called "Getting Dressed In The Morning". The task "put on shirt" may have a longer duration if it is a buttoned dress shirt than if it's a pullover. It doesn't matter which order you complete the tasks "put on right shoe" and "put on left shoe", but it is important to complete the "put on pants" task before starting the "put on shoes" task.

Items can be added to or removed from the critical path as circumstances change during the execution of the project For example: Installation of security cameras may not be on the critical path, but if the shipment is delayed, it may become part of the critical path Conversely, pouring the concrete foundation may be on the critical path, but if the project manager obtains an additional crew and the pour is completed early it could come off the critical path (or reduce the length of the critical path).

Money Costs Contingencies - Possibilities that must be prepared for Profit *** To maximize your chances of meeting your project budget, meet your project schedule The most common cause of blown budgets is blown schedules

Contingencies Unusual weather or problems with suppliers are always a possibility on large projects Companies usually include a contingency amount in the project budget to cover these kinds of things

Scope Project size Goals Requirements

Scope cont’d The project scope is the definition of what the project is supposed to accomplish and the budget (of time and money) that has been created to achieve these objectives It is absolutely imperative that any change to the scope of the project have a matching change in budget, either time or resources

Scope Creep Usually, scope changes occur in the form of "scope creep". Scope creep is the piling up of small changes that by themselves are manageable, but in aggregate are significant

For Example: The project calls for a building to be 80,000 square feet in size. The client wants to add a ten foot long, 4 foot wide awning over one bay door. That's a pretty minor change. Later the client wants to extend the awing 8 feet to cover the adjacent bay. Another minor change. Then it's a change to block the upwind side to the covered area to keep out the wind. Later, it's a request to block the other end to make the addition more symmetrical. Eventually, the client asks for a ceiling under the awning, lights in the ceiling, electrical outlets, a water faucet for the workers, some sound-proofing, and a security camera. By now, the minor change has become a major addition. Make sure any requested change, no matter how small, is accompanied by approval for a change in budget or schedule or both.

In the end… You can not effectively manage the resources, time and money in a project unless you actively manage the project scope. When you have the project scope clearly identified and associated to the timeline and budget, you can begin to manage the project resources. These include the people, equipment, and material needed to complete the project

To Review The four basic elements of a project are: Resources Time Money Scope