16-17 March 2010 CERN Introduction by W. Weingarten Review of SPL RF power couplers 16/17 March 2010 Review of SPL RF power couplers 1.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Progress and Plan for Superconducting RF Cavity RF Group.
© 2013 Toshiba Corporation Toshiba Electron Tubes & Devices Co., Ltd. November, 2013 Scope of Disclosure Owner Comparison of fabrication techniques in.
SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Coupler Development Program at LAL-Orsay and.
Coupler without copper coating S. Kazakov 11/13/2013.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
Compatibility in the ILC ML. 主なデザインと相違点 BCD ( TTF) STF-BL その他 空洞、シー ル Φ 78 mm ビームパイ プ、アルミヘキサゴ ン Φ 80 mm ビームパイ プ、インジウムヘリ コ LL, Re 入力カプ ラー TTF-III 円筒セラミック窓.
A general comment first: The questions ITRP has posed to the proponents focus largely upon technical issues for the linear collider. These are important.
IHEP High Power Input Coupler Activity Report First Mini-workshop on IHEP 1.3 GHz Superconducting RF project June 10th, 2009, Beijing IHEP High Power Input.
LALEucard WP IN2P3 Les deux infinis IN2P3 Les deux infinis W. Kaabi, Y. Peinaud, A. Thiebault, E. Herry, A. Variola. M. Lacroix, F. Letellier-Cohen,
Test Results of TTF-V Couplers for ILC H. JENHANI (CEA/IRFU) 1.
2009/1/16-18 ILD09 Seoul 1 Notes for ILD Beam Pipe (Technical Aspect) Y. Suetsugu, KEK Parasitic loss Vacuum pressure profile Some comments for beam pipe.
1.3GHz Input Coupler for ILC
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
20 years of high average Fundamental Power Coupler designs at CERN CWRF workshop 2014, Trieste Eric Montesinos, CERN-RF, on behalf of many colleagues CWRF.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
Titanium Nitride Coating by Reactive DC Magnetron Sputtering as a Multipactor Suppressor on Coupler RF Ceramic Windows Walid KAABI Anti e - Cloud Coatings-
16-17 March 2010 CERN W. Weingarten DRAFT summary. rev Review of SPL RF power couplers 16/17 March 2010 Review of SPL RF power couplers 1.
29/04/03 F. Caspers (CERN):Chopper development evolution IPHI-SPL meeting April   Brief review of present status   Why to consider an alternative.
RF power couplers vacuum issues J.M. Jimenez Vacuum, Surfaces and Coatings Group (TE-VSC)
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
CDR2 – Coupler Mechanical Design NICOLAS MISIARA.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
IFMIF Power Coupler for HWR Superconducting cavities SRF LINAC GROUP H. Jenhani 1, N. Bazin 1, P. Bosland 1, B. Branas 2, P. Brédy 1, P. Carbonnier 1,
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
LALEucard WP IN2P3 Les deux infinis IN2P3 Les deux infinis W. Kaabi, Y. Peinaud, A. Thiebault, E. Herry, A. Variola. M. Lacroix, B. Mercier and.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
SPL RF coupler: integration aspects
Tongming Huang (IHEP) On behalf of the power coupler working group
CW couplers; KEK injector couplers Eiji Kako (KEK, Japan)
Ti/SS transitions A.Basti INFN-PISA*
T5.2: Harmonization - Material and Component Reference
Development of X-band 50MW klystron in BVERI
Power Couplers, HOM Couplers and Tuners for the XFEL
Power coupler at DESY & for XFEL
From Physics model to Engineering model
Odu/slac rf-dipole prototype
MICE RF Cavity Simulations and Multipactor
A frequency choice for the SPL machine: Impact on hardware
Challenges of vacuum chambers with adjustable gap for SC undulators
THE HIE-ISOLDE SUPERCONDUCTING CAVITIES:
Superconducting Cavities: Development/Production
V. Veshcherevich Cornell University
Main Coupler R&D at DESY
-Honors Thesis Defense- In Situ Ellipsometry of Surfaces in an Ultrahigh Vacuum Thin Film Deposition Chamber Joseph Choi Department of Physics and Astronomy,
Multipacting Simulations of TTF-III Coupler Components*#
XFEL Collimation and Beam Switchyard Vacuum Issues
IMP Cryomodule Assembly and Alignment
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
Nick Walker (DESY) EU GDE Meeting Oxford
Current Design and Short Status
Technical Issues Related to Superconducting Accelerator Modules
Cryomodules Challenges for PERLE
Undulator System Components Status Dean Walters
European Coordination for Accelerator Research & Development
V. Veshcherevich Cornell University
Magnetic shielding and thermal shielding
Breakout Session SC3 – Undulator
Cryomodule Design for CW Operation 3.9 GHz considerations
Presentation transcript:

High Power Couplers and… pushing the limits of SC cavities Alessandro Variola Laboratoire de l’Accélérateur Linéaire, IN2P3 -CNRS and the Université de Paris-Sud 11, Centre Scientifique d’Orsay, B.P. 34 F-91898 Orsay Cedex France Variola@lal.in2p3.fr Alessandro Variola, LAL-ORSAY, IN2P3-CNRS 2006 Thin Films Workshop. Legnaro, Italy 15/11/2018

What is the connection between high power couplers and thin films and pushing the limits of SC cavities ? I will try to persuade you that the two fields are close…. Alessandro Variola, LAL-ORSAY, IN2P3-CNRS 2006 Thin Films Workshop. Legnaro, Italy 15/11/2018

What is a coupler? Its functions: Transferring RF power from the source (klystron) to the accelerating structure Matching the “external world” with the “cavity world” as far as the e.m field, the thermal and the vacuum transition are concerned Alessandro Variola, LAL-ORSAY, IN2P3-CNRS 2006 Thin Films Workshop. Legnaro, Italy 15/11/2018

How does it looks like? Example: TTFIII Pulsed Cylindrical window Alessandro Variola, LAL-ORSAY, IN2P3-CNRS 2006 Thin Films Workshop. Legnaro, Italy 15/11/2018

Scenario As far as SC cavities are concerned power couplers are not only a ‘coupling device’. Due to the strong cavity constraints we have to consider the coupler, or at least the cold part, as a integrated part of the cavity itself. So to assure the cavity to reach its “limits” a considerable attention must be put on the coupler and its integration Alessandro Variola, LAL-ORSAY, IN2P3-CNRS 2006 Thin Films Workshop. Legnaro, Italy 15/11/2018

HIGH POWER & COUPLERS Before production…… Pushing the cavities limits: High power (Pulsed or CW) beam current - accelerating gradients. As far as the coupler is concerned,to reach this goal the design phase is crucial. A multidisciplinary approach must be followed taking into account e.m, thermal and material science aspects i.e. - impedance matching design, Qext flexibility (105-107), mechanical adjustements (bellows), thermal transitions (300-70-2 K) & heating, materials choices,dynamic and static heat load, cool down stresses (300 – 2 K), cavity performances (cleanliness), integration, vacuum requirements beam dynamics effects (p mm mrad), windows coating………and COST $$$$$$$$ => CONDITIONING TIME……… Often increasing in one performance affects other aspects. The coupler design is a multi-parameter optimisation process . Alessandro Variola, LAL-ORSAY, IN2P3-CNRS 2006 Thin Films Workshop. Legnaro, Italy 15/11/2018

Design : Two Basic Options Coaxial (SC cavities) Aperture & sizes (integration) Thermal heat leak Matching & Flexibility Waveguide (RF-GUNS, Sources, Injectors) Simplicity of the design Lower Surface E-field Cooling system Pumping efficiency No transition WG / Coax Alessandro Variola, LAL-ORSAY, IN2P3-CNRS 2006 Thin Films Workshop. Legnaro, Italy 15/11/2018

To reach higher and higher power performances we have to take into account the possible limiting factors: 1 ) MULTIPACTOR (resonant electron cascade in HF) -ceramic window (coating) -diameter -impedance -fields -frequency -Preparation (cleanliness) 2) Matching to the cavity => Q ext Frequency shift Transients Transition (Doorknob) Feedthrough isolation RF contact 3) THERMAL - Loads Materials (copper plating) Heat sinks Alessandro Variola, LAL-ORSAY, IN2P3-CNRS 2006 Thin Films Workshop. Legnaro, Italy 15/11/2018

Reduce the dynamic and static losses (optimisation) Thermal design (extremely important in CW) Reduce the dynamic and static losses (optimisation) -Choice of the Material -Cu plating thickness -Windows (again) -Hot spots (ceramics, bellows (again)….) -Flanges and gaskets -Simulations Alessandro Variola, LAL-ORSAY, IN2P3-CNRS 2006 Thin Films Workshop. Legnaro, Italy 15/11/2018

Production Thins films : ceramic window coating Alumina windows & TiN coating Alumina windows = critical component Thermal, Vacuum, Multipacting (High SEY) High purity alumina TiN coating (evaporation, sputtering) Alessandro Variola, LAL-ORSAY, IN2P3-CNRS 2006 Thin Films Workshop. Legnaro, Italy 15/11/2018

Ti – TiN Coatings. Windows and couplers parts Lower the SEY reducing the multipactor activity. Constraints : loss tangent, reflectivity => Thickness ~ 10 nm (DESY) Windows and coaxial parts Evaporation / Sputtering Examples : Evaporation [DESY]. Ti vapour in low pressure ammonia (99,98%). Pre vacuum 5 10-6mbar. Titanium wire @1000o =>Ceramic pre-heating ~150o.Sublimation T ~ 1500o, than nitrification with ammonia pressure up to 300 mbar x 10h. Sputtering [KEK – multipactor on couplers, SNS – e cloud in damping rings] on SS chambers. KEK (couplers coaxial parts) : DC sputtering, Pre vacuum ~10-6, gas Ar:N2=1:2 (0.24 mbar). Sputtering has also been used in KEK to coat alumina windows but very few information about (next talk) SNS (vacuum chambers) :DC sputtering, Pre vacuum 5 10-7 (0.1T), Pre sputtering in Argon, Ar:N2, chamber T ~ 250o Other Coatings : Can NEG be a solution? Controversial exp. Needs a clear answer especially for the sticking under high power HF Alessandro Variola, LAL-ORSAY, IN2P3-CNRS 2006 Thin Films Workshop. Legnaro, Italy 15/11/2018

After Production VERY IMPORTANT => Integration in a SC cavity : the coupler does not have to hinder the SC cavity performance Class 10 clean room Ultra-pure water production A detailed and complex process: -Reception -Cleaning Rinsing Drying Diagnostics Baking Assembling Mounting Conditioning Vacuum furnace Vacuum: No hydrocarbons, no contaminants, Mounting on laminar flow, in-situ baking with silicon Strips/UV lamps/baking jacket. Alessandro Variola, LAL-ORSAY, IN2P3-CNRS 2006 Thin Films Workshop. Legnaro, Italy 15/11/2018

An example : the TTF3 procedure Reception (endoscope analysis). Data-base for mechanical defects Ultrasound bath with detergent (5 l per 160 l of water), 25 or 40 Hz frequency, 4000 W transmitter power (ultrasonic power), 15 minutes in the bath with ultrasonic power, heating of water at 50 °C Cleaning – ultra-pure water - 18 MOhm cm – ion, molecules and durapore (particles with 0.22 microns diam.) filter - with resistivity check – ionized nitrogen drying (3bar) with particle counting check Pre baking in vacuum oven (10-6@150 degrees) Assembling Baking on the conditioning test bench RF for conditioning Storing warm part under nitrogen and cold parts under vacuum Alessandro Variola, LAL-ORSAY, IN2P3-CNRS 2006 Thin Films Workshop. Legnaro, Italy 15/11/2018

Results : 15/11/2018 Thanks to W.D Moeller & D.Kostin Alessandro Variola, LAL-ORSAY, IN2P3-CNRS 2006 Thin Films Workshop. Legnaro, Italy 15/11/2018

Pushing the limits… What are the possible improvements? - Design => Multipactor and thermal Brazing and welding techniques (reliability). Diagnostics and surface analysis. What we can learn from thin film community? Cleaning : what we can transfer from cavity experience, Argon discharge Design : bellows, coupling (capacitive) Materials : alumina windows, plating Antenna bias Coating : All deposited couplers (TiN, NEG…??). Windows coating techniques Alessandro Variola, LAL-ORSAY, IN2P3-CNRS 2006 Thin Films Workshop. Legnaro, Italy 15/11/2018

$ Mass Production. Industrial studies $ TTFIII XFEL industrialisation For 1000 couplers. PROCESS : Coupler design re-analysis in term of -performance -material -tolerances -assembly (brazes…) -diagnostics -interfaces Taking into account : Mechanical, Vacuum, Thermal, Electrical, Geometry, Assembly and Cleanliness constraints It is necessary to share with Industries the expertise on : Welding, Brazing. Cu Plating, TiN coating&Surface Analysis, Handling&Clean Room Procedures, Conditionning Alessandro Variola, LAL-ORSAY, IN2P3-CNRS 2006 Thin Films Workshop. Legnaro, Italy 15/11/2018

Other examples KEK – Capacitive coupling Cornell ERL – Modified TTFIII 1 cylindrical – 1 planar Cornell ERL – Modified TTFIII for CW mode Alessandro Variola, LAL-ORSAY, IN2P3-CNRS 2006 Thin Films Workshop. Legnaro, Italy 15/11/2018

TEST - Coupler (NEG, Surface analysis etc) Couplers are very expensive devices : It is important to have some reliable, not expensive and accessible model to test different solutions and to have surface quality measurements Adhesion (RF sticking) Oxidation Quality of coating Alessandro Variola, LAL-ORSAY, IN2P3-CNRS 2006 Thin Films Workshop. Legnaro, Italy 15/11/2018

Conclusions The power coupler is a integrate part of the SC cavity….. …so pushing the limit of cavities means to develop in parallel the appropriate coupler. Improvements : Design (e.m. multipactor and thermal - bellows), preparation and integration, materials (alumina, conductors). Thin Films can play a determinant role also for power couplers. Coatings are determinant : Ti / TiN on windows and coaxial parts. Cleanliness !!! It is important to dispose of “test couplers” in which different materials and techniques (thin films…) could be tested (also if expensive…). Costs must be reduced Alessandro Variola, LAL-ORSAY, IN2P3-CNRS 2006 Thin Films Workshop. Legnaro, Italy 15/11/2018

Remember: For ILC power couplers are cost divers as the cavities If thin films for SC cavities will work cavities will cost less…….. At this point it will be mandatory to work on thin films for couplers !!!!!!! Alessandro Variola, LAL-ORSAY, IN2P3-CNRS 2006 Thin Films Workshop. Legnaro, Italy 15/11/2018

ACKNOWLEDGEMENTS I would like to acknowledge the conference board for inviting me Special thanks to all the colleagues providing me suggestions and information. Alessandro Variola, LAL-ORSAY, IN2P3-CNRS 2006 Thin Films Workshop. Legnaro, Italy 15/11/2018

15/11/2018 Alessandro Variola, LAL-ORSAY, IN2P3-CNRS 2006 Thin Films Workshop. Legnaro, Italy 15/11/2018