ZEUS Computing Board Report

Slides:



Advertisements
Similar presentations
Low x workshop Helsinki 2007 Joël Feltesse 1 Inclusive F 2 at low x and F L measurement at HERA Joël Feltesse Desy/Hamburg/Saclay On behalf of the H1 and.
Advertisements

Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Revision from last week  Assumptions are potential failure points in a project. They need to be monitored and managed. At the start of the project they.
DPF Victor Pavlunin on behalf of the CLEO Collaboration DPF-2006 Results from four CLEO Y (5S) analyses:  Exclusive B s and B Reconstruction at.
DATA PRESERVATION IN ALICE FEDERICO CARMINATI. MOTIVATION ALICE is a 150 M CHF investment by a large scientific community The ALICE data is unique and.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
David Lamoureux CalPERS Deputy Chief Actuary
W.Smith, U. Wisconsin, ZEUS Computing Board Zeus Executive, March 1, ZEUS Computing Board Report Zeus Executive Meeting Wesley H. Smith, University.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 K.Young 1 LAT Data Processing Facility Automatically process Level 0 data.
News from the Beatenberg Trigger Workshop Ricardo Gonçalo - 18 February 2009 Higgs WG Meeting during ATLAS Week.
A Framework for Elastic Execution of Existing MPI Programs Aarthi Raveendran Tekin Bicer Gagan Agrawal 1.
ALICE Upgrade for Run3: Computing HL-LHC Trigger, Online and Offline Computing Working Group Topical Workshop Sep 5 th 2014.
9 February 2000CHEP2000 Paper 3681 CDF Data Handling: Resource Management and Tests E.Buckley-Geer, S.Lammel, F.Ratnikov, T.Watts Hardware and Resources.
Robert Klanner - DESY 1 DESY, HERA and the US contribution HERA and DESY HERA status ZEUS and the US groups HERA and particle physics.
Computing Resources for ILD Akiya Miyamoto, KEK with a help by Vincent, Mark, Junping, Frank 9 September 2014 ILD Oshu City a report on work.
Preliminary analysis of p-Pb data update n. 6 Lorenzo Bonechi LHCf Catania meeting – 19 December 2013.
October 5, 2004SUSY Meeting -- M.Rossi1 the Udine approach to SUSY Multileptons Udine University M.P.Giordani, G.Pauletta, M.Rossi.
Update on MC-04(05) –New interaction region –Attenuation lengths vs endcap module numbers –Regeneration and nuclear interaction –EMC time resolution –
GIST 19: GGSPS status Status of GGSPS development and operations Andy Smith GGSPS software project manager.
Plenary Physics Meeting, 17 June 05 Per Jonsson Imperial College London 1 Higgs Searches with 1 fb -1 Per Jonsson Imperial College London On behalf of.
Status report of the KLOE offline G. Venanzoni – LNF LNF Scientific Committee Frascati, 9 November 2004.
1 What I did last year Nick Barlow Manchester Christmas meeting January 2005.
Computing Resources for ILD Akiya Miyamoto, KEK with a help by Vincent, Mark, Junping, Frank 9 September 2014 ILD Oshu City a report on work.
Physics Results from CDF and Prospects for a FY 2011 Run Kevin Pitts / University of Illinois DOE S&T Review of Scientific User Facilities June 30 – July.
Samir Guragain, Marcus Hohlmann Florida Institute of Technology, Melbourne, FL Z′ Mass Reach MC Analysis USCMS meeting Brown University May 6 – 8, 2010.
Summary of User Requirements for Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Offline Week Alignment and Calibration Workshop February.
A proposal for the KM3NeT Computing Model Pasquale Migliozzi INFN - Napoli 1.
CDF SAM Deployment Status Doug Benjamin Duke University (for the CDF Data Handling Group)
A Search for Higgs Decaying to WW (*) at DØ presented by Amber Jenkins Imperial College London on behalf of the D  Collaboration Meeting of the Division.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 28,
Project Update and Summary of Project Priority List (PPL) Activity
WP18, High-speed data recording Krzysztof Wrona, European XFEL
CLAS12 DAQ & Trigger Status
Initial ERCOT Parking Deck Prioritization Recommendation
Monitoring and Evaluation Systems for NARS organizations in Papua New Guinea Day 4. Session 12. Risk Management.
Boulder Junction Town Road Improvement Project
2011 Prioritization Update to Market Subcommittees
Predrag Buncic ALICE Status Report LHCC Referee Meeting CERN
Tracking performances & b-tagging commissioning
Parliament and the National Budget Process
Project Update and Summary of Project Priority List (PPL) Activity
Initial ERCOT Parking Deck Prioritization Recommendation
Octorara Area School District
Project Controls: As-Built S-Curves
GERDA Collaboration Meeting,
TOF CALIBRATION DATABASE
Philippe Charpentier CERN – LHCb On behalf of the LHCb Computing Group
Charged Current Cross Sections with polarised lepton beam at ZEUS
Progress with MUON reconstruction
Twelfth Policy Board meeting Lima, Peru 8-9 July 2014
ALICE Computing Upgrade Predrag Buncic
Scientific Computing At Jefferson Lab
University of Wisconsin This talk is available on:
The Silicon Track Trigger (STT) at DØ
Guidance notes for Project Manager
Transit Signal Priority: The Importance of AVL Data
NanoBPM Status and Multibunch Mark Slater, Cambridge University
Control unit extension for data hazards
Search for coincidences and study of cosmic rays spectrum
DIRC Background Status
Charged Current Cross Sections with polarised lepton beam at ZEUS
Based on a presentation of M.Verderi
EVALUATION OF COUNTERMEASURES PDCA
News and Communications
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Charge to the Validation Review
EVALUATION OF COUNTERMEASURES PDCA
Lunar Calibration Workshop Status of the preparation
MULTIFAN-CL implementation of deterministic and stochastic projections
Safety Standards Committee meetings 24th TRANSSC meeting Agenda item 3
Presentation transcript:

ZEUS Computing Board Report Zeus Executive Meeting June 28, 2006 Wesley H. Smith, University of Wisconsin on behalf of the ZEUS Computing Board: James Ferrando, Achim Geiser,Tobias Haas, Masahiro Kuze, Rainer Mankel, Uta Stoesslein, Krzysztof Wrona Notes from Meetings on June 27 and April 6 This talk is available on: http://www.hep.wisc.edu/wsmith/zeus/smith_compute_jun06.pdf

ZCB Mandate ZCB will normally meet 3 times a year to coincide with the ZEUS collaboration meetings. ZCB is charged with the following: Review the current status and short term planning of ZEUS offline. Recommend changes and new initiatives where necessary. Review the progress of the medium term planning as outlined in ZEUS-note 03-024 (ZEUS Computing Strategy: an update for years 2004-2007). Recommend changes and new initiatives where necessary. Towards the end of 2006, formulate a plan for computing beyond 2007. ZCB Chair reports to ZEUS executive session at the ZEUS collaboration meetings.

Recommendations Do not double the HERA-II MDSTs. The cost is 30K€. This does not provide additional data security, but only saves time if recovery is needed. Files need to be stored in chronological order when they are (re) compacted. The IT division has been told that it is a requirement that the loss of a single tape does not effect more than a few days of data. 2006 data reprocessing should start as early as possible. Need all necessary calibration constants Reconstruction package needs well-tested and improved software, in particular for combined tracking including STT.

Input to Computing Model LER has little impact on estimate Calculation of analysis volume includes HERA I MC as well as HERA II All MC is generated one year after the data. The reprocessing schedule is assumed to follow as it has in the past. All analyses will have converted to the common Root “n-tuple” scheme by 2010 Beyond 2011, all that remains for analysis will be these common Root “n-tuples” We need to implement the plan for actually doing this for all physics groups (may be that MDSTs will still be used).

Lessons from recent experience For 131 days of 2006 running, average ZEUS gated lumi 0.47 pb-1/day. 61 pb-1 from 4.5 months of 10.5 months with 200 pb-1 expected in 2006. Now estimate ZEUS gets 2/3 of the original estimate or ~130 pb-1 for 2006. Estimated increase in data volume of 10% from 2005 value of .051 TB/pb-1. Data volume incl. STT & tracking tables increased to .063 TB/pb-1 (24%) Anticipated volume of the 2006 data now 80% of that expected. Some of additional volume may be caused by poor background conditions. MC file volume only scales with luminosity. Have additional contingency in estimates of 2006 data volume. Do not reduce resources, but keep potential extra volume for added MC. High, Average & Low Lumi TLT cross sections of 0.795, 0.841 & 1.052 µb higher than target Low Lumi value of 0.75 µb, but due to 2006 luminosity experience, do not change trigger, since trigger stability is a priority.

Computing Model (Krzysztof Wrona)

Results from Computing Model Preliminary validation of R. Mankel’s estimated computing upgrade costs of 230/220/190/150 K€/year for 2008/9/10/11 Then add annual manpower cost of 125 K€/year until 2011 While this is a preliminary result, it is now referred to the ZEUS Executive to evaluate whether this is consistent with funding level expectations.

Appendix: Input numbers (Krzysztof Wrona) For 2005, 2006 use numbers from mass storage, for 2007 the short term plans: HERA-II MC 2005 5 TB 2006 30 TB 2007 105 TB 2008 180 TB 2009 255 TB 2010 330 TB HERA-I MC 2005 - 50 TB ( 2006 value minus production in 2005 (~20TB) ) 2006 - 70 TB ( from Achim calculations) 2007+ - 70 TB The numbers for HERA-II 2005 and 2006 are taken from mass storage system as of the beginning of each year respectively. For 2007 we agreed that the production in 2006 will be limited to 75 TB, which in total gives the number 105 TB for the beginning of 2007. For the next years assume 75 TB per year.