Project: 33kV Substation Refurbishment Customer: NEEPCO Site : Ranga Hydro Electric Plant, P.O. Ranga Project, Arunachal Pradesh.

Slides:



Advertisements
Similar presentations
CIMA-GMP FAT & QM CENTER
Advertisements

PROJECT MANAGEMENT PROJECT MANAGER ENGINEERING MANAGER PROCUREMENT MANAGER CONSTRUCTION MANAGER.
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Striving to exceed customer demands by delivering the best.
1 Belene NPP Project Configuration Management Presented by Alexey Matveev Varna, May
Slide 2.1 4E1 Project Management Defining the Project.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Racco industrial consulting working according to investment law to prepare Engineering, Economic, Technology, Environmental Studies for industrial projects.
REQUEST FOR PROPOSALS RFP #08-56 Project Management and Procurement Assistance Consultant for an Intelligent Transit System Solution (I.T.S.S.) October.
Project Close Out CTC-470.
Ocimum Systems: –Established in the year 2013 in Bangalore with a team having over a decade of expertise in the networking industry and a vision to provide.
Interior Lifestyles Pvt. Ltd Welcome to our six step process for Interior designing of your commercial space. 6 6.
© ABB Group Aug-15 Medium Voltage Hard Bus Retro-fill ABB MV Service.
Development plan and quality plan for your Project
Genesis Solar Module Brochure ™
RTD/E.2/JL1 CARERA THE IMPACT OF CAP REFORM ON THE EMPLOYMENT LEVELS IN RURAL AREAS Kick off meeting CRETE; 16 – 17 March 2006 Martin Greimel Project Officer.
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
From Research Prototype to Production
Welcome to Address : Sr. No. 227/1, Sahakar Nagar, Dighi Road, Bhosari, Pune Phone Number:
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
Vacuum - CONTROL SYSTEM 29 June Agenda MSRC design, first ideas and plans – Antonio quiet cooling fans test – Irene some scada SW review - Martin.
Manufacturing Process GLOBOSE Manufacturing Process Details Globose Systems and Solution Pvt,. Ltd.
Purchase Order A Purchase Order (PO) is prepared by a customer and sent to us to order goods or services. The term "Purchase Order" has a special legal.
MICE Collaboration meeting (CM20) At RAL 10 – 13 Feb 2008 AFC Magnet – Status and Progress W. Lau, Oxford University.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Oracle Services Procurement
Sydney (02) Melbourne (03) Brisbane (07) Carlo Biaro Capital Insight Conference 2013 – Tools and.
Solar PV Tender Overview Ministry of Livestock, Fisheries and Rural Development Department of Rural Development Place - Sule Shangri-La Hotel Date- 4 -
N. Noorzadeh Director of Certificate of Origin Division.
Asahi Switchgear Products Ltd. (ASPL) is a joint venture between Hirose Co. Japan and ASABHANU Technical Services Ltd., (ABTS) India. Asahi is located.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
CORP3341 Clarification Meeting Technical Evaluation of Metering Substation panels and modules Enquiry Date: 27 November 2015 Presenter: Henri Groenewald.
 SOFTCON SYSTEMS PVT. LTD. (SSPL) offers unique, creative and practical automation solutions in the field of Process & Power on an LSTK / EPC basis with.
New York Program Launch Chris Smith Opus Inspection VP of Operations.
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
Production Part Approval Process
ROOFTOP SOLAR PHOTOVOLTAIC SYSTEM
PROJECT COMMUNICATION PROCEDURE AND DOCUMENT MANAGEMENT
UNIDO-GEF Industrial Energy Efficiency Project in Macedonia
Systematic Project Management is our answer to the challenges in today’s project business We have the biggest portion of our business volume coming from.
ISO/IEC
Architecture, Interior and Project management consultant
Sheridan RFP Proposal for the Purchase of Printers for HMC 1 & 2
Campus Master Plan.
About Us Ocimum Systems:
WES Document Flow 1 of 4 Receipt of tender specification (S&M team)
Solar Rooftop Demonstration Projects in Member Countries of ISA
2K CB FDR Overview:  Agenda, Charge, Review Process
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Free Study Material Provide Dumps4download.co.in
Customer Overview Pack – September 2018
Audit Planning & Service Method Geotek Global Certification Pvt. Ltd.
Asset Acquisition Process
Operating and Maintenance Contracts Breakout Session
Aftermarket Parts and Services
Customer Overview Pack – September 2018
Production Part Approval Process
Name of Project Manager Date
Workshop commissioning Installation Coordination at ESS
Specifications What should it cover Goods Services Warranty
POWER SYSTEM COMMISSIONING AND MAINTENANCE PRACTICE
Atefeh Sadeghzadeh Control engineer – Target safety and control
Executive Project Kickoff
CEM 515 Done by: Abdulkarim Sulais
4.03 Apply quality assurances to enhance product/service offerings.
Presentation transcript:

Project: 33kV Substation Refurbishment Customer: NEEPCO Site : Ranga Hydro Electric Plant, P.O. Ranga Project, Arunachal Pradesh

Project Site

Project Scope Site Assessment & MOM Key Challenges Remote Site Old Installation Close co-ordination among S&S, Vingiri & NEEPCO Technical Requirement Agreement on performance improvement targeted before detailed engineering Schedule of execution

Key Contacts Site Contact : NEEPCO Mr.Mohan lal kumhar, Sr. Manager(E/M)US &W, Mob.No:09436225093/08730946725 Vingiri Powertech Pvt Ltd Mr.K.A.Singh , Mob.No:09433229494. S&S Power Switchgear Ltd Mr.Manikanda kumaran. Mob.No.08608330332 S&S Engineering, Manufacturing & Supply Vingiri Erection, Commissioning and Testing NEEPCO End requirement specification

NEEPCO HYDRO POWERSTATION – SLD

OPPORTUNITY SIZE (Qty) Sl.No DESCRIPTION Qty 1 33kV, 1250A, 25kA/3SEC PCVCB with Local Control Panels & PT, CT’S 2 33 kV, 1250A DISCONNECTOR (MGB Type ) 5 3 Remote Control panels for Breaker and Isolator (with single panels) 4 Suitable control unit panels for 11kV SF6 (24V DC ) with PT ‘S 11

REPLACEMENT OF EXISTING SF6 WITH NEW OFVP36 OLD SF6 S&S OFVp36

REPLACEMENT OF EXISTING 33kV DISCONNECTOR WITH NEW 33kV DISCONNECTOR OLD DISCONNECTOR S&S DISCONNECTOR

OLD INDOOR CONTROL UNIT PANELS S&S INDOOR CONTROL UNIT PANELS REPLACEMENT OF EXISTING INDOOR CONTROL UNIT PANEL WITH NEW INDOOR CONTROL UNIT PANELS OLD INDOOR CONTROL UNIT PANELS S&S INDOOR CONTROL UNIT PANELS

INTEGRATED REMOTE CONTROL CUBILE FOR 33kV VCB DISCONNECTOR OLD REMOTE PANEL NEW INTEGRATED REMOTE PANEL

PLANNING SCHEDULE ( NEEPCO ) Dispatch Erection and Testing and Commissioning ( Load test ) Site visit, Drawing preparation & clarification FEB MAR MAY JUL Drawing , QAP Approval and Manufacturing , Internal Inspection. Customer Inspection

DIVISION OF RESPONSIBILITY Sl.No Tasks S&S VINGIRI 1 Site Visit for assessment of Existing Site location a 2 Preparation of site visit report 3 Discussion on needed with NEEPCO 4 Revision of proposal the in line with discussion 5 Firming up technical requirement X 6 Preparing a commercial offer 7 Sign off by NEEPCO for successful completion and issue of completion certification. 8 Offer part –A supply of equipment / Switchgear. 9 Offer part-B field work and consumable. 10 Final commercial officer.

Sl.No Tasks S&S VINGIRI 11 Negotiation a X 12 Finalization of contract between vingiri and NEEPCO. 13 Scope of supply in line with Offer & PO to S&S. 14 S&S contract review and kick off meeting. 15 Customer engineering 16 Drawing submission though vingiri. 17 Drg Approval. 18 Collection of advance 19 Release of BOQ 20 Ordering input

Sl.No Tasks S&S VINGIRI 21 Starting of materials finalization a X 22 Design confirmation check. 23 Manufacturing Quality check. 24 Customer Inspection 25 Internal Acceptance 26 Customer FAT & Training. 27 Obtaining dispatch clearance 28 Obtaining payment. 29 Effective date of shipment 30 Receipt of goods at site

Sl.No Tasks S&S VINGIRI 31 Safe storage a 32 Packing 33 Erection and commissioning. X 34 Refurbishment / Replacement of items. 35 Completion. 36 Site Acceptance

OLD SF6 VS NEW VACUUM BREAKER

MINUTES OF MEETING – AT MMF

MINUTES OF MEETING – AT NEEPCO