Tampa Bay Regional Strategic Freight Plan

Slides:



Advertisements
Similar presentations
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Advertisements

CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
Update of Downtown Rail Improvements DFWI & Chamber Stakeholders February 26, 2014 Alonzo Liñán, PE, PTOE City of Fort Worth.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
1 S.R. 426/C.R. 419 Project Update City Council Work Session November 13, 2006.
PUBLIC WORKS DEPARTMENT RED LIGHT CAMERA UPDATE FY Budget Worksession July 12, 2011.
2030 Long-Range Transportation Plan Ithaca-Tompkins County Transportation Council Public MeetingFernando de Aragón TCPL October 15, 2008Staff Director.
Rapid Transit Investment Plan David Armijo, CEO March 19, 2010.
Transit Initiatives and Coordination with PPC Transit Initiatives and Coordination with PPC February 17, 2010.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
HB 2 Process Update Policy Committee Meeting September 21, 2015.
Broward Complete Streets Technical Advisory Committee (TAC) Meeting Monday August 10, 2015.
Freight Advisory Committee May 13th, 2013 Ashley Probart Deputy Director Freight Mobility Strategic Investment Board At-Grade Rail Crossings.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
What is Transportation Outlook 2035? Long-range transportation plan for the Baltimore region Updated every 4 years Includes major capital projects from.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
Anchorage Metropolitan Area Transportation Solutions Freight Advisory Committee (FAC) Freight and Land Use: Making the Connection December 15, 2010 Ms.
US 25 Corbin to London Citizens Advisory Committee Meeting December 2011.
PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015.
Pioneer Trail I-95/Pioneer Trail Interchange Turnbull Bay Rd County & Port Orange request restoring interchange to TPO “unfunded” LRTP To allow interchange.
FY 2017-FY 2021 Project Priorities Bay County TPO Gary Kramer Senior Planner, TPO Staff
Program Manager Administrator
Polk Transportation Planning Organization 2035 Mobility Vision Plan Nov./Dec Draft Amendments to the Polk 2035 Mobility Vision Plan (MVP) Steering.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 6 October 6, 2015.
Visit Our Website at: Click to edit Master title style.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Bicycling in Minneapolis Bicycle Master Plan/Protected Bikeway Update
Nixon Road Corridor Study: Findings & Options
Finance Committee & City Council October 10, 2016
REGIONAL BICYCLE AND PEDESTRIAN PLAN
NORTHWEST FLORIDA REGIONAL TPO
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Regional Roads Committee
Central Polk Parkway PD&E Study
21st Century Transportation Committee Finance Subcommittee
Downtown Truck Traffic Study
Major Projects in Development
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects
River to Sea TPO Meeting US 92/International Speedway Boulevard
Kerr Tar Project Update – June 2016
REGIONAL MODELS OF COOPERATION Between FDOT & Florida’s MPOs
The FDOT Work Program is a five-year plan that includes:
Metropolitan Planning Organization
Meeting of the Hillsborough MPO Board December 5, 2017
San Mateo Countywide Transportation Plan update
Update on Route 1 Efforts Transportation Advisory Committee October 20, 2015 Leonard Wolfenstein, FCDOT Jane Rosenbaum, FCDOT Doug Miller, FCDOT Department.
Michael A. Case, Interim Executive Director
Tampa Historic Streetcar, Inc. May 16, 2018
Transportation CIP Update
I-69 Southwest/I-610 West Loop Interchange Reconstruction
Hillsborough County GATEWAY STUDY.
Update on Kings Highway Corridor
Volusia TPO Board Meeting January 22, 2013
Lyle Parkway to SR 540 (Winter Lake Road)
projects update ATLANTA district
Purpose Tool needed to assist in planning for regional multimodal improvements in West Central Florida Develop a regional model to forecast travel patterns.
Orange Grove Boulevard Complete Streets Project
MPO Board Presentation
Regional COORDiNATION STRUCTURE AND BEST PRACTICES RECOMMENDATIONS
MPOAC and Legislative Update
Metropolitan District | mndot.gov
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Interlocal Cooperative Agreement FY 20
Space Coast TPO State Road (S.R.) 528 Update
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

Tampa Bay Regional Strategic Freight Plan Completed in 2012 with collaboration from MPOs and Local Municipalities from Crystal River to Sarasota. Currently being updated to reflect current freight industry practices and new local plans i.e. Hillsborough – Polk FLZ Strategic Plan Guides Implementation from planning to construction www.tampabayfreight.com

CFID Comprehensive Freight Improvement Database Database of freight mobility conditions and issues Allows for queries of freight planning data Supports planning and project implementation Issues are collected from Commercial Vehicle Operators in the region

National Highway Freight Network

National Highway Freight Program Florida Freight Advisory Committee Eric Lindstrom from Hillsborough County Economic Development – Member Projects Selected: I-75 SB Hillsborough County Rest Area Reconstruction and Expansion I-75 NB on-ramp from US 301 US 41 @ CSX South of Causeway Blvd Grade Separation Project is now fully funded

US 41 Freight Improvements Two projects: US 41 @ South of Causeway Blvd / CSX RR Crossing US 41 @ Pendola Point Public Outreach: Port of Tampa City of Tampa CSX Hillsborough County MPO HART Local businesses

US 41 @ South of Causeway Blvd Project Overview FPID# 440749-1-22-01 Re-evaluation of Recommendations from 1994 Environmental Document Add capacity and improve operations at two key intersections near Port Tampa Bay: New Interchange – US 41 @ Causeway Blvd New Overpass – US 41 @ CSX RR Crossing PD&E- FY 2018 Design- FY 2020 Right of Way- FY 2022 Construction- FY 2026

US 41 @ Pendola Point / Madison Ave Project Overview FPID# 430056-1-22-01 (PD&E) Recommendations to improve safety and operations near Pendola Point/Madison Ave: Widening US 41 from 4 lanes to 6 lanes between Denver St and Pendola Point (approximately 0.5 mile). Bike lanes & Sidewalks in project area Intersection improvements at Pendola Point PD&E- Completed in FY 2017 Design- Funded FY2023 Right of Way- unfunded Construction- unfunded

US 41 @ Pendola Point Rd./ Madison Ave. (Proposed Improvements) PD&E 430056-1-22-01 approved 01/2017

Questions? Lilliam Escalera EMO Project Manager lilliam.escalera@dot.state.fl.us 813-975-6445 Brian Hunter Freight Coordinator brian.hunter@dot.state.fl.us 813-975-6436 tampabayfreight.com freightmovesflorida.com