Redesignation of I-95 and I-295

Slides:



Advertisements
Similar presentations
Capital Beltway HOT Lanes Project Project Update March 2009.
Advertisements

Capital Beltway HOT Lanes Project Project Update April 2009.
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
Aledo Trail Traffic Control December 19, 2013 P HASE 1 SWITCH TO PHASE 2.
Grade Separation (GS-16) Project. Project Location - Bensenville N.
 11 years of service to the Borough of Mantoloking  Job titles included:  Chief financial Officer  Tax collector  Tax Search Officer  Michelle thank.
January 6. January 7 January 8 January 9 January 10.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.
Construction Industry Advancement Program John T. Withers, P.E.,P.P. Supervising Engineer, Highways/Buildings - Design New Jersey Turnpike Authority Working.
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Transportation Improvement Program New Jersey (FY ) Pennsylvania (FY ) December 2014.
I-65 Added Travel Lanes Project in Tippecanoe County
N TELEGRAPH RD Vehicle Position vs. Signal Timing for the Intersection of Telegraph Road and Maple Road Position 1: Vehicle entering intersection 0.1 seconds.
75 Express Lanes Segments A&B Construction From NW 170 Street to South of Miramar Parkway Community Meeting Presentation Tuesday April 28, 2015.
June 2011 Statewide Traffic Engineers Meeting Interstate Guide Sign Upgrade Projects.
Office of Traffic, Safety and Technology Chapter 4 Types of Signs Traffic Signs 101 November 20, 2014.
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
Cycle Path Diversion Strategy Catford Stadium Barratt London Aldgate Author P.Willisr.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Current Construction Projects Major Projects Pinellas County.
Offsite Detour analysis. Calculation of detour length Distance along SR = Distance along SR
Road Signs & Signals. RED= DO NOT ENTER YELLOW= RIGHT OF WAY IS EXPIRING GREEN= YOU MAY ENTER THE INTERSECTION Flashing Red: Stop, Yield to traffic and.
Office of Traffic, Safety, and Operations 1 Route Signs and Trailblazer Assemblies –The use of independent Route signs should be limited primarily to route.
Office of Traffic, Safety, and Operations 1 Reference Location Signs and Enhanced Ref. Loc. Signs –Enhanced Reference Location Signs, which enhance the.
Route 1 Olden Avenue & Mulberry Street Hyperbuild Project.
Signs, signals,& Road Markings
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
DFW Connector Project Main Street Bridge Starting in March 2010 Subject to Change.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
I-225 Rail Line Chuck Culig, Project Manager Tuesday, April 2, 2013 RTD Board of Directors Update.
Guide Signs Pavement Markings.  Guide signs provide information about intersecting roads, help direct you to cities and towns and show points of interest.
Lockheed Martin Regional Recruiting Center
MD 30 (Hanover Pike) at Mt. Gilead Road
What's in the 2009 MUTCD For Bicyclists?
The Industrial Revolution – Day 2
Four Winds Condominium Association August 2, 2017
Chapter 3 Regulatory, Warning & Guide Signs Overview
Gilbert Road Light Rail Extension
Project Status & Right-of-Way Acquisition
Col. Pike Multimodal: About the Project
UTILITY DESIGN SERVICES
Signs, Signals, and Roadway Markings
Highway 110 Project Update
Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.
Complete Streets Policy + Bicycle / Pedestrian Plan
Chapter 3 Regulatory, Warning & Guide Signs Overview
Update on Route 1 Efforts Transportation Advisory Committee October 20, 2015 Leonard Wolfenstein, FCDOT Jane Rosenbaum, FCDOT Doug Miller, FCDOT Department.
Highway 169 Bridge Replacement & Pavement Resurfacing
Quarterly Transportation Report 4th Quarter 2011 October 11, 2011
New Jersey Modern Roundabout Opportunity State !.
Issaquah-Fall City Road
Lower Makefield Township Community Meeting
Chapter 4 Types of Signs Traffic Signs 101 April 24, 2018.
Pryor Creek Trail - Phases 1A & 1B Pryor Creek, OK
WIND FARM Forward, Pennsylvania August 2007
projects update ATLANTA district
Contract 60X10 Informational Meeting Weber I-55
Signs, Signals, and Road Markings
Meadow Lake Boulevard Street Extension Project
Acton Extension Update
M14A/D Select Bus Service
Walker Street Reconstruction Project 25% Design Public Hearing
Harbour Island Force Main Replacement
Monterey County Project Report for Measure X Expenditures
Metropolitan District | mndot.gov
Stamford, CT Control City Request
Greater Pittsburgh Airport Area Property
Presentation transcript:

Redesignation of I-95 and I-295

Current I-95 and I-295 Designation I-95 spans from PA/NJ state line to Route 1 interchange Current gap results in I-95 motorists traveling on I-295 and I-195 I-95 continues on NJ Turnpike from I-195 interchange to NJ/NY state line 295 295 Current I-95 Route

I-95 and I-295 Redesignation I-95 will continue on New Jersey Turnpike Extension to new I-95/Pennsylvania Turnpike Interchange I-95 will be redesignated to I-295 from the I-95/Pennsylvania Turnpike interchange to the Route 1 interchange 295 295 Future I-95 Route

I-95 and I-295 Redesignation I-295 will be north/south in New Jersey and east/west in Pennsylvania I-95/PA Turnpike Interchange Where I-295 Currently Ends Where I-295 Will End

Renumbering Interchanges

Renumbering of Interchanges 7 interchanges in New Jersey and 4 interchanges in Pennsylvania will be renumbered and signs will be updated to reflect new route designations Exit numbers will correspond to new milepost markers on redesignated I-295 Intersecting Roadway Old Exit Number New Exit Number Princeton Pike 8 68 Route 206 7 69 Federal City Rd 5 71 Route 31 4 72 Scotch Rd 3 73 Route 579 2 75 Route 29 1 76 Taylorsville Rd 51 10 Route 332 49 Route 1 46 Route 1 Business 44 NJ Exits PA Exits

Example of What Renumbering Will Look Like Exits and overhead signs will change to reflect new exits and route redesignations Temporary “old exit” sign panels will be installed above overhead mounted signs and adjacent to ground mounted signs I-95 Old Numbering I-295 New Numbering

Sign Replacement in New Jersey

Sign Replacement Signs along I-295 will be replaced to reflect road designation changes. Signs will be replaced at approximately 250 locations

Overhead Sign Replacement Overhead signs will be updated to reflect the redesignation Guide signs, destination signs, exit subpanels and mile markers will be replaced to reflect redesignation of road and exit numbers

Trailblazer and Mile Post Marker Replacement Both trailblazer signs and mile posts will be replaced to reflect changes to route designation

Updating Signs on Intersecting Roadways Signs will be replaced on intersecting roadways to reflect redesignation

Reflecting NJTP’s I-95 Designation An I-95 shield will be added to New Jersey Turnpike signs north of exit 6

Renumbering Exit 60 to Exit 1 on I-195 Exit numbers on I-195/I-295 interchange will be changed to reflect mile posts on I-195

Exit 60 on I-195 will be re-numbered as Exit 1 to follow I-195 mileposts Exits 60A and 60B will become Exits 1A and 1B The exits that are currently 1A and 1B will become 1C and 1D Changes to I-195 Exits Intersecting Roadway Old Exit Number New Exit Number I-295 SB 60A 1A I-295 NB 60B 1B Route 206 SB 1C Route 206 NB 1D

Anticipated Construction Timeline Primary Responsible Party Project Timeline: Anticipated Construction Timeline Key Work Primary Responsible Party Phase 1: January - March 2018 Replacing signs in New Jersey starting at existing I-95 Interchange 8/ Princeton Pike and moving west toward the Delaware River NJDOT Phase 2: March - April 2018 Replacing signs on both sides of the Delaware River within the Scudders Fall Bridge project limits (existing I-95 Exit 1 in New Jersey and Exits 51 and 49 in Pennsylvania). DRJTBC/ PennDOT/ PTC Phase 3: April - August 2018 Replacing signs at the remaining interchanges through the new interchange in Bristol, PA PTC/ PennDOT/ NJTA

Late April 2018 to Early August 2018 I-95/PA Turnpike Interchange Project Timeline: January 2018 to Early March 2018 March – April 2018 Late April 2018 to Early August 2018 I-95/PA Turnpike Interchange

Project Timeline for New Jersey I-295 Exits: