Industry views on GRVA priorities and organization

Slides:



Advertisements
Similar presentations
ACSF - Traffic Jam Assist on all roads OICA and CLEPA proposal for the IG Group ACSF Tokyo, 2015, June Informal Document ACSF
Advertisements

Transmitted by the Experts of TRL (EC)
OICA „Certification of automated Vehicles“
Outcome TFCS-05 // May OICA, Paris
Co-Sponsors: China, Japan, EU and US 59th Session GRSP May 9-13, 2016
Common Understanding on Major Horizontal Issues and Legal Obstacles
Submitted by the expert form Japan Document No. ITS/AD-09-12
Initial project results: Annex 6 – 20 Sept 2016
REPORTING SDG INDICATORS USING NATIONAL REPORTING PLATFORMS
Industry proposal Driver availability recognition system
Submitted by UNECE Document No. ITS/AD-07-07
Status Report to GRB #68 Task Force on Reverse Warning issues
Real World Test Drive – OICA views
Real World Test Drive – OICA views
Final Report of TF-CS/OTA September The Amba Hotel, London
Outcome of TFCS-12 - summary slides - (detailed meeting minutes will be provided separately) April The Shilla Seoul, ROK.
TFAV Structure of Informal Group on Assessment of Automated Vehicles (AutoVeh) WP.29 cooperation Groupes de Rapporteurs (GRs) ITS/AD Liaison AutoVeh.
Industry views on GRVA priorities and organization
Informal document GRRF-86-36
Transmitted by the IWVTA Informal Group
ACSF Category B1 (LKAS) Concern with “Default-on” strategy
Submitted by OICA Document No. ITS/AD-14-07
Expansion of consideration target of ITS-AD IWG
Working Party on General Safety Provisions (GRSG) General information
Submitted by the Expert of Sweden
Submitted by the experts of OICA
Status of the Informal Working Group on ACSF
Proposals from the Informal Working Group on AEBS
Status of the Informal Working Group on ACSF
Working Party on Automated/Autonomous and Connected Vehicles (GRVA)
AEBS 4th Meeting UK Position Paper December 18 OFFICIAL-SENSITIVE
Status of the Informal Working Group on ACSF
High level objectives Overview Proposal for approach
Status report ‘Sub group 2’: Real world road test
Future Certification of Automated Driving Systems
Submitted by the experts of OICA
Transmitted by Co-Chairs of VMAD
Submitted by OICA Document No. ITS/AD Rev1
Main subjects: priority 1, 2, 3
New Assessment & Test Methods
Informal document GRVA st GRVA, September 2018
Participants/Address list
Proposals from the Informal Working Group on AEBS
SHORT-TERM ACTIVITIES
Report on Automated Vehicle activities
Status report of TF-CS/OTA
WP.29 and GRVA activities on Automated Vehicles
Discussion on the priorities
Industry input to ACSF 11th meeting March 2017, Berlin
Safety concept for automated driving systems
Proposals from IWG-R55 to GRRF-82
Informal document GRSG Rev.1
Definition of aysmax Interpretation 1
Overview of the recommendations on software updates
Highlights of the 177th WP.29 session and
Issues identified in connection with the work of TF-CS/OTA
Maximum allowable Override Force
Informal document GRRF-78-41
Inputs Regard to “Test Phase” to TFCS
ACSF-17 – Industry Preparation
Snow tyre activities - status report
ACSF B2 SAE Level 2 and/or Level 3
ACSF B2 and C2 Industry expectations from ACSF IG Tokyo meeting
Modular Vehicle Combinations Informal Working Group (MVC IWG)
Highlights of the 178th WP.29 session and
Regulation ECE R79-03 ACSF C 2-Step HMI
FIA position on Lifecycle of a vehicle type* vs. Lifetime of a vehicle
Informal document GRVA-04-34
EDR/DSSAD IWG Status Report
Status of discussion after 8th meeting
Presentation transcript:

Industry views on GRVA priorities and organization Submitted by the experts from OICA and CLEPA Informal document GRVA-01-28-rev 1 1st GRVA, 25-28 September 2018 Agenda item 4 Include developments during GRVA-01 session (added slide 6) Industry views on GRVA priorities and organization GRVA-01 - 2018, September 25-28 Geneva

Hands-off lane keeping on AD landscape - before June 2018 ACSF C HMI (industry) Stand-alone subjects RCM (UK) … WP29 GRRF ITS-AD IWG ACSF IG ACSF B2 Level 3/4 Hands-off lane keeping on Motorway AD level 3/4/5 Highway, Urban, Inter-urban AutoVeh TF SG 1 Test & Audit SG 2 Real world PTI ACSF TF (Swe) DSSA TF (UK) GRRF Task Forces CEL step 2 TF (UK) CS & OTA TF

Hands-off lane keeping on AD landscape - after June 2018 ACSF C HMI (industry) Stand-alone subjects RCM (UK) … WP29 GRVA ACSF IG ACSF B2 Level 3/4 Hands-off lane keeping on Motorway AD level 3/4/5 Highway, Urban, Inter-urban AutoVeh TF SG 1 Test & Audit SG 2 Real world PTI ACSF TF (Swe) DSSA TF (UK) GRRF Task Forces CEL step 2 TF (UK) CS & OTA TF

Level 2 hands-off lane keeping Industry input Missing items ACSF C HMI (industry) Stand-alone subjects RCM (UK) … Level 2 hands-off lane keeping WP29 GRVA ACSF IG ACSF B2 Level 3/4 Hands-off lane keeping on Motorway AD level 3/4/5 Highway, Urban, Inter-urban AutoVeh TF SG 1 Test & Audit SG 2 Real world HCV Trailers PTI ACSF TF DSSA TF GRVA Task Forces CEL step 2 TF CS & OTA TF Platooning

Industry input – Road map ACSF C HMI RCM 2020 2025 Level 2 hands-off lane keeping ACSF B2 Level 3/4 Hands-off lane keeping on Motorway (including CEL step 2, PTI ACSF, DSSA and general requirements for CS & OTA) PC/LCV HCV Indicative information, for discussion only. HCV Trailers CS & OTA new reg. AD Highway (based on 3-pillars) AD Urban AD Inter-urban Platooning (longitudinal) Platooning (Longi + lat.)

Industry input – GRVA day 2 ACSF C HMI RCM Current certification way: Test worst case vehicle configuration CEL Assessment (audit) One set of requirements per functionality Very low pace / (rather) design restrictive / not applicable to further steps Level 2 hands-off lane keeping ACSF B2 Level 3/4 Hands-off lane keeping on Motorway (including CEL step 2, PTI ACSF, DSSA and general requirements for CS & OTA) PC/LCV HCV New way to certify: 3 pillars Road test Track test Audit / Assessment Achieving a balance between a set of general safety objectives and relevant test scenarios for use cases (highway, urban, inter-urban): The objective is to define a modular frame for future developments, To cover different vehicle categories (e.g. PC, city buses, shuttles, trucks…) and use cases AD Highway (based on 3-pillars) AD Urban AD Inter-urban Platooning (Longi + lat.)

Considerations Generals Define priorities and road map Define the right organization to implement the road map Take into considerations limited resources (experts, secretariat, rooms, travels…) AD is not the only subject: AEBS M1 N1, Modular Vehicle Combinations… No double work Realistic deadline Review road map on a regular base and adjust priorities and resources when needed Concrete proposals – food for thoughts GRVA coordinates other GRs when it comes to AD related amendments Other GRs appoints an ambassador at GRVA, to synch the amendments