Chapter 5 Planning 1 1 1 1 1 1 1 1 1.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Chapter 17 Project Management McGraw-Hill/Irwin
Work Breakdown Structures
Project Management. Projects „Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame.”
CHAPTER 17 Project Management.
Advanced Project Management - CPH
5/4/20151 NETWORK SCHEDULING TECHNIQUES. 5/4/20152 Network Diagrams  PMI defines the scheduling process as: “the identification of the project objectives.
Project Management: A Managerial Approach
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
1 Project Management Inventory Management – In-class Example  Number 2 pencils at the campus book-store are sold at a fairly steady rate of 60 per week.
Project Management. What is a Project? One Time Effort Identifiable Start/End Points Specific Objectives Multiple Tasks Resources from Across the Organization.
Lecture Network Analysis
Roberta Russell & Bernard W. Taylor, III
Project Scheduling & Budgeting CEE 402 Engineers Without Frontiers Lecture 6 February 26, 2003.
Chapter 5 Planning. 222 Learning Objectives  Clearly define the project objective  Develop a work breakdown structure  Develop a network diagram 
Workshop-3 Gantt and Pert Chart.
Chapter 5 Planning
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Edward B. Farkas, Managing Director, Project Management Practice
Module 6 Session 6.1 Visual 1 Module 6 Preparing the Work Breakdown Structure (WBS), Responsibility Matrix, and Master Summary Schedule Session 6.1 Preparing.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Management Chapter Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame. Build A A.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Geog 469 GIS Workshop Project Management.
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Project Management.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
PROJECT MANAGEMENT Approaches
PROJECT MANAGEMENT Approaches By- Rahul Jain. Plan your work first…..then work your plan.
TK3333 Software Management
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Network planning models These project scheduling techniques model the project's activities and their relationships as a network. In the network, time flows.
Chapter 9 Planning. 222 Learning Objectives  clearly defining the project objective  developing a work breakdown structure  developing a network diagram.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
CRITICAL PATH METHOD - PRECEDENCE DIAGRAMS - SANDEEP DIGAVALLI.
Chapter 3 Managing the Information Systems Project
Chapter 16 – Project Management
PROJECT MANAGEMENT.
Introduction to Project Management Chapter 7 Managing Project Resources Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Chapter 5 Planning
Project Management Techniques
Chapter 17 Project Management McGraw-Hill/Irwin
Management & Planning Tools
Project Scheduling
Defining Scope, Quality, Responsibility, and Activity Sequence
forward scheduling or backward scheduling
Eleanor Roosevelt High School
PART SIX PROJECT MANAGEMENT Chapter Eighteen Project Management.
2nd Task of Your Project „All you have to decide, is what to do with the time that is given to you.“ J.R.R. Tollkin Prof. Dr. Christian Bleis 1 Interaktionskompetenz.
17 Project Management.
Project Activity and Risk Planning
CHAPTER 6 PROJECT TIME MANAGEMENT
Project Time Management
17 Project Management.
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Project Management Chapter 17
Project Management (lecture)
Drawing AOA and AON networks
P ROJECT M ANAGEMENT Skills.
Drawing AOA and AON networks
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Defining Scope, Quality, Responsibility, and Activity Sequence
Project Management (lecture)
Importance of Project Schedules
CHAPTER 6 PROJECT TIME MANAGEMENT
Scheduling.
Presentation transcript:

Chapter 5 Planning 1 1 1 1 1 1 1 1 1

Learning Objectives Clearly define the project objective Develop a work breakdown structure Develop a network diagram Utilize a project management methodology called the systems development life cycle for information systems development projects 2 2 2 2 2 2 2 2 2 2 2 2

Real World Example Vignette: Trojan Reactor Vessel Project: Remove, transport, and dispose of a full-sized commercial nuclear reactor weighing more than two million pounds Numerous planning studies were done on worker safety, public safety, transportation safety, and costs. The project was completed at a cost of $21.9 million, which was $4.2 million under budget, and $19 million less than conventional disposal methods. Effort won the International Project of the Year Award 3 3 3 3 3 3 3 3 3 3 3 3

Real World Example Vignette: Planning for Risk During the planning phase risks need to be identified, classified, and weighed. Some risk classifications include: technological, resource, organizational, and market risks. The severity of each risk should be investigated and measured. The probability of each risk should be considered. A contingency plan should be developed. 4

Project Objective Planning is an essential part of project management. In essence, the plan is a roadmap. The first step is to define the project objective. The objective must be clear, attainable, specific, and measurable. The objective is usually defined in terms of scope, schedule and cost. 5 5 5 4 5 4 5 4 4 4

Work Breakdown Structure (WBS) The second step is to determine what activities need to be performed. A list of all the activities must be developed. The WBS is a hierarchical tree of end items to be accomplished. A work item is one small piece of the project. A work package is the lowest-level item. 6 7 7 5 7 5 6 5 5 5

Responsibility Matrix Displays in tabular format the individuals responsible for the work items. “X” can be used to indicate who is responsible. “P” indicates who has primary responsibility. “S” indicates who has secondary responsibility. 7

Activities, Defined An activity is a piece of work that consumes time. 8 8 8 6 8 6 8 6 6 6

Developing the Network Plan After all activities have been defined, they are graphically portrayed in a network diagram. Two network planning techniques were developed in the 1950’s: Program evaluation and review technique (PERT) Critical path method (CPM) 9 10 10 7 10 7 9 7 7 7

Gantt Charts Gantt charts, or bar charts, are popular due to their simplicity. Activities are listed down the left-hand side. A time scale is shown along the bottom. 10 11 11 8 11 8 10 8 8 8

Gantt Charts (Cont.) Do not display the interrelationships of activities. If one activity is delayed, it is not obvious how that will affect other activities. Most project management software can show interdependencies with arrows. 11 14 14 9 14 9 11 9 9 9

Network Principals Different formats can be used to draw the diagram: Activity in the box (AIB) a.k.a. activity on the node (AON) Activity on the arrow (AOA) 12 16 16 10 16 10 12 10 10 10

Activity in the Box (AIB) Each activity is represented by a box. The activity description is written in the box. Each box is assigned a unique activity number. Activities have a precedential relationship. Some activities may be done concurrently. 13 17 17 11 17 11 13 11 11 11

Activity on the Arrow (AOA) Each activity is represented by an arrow. The activity description is written above the arrow. The tail of the arrow designates the start of the activity. The head of the arrow designates the completion of the activity. 14 18 18 12 18 12 14 12 12 12

Activity on the Arrow (AOA) (Cont.) Activities are linked by circles called events. An event represents the finish of activities entering it and the start of activities leaving it. Each event is assigned a unique activity number. 15 19 19 13 19 13 15 13 13 13

Dummy Activities Used in the AOA format. Consumes zero time. Represented by a dashed arrow. Needed for: Helping in the unique identification of activities. Showing certain precendential relationships. 16 20 20 14 20 14 16 14 14 14

Loops Not allowed because it portrays a path of activities that perpetually repeats itself. 17 21 21 15 21 15 17 15 15 15

Laddering Used for projects that have a set of activities that are repeated several times. 18 22 22 16 22 16 18 16 16 16

Preparing the Network Diagram Ask the following questions regarding each activity: Which activities must be finished immediately before this activity can be started? Which activities can be done concurrently with this activity? Which activities cannot be started until this activity is finished? 19

Preparing the Network Diagram (Cont.) Should flow from left to right. Not drawn to a time scale. Can vary in how detailed the diagram should be. AIB vs. AOA is a matter of personal preference. AIB is the most common in project management software packages. 20 24 24 17 24 17 20 17 17 17

Information System, Defined An information system (IS) is a computer-based system that accepts data as input, processes the data, and produces useful information for users. 21

Planning for Information Systems Development The systems development life cycle (SDLC) is used to help plan, execute and control IS development projects. Many people view the SDLC as a classic problem-solving approach. 22 25 25 18 25 18 22 18 18 18

Steps of the SDLC Problem definition System analysis System design System development System testing System implementation 23 28 28 19 28 19 23 19 19 19

Project Management Software Allow the project manager and the project team to plan and control projects interactively. Contain many common features: Create list of tasks Track resources Track budgets Generate a variety of reports 24