September CSC Beam Test Report

Slides:



Advertisements
Similar presentations
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Advertisements

Sector Processor – to – Muon Sorter tests M.Matveev Rice University January 8, 2004.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
13 March 2007G. Rakness (UCLA) 1 Minus side slice test status Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Summary of CSC Track-Finder Trigger Control Software Darin Acosta University of Florida.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Muon Port Card, Optical Link, Muon Sorter Upgrade Status M.Matveev Rice University December 17, 2009.
Test Beam Wrap-Up Darin Acosta. Darin Acosta, University of Florida 18 June 2004 USCMS Meeting 2 Agenda n Darin/UF: General recap of runs taken, tests.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
1 SCA Cell Utilizing Scheme The output of each preamp-shaper channel is sampled continuously at 20 MHz and stored the SCA cells. There are 96 cells for.
Tests of the Fully Loaded CSC Track Finder Backplane M.Matveev S.-J. Lee Rice University Alex Madorsky University of Florida 2 May 2005.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
Tridas Week, November 2000Darin Acosta1 Status of the CSC Track-Finder D.Acosta, A.Madorsky, S.M.Wang University of Florida B.Cousins, J.Hauser, J.Mumford,
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
University of California Los Angeles
Muon Track-Finder Trigger
“Golden” Local Run: Trigger rate = 28Hz
EMU Slice Test Run Plan a working document.
CMS EMU TRIGGER ELECTRONICS
University of California Los Angeles
University of California Los Angeles
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
CSC Muon Trigger - Annual Review
CSC Trigger Update Specific issues:
Darin Acosta University of Florida
VELO readout On detector electronics Off detector electronics to DAQ
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Primitives Test Beam Studies
Analysis of Oct. 04 Test Beam RPC Data
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
University of California Los Angeles
Changes in Level 1 CSC Trigger in ORCA by Jason Mumford and Slava Valuev University of California Los Angeles June 11,
Preliminary CSC Trigger Results from September Testbeam
CSC Trigger Meeting Summary
Sector Processor Status Report
FED Design and EMU-to-DAQ Test
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Plans for the 2004 CSC Beam Test
Presentation transcript:

September CSC Beam Test Report General report, TMB/SP comparisons, DT/CSC integration tests Darin Acosta 15 November 2018 Darin Acosta

Where to find information Documentation: http://www.phys.ufl.edu/~acosta/cms/trigger.html Includes scanned pages from log books and links to online log and other web sites Data: /castor/cern.ch/user/t/tbx5ccdr/ “rfdir” for listing “rfcp” for copying (may need to wait a long time as data is staged from tape) Runs 5018  5164 Correlated SP data starts with run 5108 15 November 2018 Darin Acosta

Beam Test of 2 CSC’s at X5a / Goal: complete electronic chain test of data transmission from CSC front-end electronics to the Track-Finder trigger, all operating synchronously with the 40 MHz structured beam MPC and SP included in tests, various clocking solutions tried 15 November 2018 Darin Acosta

CSC Peripheral Crate From front-end cards CCB + TTCRx MPC DDU 2 TMBs and DMBs (CSC id’s 3 and 8) 15 November 2018 Darin Acosta

CSC Track-Finder Crate CCB + TTCRx Sector Processor MPC for in-crate tests 15 November 2018 Darin Acosta

CSC Track-Finder Trigger Home-built VCXO & PLL clock patch added to clean incoming TTC clock for links, but TTC QPLL also tested Test 3 × 1.6 Gb/s optical link connections from CSC electronics Uses TLK2501 chipset Requires very stable reference clock for error-free operation 15 November 2018 Darin Acosta

Test Results Using home-built VCXO+PLL solution for 80 MHz reference clock to TLK2501 receivers: PLL locks to incoming machine clock (Once Bruce Taylor helped us set up the TTCmi crate correctly) Measured frequency: 40.078893(1) MHz No errors on optical links reported over many hours of PRBS and data tests Continuous data transmission or framed mode (idle frames sent) Data successfully logged by both CSC DAQ and CSC Track-Finder readout SP data FIFO synchronized to L1A 15 November 2018 Darin Acosta

TTC QPLL Mezzanine card (TTCRq) Three made available to CSC group for testing during Sept.03 structured beam test Provides stable clock signals at 40, 80, and 160 MHz at correct LHC frequency Installed on CCB with 40 MHz clean clock sent to backplane, 80 MHz clock sent by twisted pair to SP or MPC Noticed that CCB commands have 1 BX extra latency with TTCRq 15 November 2018 Darin Acosta

TTCRq (QPLL) Test Results QPLL 80 MHz clock directly to MPC transmitters Lev’s VCXO+PLL for SP receivers No link errors for 20 minute PRBS test QPLL 80 MHz clock directly to SP receivers MPC uses default clock multiplier No link errors for 15 minute PRBS test Successfully logged data for 10K events (run 5151) QPLL 40 MHz clock on TF crate backplane SP uses DLL in FPGA for clock multiplier Link errors observed in PRBS test TTCRq on CCB in peripheral crate TTCRm on CCB in TF crate Able to take data with same trigger efficiency (i.e. TTCRq works for peripheral crate as well) 15 November 2018 Darin Acosta

Data-taking Mode Most data logged using two independent DAQ systems: CFEB Control for DDU data  run00nnnn.dat SP DAQ for Track-Finder data  SPDAQ*.dat Maximum data rate limited to ~400 L1A/spill Main DAQ PC not as optimized as OSU’s dual-CPU with SCSI disks Maximum rate is coincidentally the same for both DAQs XDAQ version by Wilkinson, Tumanov, et al. also apparently logs data correctly Underlying SP code the same as for standalone DAQ since it was written using XDAQ All analysis of SP and DDU data done using the “DataFormat” packages 15 November 2018 Darin Acosta

SP Data Format 5 BX read out per L1A (most data on BX2) L1A BXN frame1, frame2 of LCT1 on BX2 frame1, frame2 of LCT2 on BX2 frame1, frame2 of LCT1 on BX3 ff05 f003 f000 f2e8 1 2 ff96 1 2 8163 2 2 ff0a 2 2 3038 2 f004 f2d6 1 2 ff97 1 2 8168 1 3 f60b 1 3 343d 15 November 2018 Darin Acosta

Comparison of TF Data with DAQ CSC Data from DAQ CSC Track-Finder Data CSC 1 CSC 2 15 November 2018 Darin Acosta

LCT BX Information from TMB From TMB Header information, use BXN at Pretrigger and the LCT BXN offsets to compute BXN for each LCT Run data through MPC simulation to compare with SP 15 November 2018 Darin Acosta

TMB – SP Data Comparison SP BXN – TMB BXN @ Pre-trigger = 44 typically Is this difference affected by CCB command delays? Empirically find: If LCT BX Difference = 0x1  Add +1 to TMB BXN If LCT BX Difference = 0x2  Add +2 to TMB BXN If LCT BX Difference = 0x3  Add -1 to TMB BXN Comparison between SP and TMB for all 5 BX read out by SP for every L1A match: Muon runs, 60K events: 98.3% agreement Pion runs with TTCRq, 10K events: 97.6% agreement Mismatches between TMB and SP data are in BX assignment only, not in LCT frames 15 November 2018 Darin Acosta

SP – TMB Mismatches Run5126, evt 25 (accel  on) DDU Data: TMB BXN @ L1A: 786 TMB BXN @ Pretrigger: 667 LCT0 BXN Diff: 1 LCT1 BXN Diff: 1 TMB: f70a 3037 TMB: e70a 3037 TMB BXN @ Pretrigger: 669 TMB: e617 803e TMB: 9617 803e SP Data: BX:713 BX1 M1: f70a 3037 BX1 M2: e617 803e BX1 M3: e70a 3037 Prediction is that LCTs from different TMBs differ by 2 BX But SP sees data on same BX (agrees with first TMB, not second) Note ghost segments: same strip/WG, different quality 15 November 2018 Darin Acosta

SP – TMB Mismatches, Cont’d Nearly all of the mismatches involve differing BX assignment for LCTs from the TMB for csc#8 Data frames are in agreement, however Excluding csc#8 in these cases and comparing TMB and SP for csc#3  near perfect agreement Just 32 discrepancies from an analysis of 60K events, where BX assignment of TMB for csc#3 differs For these mismatches, the SP usually has the LCTs on the central BX in the SP read-out So trigger data appears to be good! Conclusion for DAQ readout of TMB data: TMB #8 has BX error 2% of time TMB #3 has BX error 5×10-4 of time This increased to 5×10-3 for runs with TTCRq in Peripheral crate (which changed the timing) Could be 2 or more BX off from SP 15 November 2018 Darin Acosta

MPC Sorting Problem? 2 mismatched events had LCTs in different order in SP readout vs emulation: SP read out: M1: a180 3140 (frame1 frame2 of muon1) M2: a200 3438 M1: fd09 3038 M2: fd0a 3038 Emulation from Greg P. had the order swapped 15 November 2018 Darin Acosta

Other effects TMB/SP mismatch rate seems independent of ALCT delay setting (timing scan runs) When DDU errors occur in DAQ, lots of TMB/SP mismatches result SP DAQ FIFO sometimes fills up if L1A rate is too high Affected pion runs mostly BX counter still increments, but data is frozen at last event Need to add FULL flag to event header 15 November 2018 Darin Acosta

First DT/CSC Integration Tests DT TF transition card  CSC TF transition card 15 November 2018 Darin Acosta

DT/CSC interface Reminder: data is exchanged between the two systems for efficient coverage of the region 0.9 < || < 1.2 CSC sends 3 LCT’s/BX (52 bits) from ME1 to two 30° DT sectors DT sends 1 segment/BX (26 bits) from each 30° sector Signaling standard is LVDS at 40 MHz through SCSI cables and connectors Layout problem on CSC transition card meant connectors had to be attached on opposite side of board Cable connector had to be flipped 180° at one end so that signals are received on correct pins Only had time to make & test custom 1m cables Signals inverted in firmware to handle polarity change 15 November 2018 Darin Acosta

DT  CSC transmission test DT Data Source Card  DT TF  DT transition card  CSC transition card  CSC TF Data was received in a FIFO in the main FPGA of the SP mezzanine card BC0 marker sent on first data word Tested walking 1’s, walking 0’s, & simulated muon data All bits and clock were received, but some bits were swapped at DT output before being sent to CSC 15 November 2018 Darin Acosta

CSC  DT transmission test CSC TF  CSC transition card  DT transition card  DT TF Data is sent from Front FPGAs, bypassing LUTs, and delivered to CSC transition card Tested walking 1’s and walking 0’s DT TF has no FIFO to store received data Two dead TTLLVDS buffer chips on CSC transition card leads to 7 missing signals But signals are OK and in correct order on SP backplane connector Remaining signals are seen by DT TF, albeit with limited storage capability 15 November 2018 Darin Acosta

DT/CSC Conclusions Initial tests show that DT and CSC Track-Finders can exchange data First integration test between UF and Vienna (good check on documentation!) A few minor problems on both ends with swapped bits, connectors, and dead chips Tests should be repeated with longer cables representing situation in counting room Modified cables arrived too late at CERN for testing More sophisticated tests of synchronization procedure and Track-Finding with both CSC and DT data should be performed in future DT Track-Finder currently has only limited means of data storage 15 November 2018 Darin Acosta