Monday morning 08:30 Start of rephasing MD. Dry tests in the morning.

Slides:



Advertisements
Similar presentations
REPHASING TESTS DURING THE TWO BEAM IMPEDANCE MD P. Baudrenghien, J. Noirjean, T. Mastoridis 10/26/2012LSWG meeting 1 Oct 7 th,18:00 – Oct 8 th, 04:00.
Advertisements

Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
Injection issues overnight 10:50 Access  QPS & EPC  Vacuum leak SPS – magnet to be replaced Monday – cycling for FT and LHC only over the weekend 12:15.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Wednesday 8.9 External crossing angles:
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Wednesday September 14th
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Summary of week 7 Hardware Commissioning:
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Tuesday 11th September LHCb dipole presently fault off
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Thursday morning – optics correction
Machine availability reaching well over 80%
Tuesday TOTEM and transverse loss map (1) OK
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Monday – recovery from MKI flashover
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary of Week 13 G. Arduini, B. Holzer
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
Thursday morning 09:30 Dump of pPb fill.
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Lost at 12:05 to power converter (RTQX2.R1) problem
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Mike Lamont, Jorg Wenninger
Week 36 plan Todo’s: And also: 12+b injection.
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Tuesday 20 March 2012.
Monday February 28th 8h00: Injection
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Week 36 Machine coordinators R.Assmann, R.Bailey
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
Thursday :00: Physics fill from the night shift
Wire almost entirely through beam before BLM triggers dump
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Programme for Saturday 10 July
Summary Thursday h21: Stable beams fill #1303.
Planning for the week MO M P
Thursday morning 7:20 – 12:30 faults of BLM sanity check, RQX.L8 QPS trip and iris scanner in UJ47. Access: Pt 8 for ELQA on RQX.L8 (The voltage.
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Tuesday morning 08:30-09:00 Squeeze with probe.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Programme for Friday 9 July
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Thursday 22 September 2011.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC Morning Meeting - G. Arduini
Tuesday In the morning test cycle with probe for Q’ measurement.
Wednesday 23/2 Thanks CRYO!!!.
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Monday 27th August & night
Wednesday 14:30 Fill 2011 dumped.
Wednesday 6.10 Morning: Quench test at 450 GeV
Monday 5 July Morning: Continued with the Physics fill, 7b x 7b, 1e11/bunch Stable beams from 2:30 am to 13:30 : 11 hours.
Presentation transcript:

Monday morning 08:30 Start of rephasing MD. Dry tests in the morning. Firmware changes, software updates and debugging. 13:00 Starting beam tests at 450 GeV. 3 attemps with 6b/batch (1.6E11 p/bunch). In each trial filled with rings locked, then added 30 Hz on ring1 and -30 Hz on ring2, let crossing point slip (1 microsec - 330 m - in 13 seconds), locked the two beams back to same frequency, then applied a series of frequency bumps to make beams collide in desired place. P. Baudrenghien et al 11/15/2018 LHC 8:30 meeting

Monday afternoon Attempts: No. 1: dump when applying the +-40 Hz frequency bump (3E-4 dp/p): too large orbit deviation B1  SIS. No. 2: centred the orbit and reduced the amplitude of the frequency bumps to 20 Hz (1.5E-4 dp/p). Worked OK. Compared the RF measurements with the BPTX ATLAS and added offsets to converge to ATLAS BPTX reading zero. No. 3: with the calibrations from the second trial. "Collision" point converged nicely (BPTX reading 0.050 ns). Lifetime drop B2? No time left to try at 4 TeV. 11/15/2018 LHC 8:30 meeting

Monday evening 16:00 Switching to p-Pb setup. Lot’s of last minutes things to fix on both SPS and LHC sides. Extraction settings SPS, collimator thresholds, ADT, RF, rephasing (and trying to remember how all this should fit together with mixed species…) 20:48 Trying to inject Pb – circulating at first attempt. And ended up in the correct bucket. First Pb orbit 11/15/2018 LHC 8:30 meeting

Monday evening 21:00+ Setting up RF loop gains, ADT gains… After RF frequency trim on B2/Pb, SPS re-phasing does not converge anymore. To be fixed later… ADT setup 11/15/2018 LHC 8:30 meeting

Monday night 22:00 B1 dumped – vacuum valve IR4. Leak detection overnight – leak on bellow of the B1 wire-scanner. Attempts to varnish the leak failed, only a small reduction in pressure. 11/15/2018 LHC 8:30 meeting

Today Repair of leak in Pt4. Details and schedule will be worked and communicated by experts. Expect to be back Wednesday morning. VIP in Pt2. 10:30 Dry run of modes in p-A mode. AC dipole dry run. RF power tests – delayed. Program (decided after the 08:30 meeting): Wednesday : pA pilot physics, Thursday: high Beta, Friday: pA MD (1 shift). 11/15/2018 LHC 8:30 meeting