Georgetown county water and sewer district

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

PERMIT INTAKE Applicant is greeted by permit staff Permit staff determines nature of permit, assists in gathering forms, and begins calling necessary staff.
Subdivision Plat Submittals Subdivision Plat Submittals
This is a manual presentation. Click NEXT for the next slide, BACK for the previous slide.
MRWA 2013 ANNUAL CONFERENCE MAINE COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROGRAM.
Brown County Planning and Land Services Zoning Bill Bosiacki 305 E. Walnut St. Green Bay WI (920) Website:
Garfield County Temporary Employee Housing May 3 rd, 2007 Energy Advisory Board.
What Can Local Government Do?. Utah Agriculture Code 4-1-8(1) “the science and art of the production of plants and animals useful to man including the.
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
Alabama Dept of Public Health New Onsite Regulations Overview of Permitting Requirements.
Model Home Permitting and Temporary Certificates of Occupancy Orange County BCC January 27, 2015.
CITY COUNCIL WORKSHOP CITY OF MURRIETA USER FEE STUDY October 20, 2009.
WELCOME!! PERMIT CENTER ROUNDTABLE 2006 On Wednesday, February 22, 2006, the Permit Center hosted a Roundtable discussion with permit runners and builders.
Greenfield District Utility/RR Engineer, INDOT
General Overview of the Functions and Responsibilities Traffic Engineering & Permits Division.
Engineering and Technical Plans Description, process and standards Dh 2005.
Fresno County Fire Protection District. Fire Sprinklers Systems Residential – 13D October 30, 2007.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Britannia Village Flood Control System Information Meeting for Directly Affected Landowners February 5, 2009.
Mesa City Council Presentation October 2, PROPOSED REVISIONS TO TERMS AND CONDITIONS FOR THE SALE OF UTILITIES OUTSIDE CITY LIMITS Water Resources.
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
May 5, 2015 Water Resources Meeting Heather Gutherless Jefferson County Planning & Zoning
PLANNING DEPARTMENT CITY OF PEARLAND PLANNING DAY MARCH 13, 2008.
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
Board of County Commissioners PUBLIC HEARING December 2, 2008.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
Chapter 43 Construction Supervision Procedures. 2 Links for Chapter 43 Contracts Completion Notices Bids Inspections Loans Appraisals Change Orders Building.
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
Board of County Commissioners PUBLIC HEARING June 8, 2010.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
The ABC ’ s of the Development Review Process: Navigating the Bureaucratic Maze 2007 GPA Fall Conference.
Board of County Commissioners PUBLIC HEARING June 29, 2010.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
1 Revised Suggested Modification 3 CO-12 Prevent the disposal of animal waste, wastewater and other byproducts of human, crop-based-agricultural or equestrian.
Ordinance Amending Chapter 37 Orange County Code Utilities Department October 21,
Semi-Private Boat Ramp Facility and Conservation Area Impact Permit Requests Independence Community Association, Inc. Environmental Protection Division.
IT’S THE 11 TH HOUR And General Engineering is … HOLDING US UP!
Permit Process & Application Guide
Prepared by: Alex Fisch Planning Services Division.
Heritage Park Area Mandatory Connection Final Information Meeting March 14, 2016.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
1 New Territory Municipal Utility Districts Strategic Partnership Agreement Discussions With the City of Sugar Land.
Mountain Regional Water Rules & Regulations Overview.
“State Road 100 MPC Lots” Comprehensive Plan Amendment & Rezoning City Council Public Hearing November 17, 2015.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
1 Staff Public Workshops Fall 2011 Policy for Siting, Design, Operation and Management of Onsite Wastewater Treatment Systems San Luis Obispo: October.
How Much Does It Cost? Overview of Fees and Charges in the Water / Wastewater Industry Alex Hinojosa J. Stowe & Co. October 27, 2010.
Mandatory Connection 2 nd Information Meeting November 17, 2015.
EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project – Update Debbie Hoffman, PE Civil Engineer II March 23,
CSA 7 – Boulder Creek. YOUR SANITATION FACILITY Facility Includes the Following Five Pump Stations –Total of 10 pumps 16,553 feet of collection lines.
Grey Owl Municipal Water feasibility study
Storm Water Utility City of Durand.
Land Use Urban Service Boundary is the framework for managing growth.
Butte County Board of Supervisors December 6, 2016
Scoping Meeting April 20th 6:00 pm
CUP Pet Bazaar Animal Facility with outdoor area
Large scale development groundwater balance
Audie Murphy Road Sewage Lift Station Award of Construction Contracts
Proposed SEWER IMPACT FEES
Global Connections Day Building Safety Service Provider
Planning and Public Works Fee Changes for 2018
Council Orientation October 24, 2017
Washoe County Board of Adjustment
Regulation Amendment AM April 3, 2018.
Butte County Board of Supervisors November 8, 2016
National Association of State Conservation Agencies
Subdivision Applications
Presentation transcript:

Georgetown county water and sewer district Lunch & learn October 10, 2018

introductions Sign in sheet Introduce staff Introductions around the room

Agenda lunch Developer project process Developer project milestones What we need help with resources questions

DEVELOPER PROJECT process WATER AND/OR SEWER SYSTEM EXTENSIONS

Extension policy

Projects Required to follow district’s extension policy Any non-residential building larger than 1,500 square feet Any retail commercial business Any building requiring an internal fire sprinkler system, fire protection booster pump, standby fire line, or onsite fire hydrant Any building providing medical facilities or services (human or animal)

Projects Required to follow district’s extension policy Any facility preparing or providing food services Any facility discharging any waste other than domestic waste Any facility of an unusual nature so determined by the engineering department and confirmed by the executive director

Projects Required to follow district’s extension policy Any single-family lot subdivision or commercial lot subdivision or facility for which the district is required to make a determination of the availability of water and/or sewer service in keeping with SCDHEC code of regulations R61.57 Any multi-family development Any plat prepared for the subdivision, re-platting, or re- configuring of parcel lot lines resulting in 3 or more parcels

Projects not-Required to follow district’s extension policy If you are subdividing one parcel into 2 parcels and there is no water or sewer abutting the property.

Four MAIN PHASES LETTER OF INTENT (Loi) & SKETCH PLAN CONSTRUCTION PLANS & DELEGATED REVIEW PROCESS (drp) Construction CLOSEOUT

LETTER OF INTENT (Loi) & SKETCH PLAN PROJECT NAME DEVELOPER AND CONTACT INFORMATION CONSULTANT ENGINEER AND CONTACT INFORMATION PROJECT Description SIMPLE SKETCH OF PROPOSED MAIN LINE EXTENSIONS # of REU’S LOI FEE (Project will not be reviewed without fee)

LETTER OF INTENT (Loi) & SKETCH PLAN PREDESIGN APPROVAL 10% FEES WATER & WASTEWATER CONTRACTS Encroachment permits

CONSTRUCTION PLANS & DELEGATED REVIEW PROCESS (drp) Final Construction plan Use the plan review checklist

CONSTRUCTION PLANS & DELEGATED REVIEW PROCESS (drp) Construction permit application Waccamaw Neck 285 GPD Georgetown 300 GPD Only submit a complete package

CONSTRUCTION Shop drawings 90% fees due Preconstruction conference INVITE ALL UTLITIES, COUNTY AND SCDOT Inspection testing

Project Close Out Conveyance documents Close out documents Operation and maintenance letter for dhec

DEVELOPER PROJECTS milestones

What must I do to get a plat signed 100% impact fees paid All utilities installed and operational approval or 100% impact fees paid Dhec construction permits with letter of credit or cash deposit equal to 125% of the estimated cost to install the required utilities.

What must I do to get a building permit 100% impact fees paid All utilities installed and operational approval or Dhec construction permits with letter of credit or cash deposit equal to 125% of the estimated cost to install the required utilities. Pay connection fees for each building Only on every other lot Temporary waste disposal permit for each building No water or sewer service until operational approval (no construction water)

DEVELOPER PROJECTS What we need help with

What we need help with Record drawings Only submit complete drp packages Construction inspection Compaction Consider entire area when designing your subdivision Start closeout documents early

resources www.gcwsd.com Emails geanennek@gcwsd.com mattl@gcwsd.com richardp@gcwsd.com ernief@gcwsd.com tommiek@gcwsd.com

Any questions about anything?