Shifter Instructions regarding the ZD, Dan Peterson

Slides:



Advertisements
Similar presentations
Introduction to Multisim ECE 1020 Professor Ahmadi.
Advertisements

EH1 (AD 1&2, IWS, OWS) PMT Jul. 30 – Aug. 20 RollingGain Calibration Summary Zhe Wang (BNL) and Qing He (Princeton) Aug. 22, 2011.
MDC-II LVL-1 Trigger Khaled Teilab for the MDC Trigger Team.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 3, 2007.
D. Peterson, Cornell CLEO group meeting, Oct 23, Cornell Contributions to Infrastructure: Track Reconstruction Track Finding
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
An Introduction to CLEO Lora Hine – Education & Outreach Coordinator at the Lab for Elementary-Particle Physics Laura Fields – CLEO Graduate Student at.
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
SETTING UP YOUR BEAM IN THE EAST AREA The secondary beam lines are controlled partly by local electronics in the EBCR control room, partly from two Linux.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
Static Pressure Control Loop The purpose of the static pressure control loop is to maintain an optimal static pressure in the ductwork. The control loop.
Oct, 2000CMS Tracker Electronics1 APV25s1 STATUS Testing started beginning September 1 wafer cut, others left for probing 10 chips mounted on test boards.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
A.meneguzzo, 03 april 2002 LNL- MB3 chamber test with cosmic triggers Some results on the tests performed on the MB3 chambers produced in Legnaro are presented.
HCAL1 Status 2003 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance 2003 General design High Voltage system LED monitoring 2. Tests in muon halo beam.
BigBite Wire Chamber Test Xin Qian Duke University Feb 20th For TRANSVERSITY Collaboration Wire chamber Gas Cerenkov Shower system Scintillator Magnetic.
Run Coordination Report 4th RPC General Meeting (CMS week) Luigi BENUSSI, Hassan SHAHZAD, Nicolas ZAGANIDIS.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
AND/OR - Are MC and Data (in)consistent? - further analysis and new measurements to do - Effects on inefficiency evaluation 1 G. Martellotti 21/05/2015.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
February 07, 2002 Online Monitoring Meeting Detector Examines Should aid in: 1.Diagnosing problems early and getting it fixed 2.Making decisions on the.
1 EMC Trigger Summery from RunII and discussion for RunIII H.Torii, Kyoto Univ. ERT Lvl-1 meeting.
June 7, 2004Karen Dow CODA at Bates BLAST Data Acquisition.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
Anatoli Romaniouk TRT Test manual Some important information p. 2-3Some important information p. 2-3 Noise studies p.4-7Noise studies p.4-7 Operation with.
Dmitri Denisov D0 Weekly Summary: May 4th to May 11th  Delivered Luminosity and operating efficiency u Delivered 7.3pb -1 u Recorded 6.3pb -1 (86%) 
Валидация TRT DCS CONDITIONS SERVICE Евгений Солдатов, НИЯУ МИФИ “Physics&Computing in ATLAS” – 22/09/2010.
TPC ALARM HANDLER In addition to the big slow controls alarm handler I usually ran a TPC only alarm handler as a separate process. The TPC alarm handler.
ID Week 13 th of October 2014 Per Johansson Sheffield University.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
Vladimir Frolov (Centro Fermi) On behalf EEE-TO group.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
Checking On Production ©2009 Dr. B. C. Paul Note – These slides contain material from slides dating back to 2000 and also contains screen shots from the.
SCT Links Operation Performance from QA and operation
Calibration Instructions for Quarknet Cosmic Ray Detector
SurveyDIG 2.1 Tutorial.
THE CMOS INVERTER.
Operation of CSC DCS Ryan Carroll Carnegie Mellon 29-Sept-2009.
Grid Pix Field Simulations and precision needed for a module
MINERVA Z Mass Exercise
Journal 1/31/17 Objective Tonight’s Homework
Radio Quality Indication
RIKEN VTX Software Meeting
Statistical Process Control (SPC)
Introduction to the Backgrounds Study in the BEPCⅡ/BESⅢ
Saving, Modifying page, grammar & spell checking, and printing
Prepared by Kimberly Sayre and Jinbo Bi
Gel Electrophoresis Teacher Instructions BioRad Set Up 12 groups
SIDEBAR: PLANTS ABSORB A LOT OF LIGHT ENERGY…
CLEO-III Trigger Systematic Studies Progress Report – M. Selen
Hall C KPP Demonstration March 10, 2017.
BESIII EMC electronics
Performance of MDC during New Data Taking
The MIS and Dashboard.
Google Calendar Appointments
Google Plus Hangouts Skills: Start a Hangout on Air, invite participants, conduct Hangout Concepts: none We will begin with some examples of Google Hangouts.
Univerity of rome “Tor Vergata”
How to Start This PowerPoint® Tutorial
Getting started – Example 1
Pierluigi Paolucci & Giovanni Polese
Modeling with the normal distribution
Drift Chamber Monitoring
Status of DT Local Trigger Commissioning
Presentation transcript:

Shifter Instructions regarding the ZD, Dan Peterson Introduction The ZD is a 6 layer stereo drift chamber. Overexposure to radiation can damage it and is placed very close to the beam. The 10 layer OSU VD (1985-1998) was damaged by radiation. Let us not do that to the ZD. Shifter Instructions regarding the ZD, Dan Peterson 11/16/2018

Getting familiar with the CESR display This is the CESR display. Look around for it or ask the professional shifter. There are 3 things to look at: Radiation monitors (detectors are on the beam pipe) “star” plots 2) ZD layer currents there are “star” plots and numerical display (mA) 3) Beam life time (in minutes) blue=e-, red=e+ Shifter Instructions regarding the ZD, Dan Peterson 11/16/2018

Shifter Instructions regarding the ZD, Dan Peterson Before starting a run Before starting a run, the beams must be cool enough to not spray radiation all over the ZD. Before ramping the CLEO HV system from “FILL” to “RUN” the beam life time must be more than 50 minutes. Observe the beam lifetime on the CESR display here. Blue is e-, Red is e+. When the CESR operator says “tuning is complete” we are not ready; the HV should not yet be “sync’ed to cesr”. The numbers may be =0 or bouncing. Wait for beam lifetimes to be relatively stable and above 50 minutes. And, that is not all; see next page. Shifter Instructions regarding the ZD, Dan Peterson 11/16/2018

Shifter Instructions regarding the ZD, Dan Peterson Before starting a run, 2 There are 2 “star” plots of the radiation monitors, one for East, one for West. Both should show low radiation. The shape in the center should be collapsed to near zero. The physicist shifter watch this plot to ensure that the radiation level is low before the ramp to “run”. OK BAD Shifter Instructions regarding the ZD, Dan Peterson 11/16/2018

Shifter Instructions regarding the ZD, Dan Peterson The High Voltage GUI The HV GUI display should be displaying current as shown here. The DR3 is all between 4 and 5 mA. The ZD is all between 3 and 4 mA. This is almost all bleeder circuit current, 4.2 mA in the DR and 3.8 mA in the ZD. If the colors do not look like this, it should be noted. The blue channels here are bad supplies; the chambers channels are powered by jumpers to good channels. All is good. This is supply 7-13/14 which powers chamber 7-14. It always trips. Shifter Instructions regarding the ZD, Dan Peterson 11/16/2018

Shifter Instructions regarding the ZD, Dan Peterson High Voltage trips This is the HV trip window. The HV form should be maintained by the professional shifter and the physicist shifter. Write down the trip. Conform to the requested syntax. In this case write “ hour : minute DR 7-13/14 “ Shifter Instructions regarding the ZD, Dan Peterson 11/16/2018

Shifter Instructions regarding the ZD, Dan Peterson CLEO HV telnet windows You may be asked to look at the current levels in the telnet windows. Box 80, channels 9.1.0 - 9.1.7 is ZD layer 1 9.1.8 - 9.1.15 is ZD layer 3 9.1.16 - 9.1.23 is ZD layer 5 Box 81, channels 11.1.0 - 11.1.7 is ZD layer 2 11.1.8 - 11.1.15 is ZD layer 4 11.1.16 - 11.1.23 is ZD layer 6 Box 81, channels 12.1.8 – 12.1.23 are the ZD cathode wire layers, F1- and F6+. Shifter Instructions regarding the ZD, Dan Peterson 11/16/2018

Shifter Instructions regarding the ZD, Dan Peterson CLEO Event Display The full event is usually in a small window. This is a nice endcap Bhabha. Shifter Instructions regarding the ZD, Dan Peterson 11/16/2018

CLEO Event Display, close-up on the ZD The big window on the right will usually show the close-up of the ZD. The numbers indicate the number of TDC hits on the wires; “nTDC” in the dialog box. The bright numbers have a hit “in time”. The hits are not on the track because of the extreme stereo angle. This is a hot wire, but the rate does not interfere with collecting normal data on this wire. This is all normal. The physicist shifter should verify that Bhabha events look like this. Shifter Instructions regarding the ZD, Dan Peterson 11/16/2018

Shifter Instructions regarding the ZD, Dan Peterson The red-eye special We get “red-eye” events that look like this. This is sporadic electronic noise. Don’t get excited. Here is the one dead channel in the ZD. Here is the hot channel. However, is is bright; there is a hit in time. If it were really too hot, the buffer would be saturated with early hits and there would be no “in time” hit. Shifter Instructions regarding the ZD, Dan Peterson 11/16/2018

Pass1 monitoring, TRK page The scale is wrong. Don’t worry. normal This is the “TRK” page from the PASS1 monitoring shown on the left, and a blow-up of the layer efficiency for both ZD and DR3 on the right. Layers numbers –7, 0, and 48 are check channels, they represent the denominator of the efficiency calculation. Layers –6 through –1 are the ZD layers 1 through 6. Layers 1 through 47 are the DR3. The physicist shifter should verify the efficiencies look like this. Shifter Instructions regarding the ZD, Dan Peterson 11/16/2018

PASS1 monitoring, DR page This is the “DR” page (actually DR3) from the PASS1 monitoring shown on the left, and a blow-up of the “DR hits in time” on the right. The peak at about 100 is from Bhabhas and 2-track cosmics; 2 tracks at 50 hits/track gives 100 hits. It’s good, yes? The average number of early hits is less than 50 and the number of late hits less than 20, for a detector with 10000 cells! The physicist shifter should verify the “DR hits in time” look like this. Shifter Instructions regarding the ZD, Dan Peterson 11/16/2018

PASS1 monitoring, ZD page This is the “ZD” page from the PASS1 monitoring shown on the left, and a blow-up of the “ZD hits early” on the right. The average of “ZD hits early” should be 15 to 20; over 24 is cause for alarm. Note, the ZD has 20 early hits for a 300 cell detector, 7% occupancy. The threshold is set low. It is OK; they are out-of-time. The physicist shifter should verify the “ZD Hits Early” look like this. Shifter Instructions regarding the ZD, Dan Peterson 11/16/2018

Shifter Instructions regarding the ZD, Dan Peterson Tuning During Running The current policy is that we do allow CESR tuning while the ZD is in the “RUN” state. The CESR operator may adjust the betatron frequency, the “tune” by adjusting either the sextapole or quadrupole currents. In all cases, the goal is to increase beam lifetimes and reduce detector high voltage trips. The CESR operator will announce, and the CLEO operator will acknowledge when tuning starts. The CESR operator will announce, and the CLEO operator will acknowledge when tuning ends. Tuning may cause HV trips. There may be HV trips unrelated to tuning. Lack of tuning may cause HV trips. For any minor trip, notify the CESR operator, “CLEO has a high voltage trip that will be reset; we will not require ramp-down”. For any major trip, notify the CESR operator, “CLEO has a high voltage trip; we will ramp down.” In this case, the CLEO operator should negotiate with the CESR operator whether to a) continue running, b) continue running after some, possibly significant, tuning, or c) start a new CESR fill. The CESR operator shall notify the CLEO operator when it is “safe” to continue to RUN. CESR may request significant tuning at any time. In that case, CLEO is to go to the “FILL” or “OFF” state. When tuning is completed, CLEO may return to the “RUN” state. Shifter Instructions regarding the ZD, Dan Peterson 11/16/2018