LEED BD+C – Integrative Process

Slides:



Advertisements
Similar presentations
AIA Honolulu, LEED-CI Gold Intergen, LEED-CI Certified
Advertisements

Not Your Father’s Older Brother’s LEED: Energy & Commissioning Opportunities in LEED v4 Mark Gelfo, PE LEED AP BD+C, LEED AP O+M, CxA, EMP Director of.
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
LEED v4 Integrative Project Planning and Design
Chapter 9 Integrative Process 1 © 2013 Green Building Academy. All rights reserved.
Green Building Leadership in Energy and Environmental Design (LEED)
Introductions: Tom Boyd – Tonn and Blank Construction, LEED Green Associate Tom Boyd – Tonn and Blank Construction, LEED Green Associate Sr. Martha Ann.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
Building Enclosure Commissioning (BECx): Practical Project Implementation.
ASHRAE Guideline The Commissioning Process Building Commissioning Association Northeast Chapter Thomas Anderson, CCP.
LEED CERTIFICATION IN THE RETAIL ENVIRONMENT Maggie Benson and Isabelle Bouthillier Project By:
Sustainable Design & Construction at Yale University July 2009.
Sustainability and the Breuer Building Sustainability and the Breuer Building The Cleveland Green Building Coalition
New Live Learn Residence Hall. Current Grove With general placement of new building Create a reinvigorated role for The Grove in campus life.
LEED AP BD+C Made Easy 1 © 2014 Green Building Academy. All rights reserved.
Making the Case for Building “Green” Health Care Facilities O’Brien & Company Sponsored by the Business & Industry Resource Venture.
LEED EB, O&M and CT’s HP Schools Initiative April 2011 Presented By William Leahy, Director Institute for Sustainable Energy at Eastern Connecticut State.
LEED Independent Study 2008 Matthew Ziff, Associate Professor Interior Architecture Ohio University Presented by Alicia Westgerdes.
BECOMING GREEN Santa Margarita High School Academic Building.
Sustainable Core and Shell. Sponsored by: AIA The Corporate Realty, Design & Management Institute.
Green School Design Gary A. Jerue ED 846 Spring 2010.
SAINT PAUL SUSTAINABLE BUILDING POLICY Saint Paul Sustainable Building Policy Training Module Four Indoor and Outdoor Water Use.
April 5-May 17, 2011 Each Tuesday, 6:30-8 pm Pulaski Tech BIC 3303 E Roosevelt Road Registrar: Linda K. Smith Executive Director, USGBC Arkansas Chapter.
Concept of Energy Efficiency. Buildings, as they are designed and used, contribute to serious environmental problems because of excessive consumption.
1 Ohio School Facilities Commission Green Schools Initiative Presentation #2.
PRISHA PROPERTIES INDIA PVT LTD.
Learning by Design Using LEED to enhance teaching and learning.
Stormwater Academy: Green Roofs Green Roof Design and Operation Operation (Part IV) 2006 FSA Annual Conference June 14, 2006 By Marty Wanielista and Mike.
The Future of Commissioning for Sustained Building Performance Birmingham, AL SERBCA Fall Conference Proposed LEED Requirements for Commissioning.
The Role of Compact Storage in Green Building Design Program No.: CSGBD Provider Name: Spacesaver Corporation Provider No.: J197.
The 5 th Annual Conference on Total Building Commissioning 2009 Commissioning Changes in LEED 2009 Paul McCown, PE, CxA, LEED AP, CEM SSRCx, LLC.
The Monsanto Center LEED EB: Operations & Maintenance Silver Certification.
330 North Wabash EPA’S ENERGY STAR RATING ACHIEVED December, 2009  330’s Energy Performance is in the top 25% nationwide accomplished through:  No Cost.
Industrial Design, Sustainable Design & LEED
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Big Ten Sustainability Conference November 15-16, 2010 Energy Design & LEED Standards.
The Greening of the Rooftop Module 4 Green Building Rating Systems What Are They? How Do They Work?
Energy conservation strategies Buildings energy consumption depends on building envelop, efficiency of HVAC and lighting systems, amount of required fresh.
Energy Design of Buildings using Thermal Mass Cement Association of Canada July 2006.
Fundamentals of LEED v4 for
Advanced Energy Engineering Technology Modeling Building Energy Systems Session 7: Lighting and daylighting.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
Chapter 8 - Integrative Process
Green Materials for building construction  Materials or products that Minimize resource use  Materials or products with Low environmental impact  Materials.
Integrative Process Lori A. Brown, LEED AP BD+C – Power Jam Study!Lorisweb.com1.
Planning for LEED ® © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture Leadership in Energy and Environmental Design LEED ® and its related.
Fighting Fire with Fire: Fort Bragg Goes Platinum with a new LEED Fire Station Kim M. Fowler Senior Research Engineer Sustainable Design and Development.
MAPA Wednesday Webinar Everything you always wanted to know about LEED* *but were afraid to ask.
Uponor | LEED ® Review Dave Zweber Channel Marketing Mgr.
Fundamentals of LEED v4 for
Announcement: The Course Test is Net week ! On Wednesday, October 12 It starts at 1 pm sharp.
Building Environmental Systems
Objectives of a Green Building
Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 1.
Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 1.
BEEP Integrated Design Process for Energy Efficient Buildings
Why green? Let’s talk about why it is important to make green building a design and construction standard, and not an “added bonus.” What does “being green”
CMGT 380 Green Building Practices and LEED Certification
CMGT 380 Green Building Practices and LEED Certification
INTD409 Interior Environmental Technology Fall 2016/17
2- INTD409 Interion Environmental Technology
2- INTD409 Interion Environmental Technology Fall 2014/15
Concept of Energy Efficiency
LEED 2.2 for New Construction LEED 2.0 for Existing Buildings
LEED AP BD+C Made Easy Welcome to Green Building Academy’s LEED AP BD+C Examination preparation course LEED AP BD+C Made Easy © Conserve Green.
Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 1.
Need to Know these terms:
Leadership in Energy and Environmental Design (LEED)
Abigail Fluke, Shawnice Whitfield, Hannah Harrison
LEED Overview.
Presentation transcript:

LEED BD+C – Integrative Process LEED v4 Power Jam Study - lorisweb.com Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 1

Intent IP Prerequisite Integrative Project Planning and Design HC Intent Maximize opportunities for integrated, cost-effective adoption of green design and construction strategies, emphasizing human health as a fundamental evaluative criterion for building design, construction and operational strategies. Utilize innovative approaches and techniques for green design and construction. Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 2

Requirements IP Prerequisite Integrative Project Planning and Design HC Requirements Use cross-discipline design and decision making, beginning in the programming and pre-design phase. At a minimum, ensure the following process: Owner’s Project Requirements Document. Prepare an Owner’s Project Requirements (OPR) document. Develop a health mission statement and incorporate it in the OPR. Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 3

IP Prerequisite Integrative Project Planning and Design HC The health mission statement must address "triple bottom line" values—economic, environmental and social. Include goals and strategies to safeguard the health of building occupants, the local community and the global environment, while creating a high-performance healing environment for the building’s patients, caregivers and staff. Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 4

IP Prerequisite Integrative Project Planning and Design HC Preliminary Rating Goals. As early as practical and preferably before schematic design, conduct a preliminary LEED meeting with a minimum of four key project team members and the owner or owner’s representative. As part of the meeting, create a LEED® action plan that, at a minimum: Determines the LEED certification level to pursue (Certified, Silver, Gold, or Platinum); Selects the LEED credits to meet the targeted certification level; and Identifies the responsible parties to ensure the LEED requirements for each prerequisite and selected credit are met. Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 5

IP Prerequisite Integrative Project Planning and Design HC Integrated Project Team. Assemble an integrated project team and include as many of the following professionals as feasible (minimum of four), in addition to the owner or owner’s representative. Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 6

IP Prerequisite Integrative Project Planning and Design HC Design Charrette. As early as practical and preferably before schematic design, conduct a minimum four-hour , integrated design charrette with the project team as defined above. The goal is to optimize the integration of green strategies across all aspects of building design, construction and operations, drawing on the expertise of all participants. Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 7

Intent IP Credit Integrative Process NC, CS, S, R, DC, WDC, HOS, HC Intent To support high-performance, cost-effective project outcomes through an early analysis of the interrelationships among systems. Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 8

Requirements IP Credit Integrative Process NC, CS, S, R, DC, WDC, HOS, HC Requirements Beginning in pre-design and continuing throughout the design phases, identify and use opportunities to achieve synergies across disciplines and building systems. Use the analyses described below to inform the owner’s project requirements (OPR), basis of design (BOD), design documents, and construction documents. Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 9

Energy-Related Systems IP Credit Integrative Process NC, CS, S, R, DC, WDC, HOS, HC Energy-Related Systems Discovery: Perform a preliminary ― simple box energy modeling analysis before the completion of schematic design that explores how to reduce energy loads in the building and accomplish related sustainability goals by questioning default assumptions. Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 10

IP Credit Integrative Process NC, CS, S, R, DC, WDC, HOS, HC Assess at least two potential strategies associated with the following: Site conditions. Assess shading, exterior lighting, hardscape, landscaping, and adjacent site conditions. Massing and orientation. Assess massing and orientation affect HVAC sizing, energy consumption, lighting, and renewable energy opportunities. Basic envelope attributes. Assess insulation values, window-to-wall ratios, glazing characteristics, shading, and window operability. Lighting levels. Assess interior surface reflectance values and lighting levels in occupied spaces. Thermal comfort ranges. Assess thermal comfort range options. Plug and process load needs. Assess reducing plug and process loads through programmatic solutions (e.g., equipment and purchasing policies, layout options). Programmatic and operational parameters. Assess multifunctioning spaces, operating schedules, space allotment per person, teleworking, reduction of building area, and anticipated operations and maintenance. Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 11

IP Credit Integrative Process NC, CS, S, R, DC, WDC, HOS, HC Implementation: Document how the above analysis informed design and building form decisions in the project’s OPR and BOD and the eventual design of the project, including the following, as applicable: Building and site program; Building form and geometry; Building envelope and façade treatments on different orientations; Elimination and/or significant downsizing of building systems (e.g., HVAC, lighting, controls, Exterior materials, interior finishes, and functional program elements); and Other systems AND Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 12

Water-Related Systems IP Credit Integrative Process NC, CS, S, R, DC, WDC, HOS, HC Water-Related Systems Discovery: Perform a preliminary water budget analysis before the completion of schematic design that explores how to reduce potable water loads in the building and accomplish related sustainability goals. Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 13

IP Credit Integrative Process NC, CS, S, R, DC, WDC, HOS, HC Assess and estimate the project’s potential nonpotable water supply sources and water demand volumes, including the following: Indoor water demand. Assess flow and flush fixture design case demand volumes, calculated in accordance with WE Prerequisite Indoor Water Use Reduction. Outdoor water demand. Assess landscape irrigation design case demand volume calculated in accordance with WE Credit Outdoor Water-Use Reduction. Process water demand. Assess kitchen, laundry, cooling tower, and other equipment demand volumes, as applicable. Supply sources. Assess all potential nonpotable water supply source volumes, such as on-site rainwater and graywater, municipally supplied nonpotable water, and HVAC equipment condensate. Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 14

IP Credit Integrative Process NC, CS, S, R, DC, WDC, HOS, HC Implementation: Document how the above analysis informed building and site design decisions in the project’s OPR and BOD. Demonstrate how at least one on-site nonpotable water supply source was used to reduce the burden on municipal supply or wastewater treatment systems by contributing to at least two of the water demand components listed above. Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 15

IP Credit Integrative Process NC, CS, S, R, DC, WDC, HOS, HC Demonstrate how the analysis informed the design of the project, including the following, as applicable: plumbing systems; sewage conveyance and/or on-site treatment systems; rainwater quantity and quality management systems; landscaping, irrigation, and site elements; roofing systems and/or building form and geometry; and other systems Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 16