Summary week 41 (MD) Weekend of physics

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
LHC Status Tue Morning 22-Aug
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont
Machine Coordinators: G. Arduini, J. Wenninger
Saturday :12 Stable beams fill 3351 Initial luminosity
Monday fill with 1092 bunches (6 h stable beams)
Summary week 23 Luminosity production
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
Thursday morning – optics correction
Barbara Holzer, Jorg Wenninger
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Summary of week 22 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Thursday morning 09:30 Dump of pPb fill.
Summary of Week 16 G. Arduini, J. Wenninger
Bernhard Holzer, Joerg Wenninger
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Coordination by E. B. Holzer & J. Wenninger Production
Mike Lamont, Jorg Wenninger
Thursday 10th May - morning
Wednesday 8th August & night
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Tuesday 20 March 2012.
Week 35 – Technical Stop and Restart
Summary week 29 VdM scans Luminosity production
Friday 14th December - morning
Monday Morning – recovery from cryo.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
LHC Morning Meeting - G. Arduini
Finally.... We had to wait a long time.... We had many problems....
Not the most productive 24 hours on record
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Wednesday 10/5 Cryo recovery until 18:30
Tuesday Access for RF & QPS (others in the shadow) until ~18:00.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Monday 24 October hours of 25ns MD
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Summary week 18 Intensity ramp up & production
Saturday 3rd November - morning
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Thursday – Morning Energy matching at injection with H CODs
LHC Status Tue Morning 22-Aug
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Week 25 Summary Coordinators: Mike Lamont and Barbara Holzer
Wednesday 23/2 Thanks CRYO!!!.
Saturday 24 September 2011.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Monday 27th August & night
Wednesday morning / afternoon
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Saturday 26 November 2011.
Tuesday
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Presentation transcript:

Summary week 41 (MD) Weekend of physics Jan Uythoven, Jorg Wenninger Giulia Papotti, Frank Zimmermann

Weekend overview Started with LHCb polarity switch (to ‘good’ polarity). Mini-conspiracy against LHC efficiency. COD surv. OFSU ALICE Q6.L7 MKI8 TDI Feedbacks, S67, SPS RF 11/16/2018 LHC 8:30 meeting

Saturday 07:00 LHCb polarity switched to + (PC). 08:00 – 12:00 Mixed bag of issues with OFC, OFSU, Optics server, Q systems and S67 trip (spurious RB EE trigger). 12:00 – 15:30 SPS RF problems. Test cycle with 78b and new LHCb polarity. 16:15 First attempt dumped in the ramp by COD current surveillance. Surveillance had not switched to the correct settings, it seemed to be stuck on High-beta (most likely). This is the only ‘hangover’ from the MD. 18:20 Second attempt - short stable beams for final adjustments of LHCb separation. 11/16/2018 LHC 8:30 meeting

Vacuum in MKI8 now good enough to inject first beam 1 Saturday evening 20:50 MKI8-D spark (& vacuum spike) during TL steering. 22:00 Extended Softstart (conditioning) of MKI8, followed by test injection. 23:00 Another Softstart . Spark Injection test Softstart Vacuum in MKI8 now good enough to inject first beam 1 (for ALICE) 11/16/2018 LHC 8:30 meeting

FBs in the spotlight 01:00 Ramp… 01:50 OFSU crash just after end of squeeze. Emergency dump by SIS. 03:00 Injecting again. 05:00 Replay: OFSU crash just after end of squeeze, while turning off OFB. Emergency dump by SIS. Expert called, no evident problem, reboot OFSU machine. Interlock adjustment in SIS Sunday morning: Implemented, tested (during ramp-down) and deployed a modification of the SIS protection against OFSU crashes in ramp and squeeze : no action when PC’s are IDLE. Interlock ‘fine tuning’... 11/16/2018 LHC 8:30 meeting

Sunday 06:30 Filling again. 07:50 Stable beams fill 3178, 7E33 cm-2s-1. 10:00 Dump by RF crowbar on M2B2 (spurious). Reset and go again. 11:00 Filling. 12:00 Beam dump while retracting TDI Pt2 (ring1 full). Since TDI was moving correctly to parking and back in beam, we try again. 12:50 Our preferred dumps come in pairs… TDI Pt2 dumping again during retraction. 11/16/2018 LHC 8:30 meeting

Sunday 13:00-16:00 Investigations on TDI in Pt2. Problem on LVDT 1 of LU corner for the TDI in IP2. The beam was dumped when moving the TDI to parking, probably a glitch on the faulty LVDT violating the dump inner limits. LVDT 1 should have be exchanged but this would have required an access of at least 2 h. A. Masi switched the controls to LVDT 2. This exchange required to reset the position and energy thresholds around the new sensor readout (C. Bracco). No impact on the position of the TDI!! 11/16/2018 LHC 8:30 meeting

TDI PT2 Saturday Sunday 11/16/2018 LHC 8:30 meeting

Frankfurt book-fair intermezzo 11/16/2018 LHC 8:30 meeting

Sunday evening 16:15 Filling again. Ramp, squeeze all fine… OFSU problem, reboot needed. Ramp, squeeze all fine… 17:52 Dump by ALICE BCM, just before launching collisions. No signs of losses or UFOs on LHC side. Some difficulties to reset BCM after the event. ALICE BCM A side ALICE BCM C side 11/16/2018 LHC 8:30 meeting

Sunday night 21:00 Refilling. OFSU problem, reboot needed. 23:00 Stable beam fill 3182, L ~6.8E33 cm-2s-1. CMS off by 1 sigma (again). Oscillating back and forth. ALICE initial L > 10. 02:00 25 ns satellites at level of 1% for B1, 0.5% for B2. 03:15 Dump, QPS on Q6.L7B1 B1 satellites 11/16/2018 LHC 8:30 meeting

Sunday night – Monday morning 03:30 During pre-cycle trip of RBs (QPS) of S67 (at 200 A). Restart. 05:00 No beam from PS, POPS again. 06:00 Filling again. TL steering. 07:00 Filling for physics. 08:00 Lost at start of squeeze. Problem with orbit FB, most likely OFSU – investigating. 11/16/2018 LHC 8:30 meeting

Fills of the weekend 7 hours of SB out of 48 hours (15 %), 136 pb-1. Day L (h) Nb Int L (pb-1) Dump 3169 Sa 0:30 78 0.5 OP. LHCb test fill. 3178 Su 2:10 1374 48 RF – crowbar M2B2. 3182 4:15 QPS Q6.L7B1 7 hours of SB out of 48 hours (15 %), 136 pb-1. Lost: Fill Day Mode Dump reason 3168 Sa Ramp COD current interlock (wrong reference?). 3175 Su Squeeze OFSU crash at end of squeeze 3177 3181 Adjust ALICE detector 3184 Mo Orbit FB/OFSU – to be understood. 11/16/2018 LHC 8:30 meeting

Overall status – small corrections wrt last Monday 11/16/2018 LHC 8:30 meeting

Downtime – bathtub curve Day Length System Comment Mo 8h RF Line 3B1, 40 MHz clock missing. 5h SPS Transformer exchange. Tu 6h QPS/EPC RB.A12 , switch of RCD.A12B2, RD34.LR3 3h Cryo Cryo valve on Q4.L5 Fr 7h LBDS LBDS B1 MKD_F Sa 2h FB OFC,OFSU,Q & S67 RB EE mixed bag MKI MKI8 spark Su TDI LVDT TDI B1 ALICE BCM powering QPS Q6.L7B1, RB S67 EE, PS POPS 22h 25h A few RD2.LR2 trips when at standby current (free wheel diode). Not seen anymore over the weekend. 5 OFSU crashes/issues in little over 24 hours. Worrying. 11/16/2018 LHC 8:30 meeting

Beam Dump Energy tracking interlock Friday 16:30 Correct Dump at 4.0 TeV Afterwards cannot arm LBDS because of Beam Energy Tracking System (BETS) Interlock on compensating voltage Limit at injection is 1.0 %, error > 2 % and creeping up Access: not clear if problem at power converter. Apply global correction factor on setting from PLC, change of 0.35 %. This brings energy tracking within limits over complete energy range 4 % Energy 4 Tev = ± 0.5% Interlock limit at injection = 1 % -1 % 15/10/2012 LHC 8:30 meeting

LBDS checks on generator MKD-F Back again around midnight after test ramp and test dump at 4 TeV Since then energy tracking on this generator stable (see chart prev. page) Slightly larger error than before intervention, but still ok. The actual kicker waveforms are stable and the same as before (see below) XPOC checks always pass Still unpleasant situation that something suddenly happened which is not understood On first occasion check generator and power converter again, possible interventions to follow Although we have the full redundancy of one generator (14/15 kick still ok) F 15/10/2012 LHC 8:30 meeting

Transfer lines Again rather frequent steering of both transfer lines. Recurrent since the last TS. Note : SPS dipole in sextant 3 is developing inter-turn short. At end of TI8 some BPMs with larger offsets in H plane lead to almost permanent latches on injections. Some bunches out of tolerance on one BPM. Not correctable with CODs, probably requires correction including the MDI. TBC. 11/16/2018 LHC 8:30 meeting

Tune systems We now have distinct tune systems for low intensity beams (FFT3) and for standard beams (FFT2). FFT2 has the potential to be gated (e.g. 6 first bunches). Q’ measurement on FFT3 / low intensity B2: Sign is wrong due to UDP packet latency. Will be fixed this week. Some issues with state control changes. States are important to define which system (FFT2/FFt3) is used for QFB. FESA class? 11/16/2018 LHC 8:30 meeting

Pending operational development ADT bandwidth increase. Gated BBQ (probably parasitic). Batch-by-batch longitudinal blowup at injection. RF phase modulation over 1 turn. Bringing beams into collision longitudinally. Fill(s) with shorter bunch length (impedance, heating…). Strategy to be defined. Ideally down to 1 ns. 11/16/2018 LHC 8:30 meeting

Pending access requests Access system PAD UJ43 (S.di Luca). B2 BGI : UX451 for a camera replacement. 1 hour. BSRT : tunnel. No time estimate. BBQ: UA43/7. Short. LVDT TDI Pt2. Tunnel, 2 hours. LBDS MKD-F-B1: check PC and generator. UA63. Radmon installation between Q5 and Q6 at IP1. 1 hour access, few hours pre-warning. Impact 21253 / D. Macina. ATLAS : ~3 hours. Impact 21251. ALICE. RD2.L2 – diodes: few hours after a fault. 11/16/2018 LHC 8:30 meeting