S.Ecklund, C.LeCocq, R.Pushor, R.Ruland, A.Seryi, Z.Wolf

Slides:



Advertisements
Similar presentations
MONALISA: Interferometric Position Monitor at the Nanometre Scale David Urner Paul Coe Matthew Warden Armin Reichold Oxford University.
Advertisements

Development of a mover having one nanometer precision and 4mm moving range Y. Morita, S. Yamashita ICEPP, University of Tokyo Y. Higashi, M. Masuzawa,
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
1 IR Vacuum M. Sullivan MAC Review Jan , 2006 M. Sullivan for the Machine Advisory Committee Review January 18-20, 2006 IR Vacuum.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
13 Dec MAC Review – Future IR Heating Issues 1 Future IR Heating Issues 13 December 2004 Stan Ecklund.
The 2nd Tevatron Electron Lens and tests of a new electron gun in the framework of Beam-Beam Compensation project Yu. Alexahin, V. Kamerdzhiev, G. Kuznetsov,
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
ATF2 Progress Report For CLIC Workshop Kiyoshi KUBO.
Electric Motors. Current in a wire Creates its own magnetic field Interacts with another field Force on the current carrying wire Rotational motion.
Alignment and Beam Stability
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,
Slow Ground Motion Studies at Fermilab James T Volk Accelerator Division Andrey Chupyra, Shavkat Singatulin, Budker Institute of Nuclear Physics Vladimir.
J. Turner 02/07/05 SLAC PEPII Accelerator Physics LER WIGGLER PLAN J. Turner, M. Donald, M. Sullivan, U. Wienands, J. Yocky Motivation and Concerns Details.
Active Vibration Stabilization for the NLC Final Focus Quads Josef Frisch, Linda Hendrickson, Thomas Himel, Andrei Seryi,
NLC - The Next Linear Collider Project SLAC tunnel motion and analysis Andrei Seryi SLAC Originally given at The 22nd Advanced ICFA Beam Dynamics Workshop.
J T Volk Fermilab April 2008 Ground Motion Studies at Fermi National Accelerator Laboratory James T Volk Applications Physicist II Vladimir Shiltsev, Shavkat.
International Workshop on Accelerator Alignment Jim Volk Valentin Ivanov Shavkat Signatulin Virgil Bocean Gary Coppola Rick Ford O’Sheg Oshinowo George.
Andrei Seryi, 10/10/03, PEP-II MAC mtg. 1 PEP-II IR2 alignment S.Ecklund, C.LeCocq, R.Pushor, R.Ruland, A.Seryi, Z.Wolf With big help from A.Acosta, F.Brown,
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Collimation Working Group #137 Collimator Alignment Controls Patrick Bestmann20/02/2012.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
IR Heating Issues Stan Ecklund 4 August PEP-II Run 4 Post Mortem IR Heating Issues2 Overview of IR Heating Issues Vertex Bellows –Cooling added.
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
A New Stripline BPM Design for the ILC IR Fast Feedback (?!) – For discussion: A metal/ceramic brazed BPM pickup – 9/19/2007ILC IR Engineering Design Workshop,
Beam Background Simulation at Belle/KEKB Motivation SR background Particle background Feedback to the detector design SR alarm Summary O. Tajima (Tohoku.
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
Alignment and stability session
ALIGNMENT OF THE NEW TRIPLETS
In Vacuum Magnetic Field Measurement System for CPMU of HEPS-TF
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
Intensity dependence of Beam size at IP and Wakefield in ATF2
on behalf of the CLIC active pre-alignment team
TEST MODULE WG Cradles for CLIC module supporting system
Orbit Control For Diamond Light Source
Workshop on Tau-Charm at High Luminosity
M. Sullivan for the SLAC SuperB Workshop Jan , 2009
Ben Cerio Office of Science, SULI Program 2006
Some movement monitor systems at DESY
Vertex Detector Mechanical R&D Design Questions and Issues
Proposal for a Transparent Off-Axis Injection Scheme for BESSY II
Michael Sullivan and John Seeman SLAC National Accelerator Laboratory
Beam-based alignment measurements
The PEP-II Interaction e+e- Factories Workshop
Potential Use of PEP-II Magnets by Project X
SCU Next Phase Meeting July 8, 2014.
Compensation of Detector Solenoid with Large Crossing Angle
Interaction Region Design Options e+e- Factories Workshop
Draw a picture to answer the following: if you were on the Moon, the Earth would: Show phases the same as the Moon (when the Earth sees a full Moon, the.
J. Seeman Assistant Director for PPA/LCLS
Feedforward correction to injection bump error in the SPring-8
High Level Physics Applications for LCLS Commissioning
Summary of Washington DOE Review
IR Lattice with Detector Solenoid
LCLS Undulator System Status and Schedule
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Linac Diagnostics Commissioning Experience
LCLS Undulator System Status and Schedule
Fixed Support Design & Testing
Physics Requirements for Conventional Facilities
Alignment Diagnostic System Status
G.H. Wei, V.S. Morozov, Fanglei Lin Y. Nosochkov (SLAC), M-H. Wang
Upgrade on Compensation of Detector Solenoid effects
Presentation transcript:

S.Ecklund, C.LeCocq, R.Pushor, R.Ruland, A.Seryi, Z.Wolf PEP-II IR2 alignment S.Ecklund, C.LeCocq, R.Pushor, R.Ruland, A.Seryi, Z.Wolf

Event flow Motivations IR orbit correctors show correlation with current – IR magnets move? Spring 2003 => tiltmeters installed on IR quads observe motion correlated with current SR heating vacuum chamber => expansion => push magnets August 2003 : decided to install new systems in IR Hydrostatic level system Stretched wire system Laser tracker system This talk: Data from 3 systems => reconstruction of IR magnet motion Next: Orbit motion modeling, optimization of orbit correction or feedforward. Possibly, cure the cause of motion Consider only vertical motion. Horizontal data, and data from laser tracker are being analyzed and are not discussed in this talk.

BINP HLS @ SLAC sect.10 BINP HLS @ FNAL MI8 Hydrostatic system developed by BINP for slow ground motion characterization for NLC joint study by BINP, FNAL, SLAC A. Chupyra, A. Erokhin, M. Kondaurov, A. Medvedko, V. Parkhomchuk, E. Shubin, S. Singatulin, Budker INP J. Lach, D. Plant, V. Shiltsev, J. Volk, Fermilab R. Ruland, A. Seryi, SLAC Stretched wire systems developed for LCLS. Both HLS and wire system are foreseen to be used at LCLS

Left A Backward <= e+ Stretched wire. Sensors. Hydrostatic sensors Tiltmeters

Right B Forward <= e+ Laser tracker Tiltmeters Hydrostatic sensors

Left side. Stretched wire system. Q5 Q4 Hydro sensors

Right side. Targets Laser tracker Q5 Q4 Hydro sensors on the raft. Tiltmeters

IR magnet motion – “hydro” data The left raft motion is correlated with current(s), but not much the right raft. Slope is changing more significantly than the center of Q5 position. IR Motion expressed as a vertical slope (pitch) and position of the raft Slope: positive slope = end of raft closer to IP lifts up. Raft position is recalculated to the center of Q5 quad (positive position means the raft is higher). Horizontal axis => day of 2003.

Left side moves significantly more than the right one, the motion is correlated with current (mostly LER), is observed by hydro, wire and tiltmeter systems, and correlates with IR orbit feedback signals

Left Right Raw data Left side motion is caused primarily by LER– whose SR shines onto the left side Left Right Correlation with LER current easier to see in the moments of different behavior of LER and HER currents

Reconstruction of IR motion Left side moves most Were lucky to install wire on the left side! Hydro system on the raft, wire and titmeters on magnets allow to reconstruct motion of magnets Is there only common pitch of the raft and no magnet motion relative to the raft? Considered and rejected as unsupported by data Is there transverse flexibility between Q2 and Q1 that would affect wire data? Considered and rejected. Q2-Q1 is rigid transversely Shown below is a preliminary but consistent model of IR magnet motion

Left raft IR magnet motion model Model: on top of hydro data (motion of raft as a whole) add relative motion to be consistent with wire and tiltmeters. Example of magnet position for two extremes. The raft pitch change by about 30 mrad, the magnet position change by about 120 mm. Most of deformation occur near Q2.

Left raft motion model details of the fit to wire data Measured wire data Modeled wire data Model: use common pitch of the left raft, + relative on raft motion, dependent on the common pitch, to predict and make best fit to the stretched wire data.

Left raft motion model details of the fit to tiltmeter data Measured tiltmeter data Modeled tiltmeter data Model: use common pitch of the left raft, + relative on raft motion, dependent on the common pitch, to predict and make best fit to the tiltmeters data.

Left IR magnet motion model AVI GIF

Summary and next steps Installation of new alignment monitoring systems in IR-2 allowed to determine details of IR magnet motion Most of the fast (current-correlated) motion is on the left raft, due to LER SR, supposedly heating chamber near Q2 Next step is orbit modeling and optimization of orbit correction and location of correctors. Possibly, with use of feedforward from alignment systems. Can this motion be cured? Re-steer orbit? (but there are many restrictions on orbit position…) Mechanical design modification? …