New Specifications for 2017

Slides:



Advertisements
Similar presentations
B. Progress Schedule Schedule Costs –2002 C&MS … the cost of preparing and updating the schedule is incidental to all contract items. –2005 C&MS.
Advertisements

Bob Smith, P.E. Region 1 Benjamin Acimovic, P.E., Region 1
Innovative Contracting
Back to the Future? Electrical/Lighting Contracts Ted Swansegar.
TRAFFIC MANAGEMENT Tender and Construction Phase
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
Created by: Victor Lund, PEKen Johnson, PE, PTOE St. Louis CountyMnDOT.
Asphalt Quality Task Force Update Regional Asphalt Seminar David P. Shiells, P.E. District Materials Engineer.
Uniform Paving Platform Regional Asphalt Seminar, Blacksburg, VA March 12, 2015 David P. Shiells, P.E. District Materials Engineer.
Contract Law 2014 NCHCA Education Series- January 23, 2014 Presented by Geoffrey Cantello, City of Ottawa and Ron Price, Rasmussen Starr Ruddy LLP.
Regional Asphalt Seminars Pavement Wedge Guidelines and Specifications EMMETT R. HELTZEL, P.E. STATE MAINTENANCE ENGINEER.
OneOffice has provisions to add Pay Items for modifications to the Contract by Supplemental Agreements, Change Orders and for work covered by Standard.
Engineers/Contractors Meeting Lexington, KY Steven Criswell Division of Construction.
On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.
1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State.
Construction Engineering 221 Contracts & Contractor Procurement.
Change Orders. Build the project that was bid and awarded.
Materials Specifications & Virginia Test Methods (VTM’s) 2014 Regional Asphalt Seminars Rob Crandol, P.E. Statewide Asphalt Program Manager.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
LPA CONSTRUCTION ADMINISTRATION CONSTRUCTION PROJECT ENGINEER TECHNICAL SESSION PATRICK PIJOR & CASSANDRA VAN HORN APRIL 20, 2011.
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
CONTRACTUAL FLOW DOWN OF DPAS PRIORITY RATINGS
Procedural Requirements For Force Account Work on Federal and State Projects 2015 ACCA Conference Orange Beach, Alabama.
Discussion Topics Construction Contract Administration Other Construction Issues Questions? / Comments (Anytime)
FUEL AND ASPHALT COST ADJUSTMENT PROVISIONS. Use of Cost Adjustment Provisions FHWA Technical Advisory Dec 10, 1980 –“Price volatility of construction.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Allen Hughes State Materials Office
Working Successfully With Property Managers: An Interactive Engagement
PROPERTY MANAGEMENT RAZE & REMOVAL. PROPERTY OWNER HAS FIRST RIGHT OF REFUSAL n The property owner has first right of refusal to retain and move their.
Materials Specifications & Special Provision Changes 2015 Regional Asphalt Seminars Rob Crandol, P.E. Assistant State Materials Engineer.
Greg Kelley, Assistant Deputy Director Los Angeles County Department of Public Works SOUTHERN CALIFORNIA SUSTAINABLE PAVEMENT PRESERVATION ROUND TABLE.
Estimates and Quotes Apply procedures to develop plans, estimates and quotes Objective 4.03 Remember key terms, abilities needed, and items included in.
Project Schedules The Cabinets New Categories of Scheduling.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
2003 Warranty Presentations Caltrans WARRANTED HMA PAVEMENTS PAVEMENTS.
1 WSPP EC SLIDES FOR AGENDA ITEMS 3 AND 4 WSPP SERVICE SCHEDULE C WSPP Service Schedule C includes a provision allowing interruption “to meet Seller’s.
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
Measurement and Payment
Trenton M. Clark, P.E. Director of Engineering Virginia Asphalt Association.
Keith Roberts, P.E. Project Implementation Engineer IDOT – District 9.
Policy Updates July 25, Corrective Action Policy Name change – officially Corrective Action Structured framework for consistent way to address policy.
DISTRICT AUDITING UPDATE INDIRECT COST AND TIME DISTRIBUTION Melissa A. Austin, Audits Manager SC State Department of Education Office of Finance District.
UNIVERSITY OF PALESTINE FACULTY OF APPLIED ENGINEERING & URBAN PLANNING CIVIL ENGINEERING DEPARTMENT ENGINEERING PROJECT MANAGEMENT CHAPTER 3 INTRODUCTION.
HORTICULTURE II - LANDSCAPE Unit B Landscape Design.
ALL GROWN UP PROJECT ADULTHOOD Matt Looney Section Engineer’s Meeting Spring 2014.
SCHEDULE MANAGEMENT MODULE 8. Required by Specification City/Caltrans Level 1 schedule – simple Less than $1 million, less than 100 working days Advanced.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS
ALDOT Specifications Update
David P. Shiells, P.E. District Materials Engineer
MnDOT AUDIT COUNTY HIGHWAY ACCOUNTANTS
Runway Rehabilitation: Award of construction contract and acceptance of 3 grants Resolution June 22, 2009.
Administration of a FIDIC Contract - Financial Management
Review of Revised SP 150 – Traffic Control Dated February 01, 2017
Total Reinforcment Solution “So you can work on something else”
Traffic Control Plan Development Course
Panel discussion Date.
PATRICK PIJOR & CASSANDRA VAN HORN APRIL 20, 2011
4SR7 Emergency Bridge Repair Program Overview
Longitudinal Joint Construction – Why Straightness Matters
County State Aid Needs.
Introduction to Procurement for Public Housing Authorities
SECTION EXISTING CONDITION PHOTOS
Cost Containment Working Group Board Update
ISDEAA - P.L SECTION 105(l) LEASE PROPOSALS
Eric M. Reimschiissel Contractors working with Agencies
Boon Snapshot The Boon Group® is a full-service employee benefits company specializing in the design, implementation and administration of cost-effective.
Presentation transcript:

New Specifications for 2017 Ray Johnston Central Office Construction

New Specifications New Asphalt Joint Straightness SPCN Flagging Measurement & Payment Rideability Incentive Disincentive for plaining in multiple lanes Tack and non-tracking tack added to Asphalt Price Adjustment

Flagging Lump Sum MOT in Schedule Projects ALL flaggers which could have been reasonably expected to be needed at the time of bid are included in the lump-sum payment for Maintenance of Traffic. Specifically: A good reference is TTC-67.0 om the VWAPM for intersection flagging. If something unexpected happens requiring additional flaggers, as directed by the engineer (church revival, huge sale at adjoining mall, etc.), those flaggers will be paid at 145% Davis-Bacon wage rate in the Contract, or in effect on Ad date if not in Contract. Flaggers for the Contractor’s convenience are not paid for (since it’s lump-sum anyway).

Disincentive for plaining in multiple lanes Just like last year, establishes a $5,000 per day disincentive for leaving milled surfaces open longer than allowed (24 hours for regular planing, 96 hours for performance planing). What’s changed is that the intent is clarified that the disincentive is only to be charged when the milled surface is left open through conditions within the Contractor’s control.

Tack and non-tracking tack added to Asphalt Price Adjustment S109G10 – Asphalt Material Price Adjustment. Includes Tack Coat and Nontracking Tack Coat in the list of items eligible for a price adjustment.

Rideability SP315-070100-01 and SP316-040200-01 Prohibits repair work before Department’s initial rideability test (Engineer can approve remove and replace) Removes examples of acceptable repairs, leaving it as approved by the Engineer Does not impact schedules this year but we are currently working on a revision to the special provision.

New Specifications New Asphalt Joint Straightness SPCN Flagging Measurement & Payment Disincentive for plaining in multiple lanes Tack and non-tracking tack added to Asphalt Price Adjustment

Douglas.mcavoy@vdot.virginia.gov VDOT State Specifications Engineer Questions ? Douglas.mcavoy@vdot.virginia.gov VDOT State Specifications Engineer