Network Rail South East Route Performance for NTF 22 October 2014

Slides:



Advertisements
Similar presentations
RELIABLE SUPPLIERS Supply Chain Management and Procurement policies in place Supply Chain Management and Procurement policies in place Register all suppliers.
Advertisements

Legacy of the 2012 Games Ben Plowden Director of Surface Planning Transport for London.
2015/06/091 Overview of Maintenance & Infrastructure Delivery of Eskom Overview of Maintenance & Infrastructure Delivery of Eskom Eng Logan Pillay Eskom.
 PRASA’s Strategy identified short, medium and long-term interventions to improve rail services in the country.  PRASA identified operational interventions.
Railway Safety Plan and Its Status in Korea
RAILWAY INDUSTRY TRAIN PLANNING LEVEL 2 TRAINING Module 7 Engineering Overview.
THE PLANET99 MODEL DEMAND AND REVENUE FORECASTING TOOL FOR RAIL OPERATORS 8th EUROPEAN EMME/2 USERS CONFERENCE Jeremy Douch GIBB Transport Planning May.
Winter Operations GENEVA CASE AIRPORT OPERATIONS IN EXTREME WEATHER CONDITIONS (winter )
First Capital Connect St Albans City & District Council Overview & Scrutiny (Public Services) Committee 13 July 2011 Neal Lawson Managing Director First.
International Conference on Critical Infrastructure Protection Helsinki 4-5 October ‘07 ‘Future partnerships in critical Infrastructure protection’ Charles.
RAILWAY INDUSTRY TRAIN PLANNING LEVEL 2 TRAINING Module 9 - The TOCs and Network Rail.
FTA Transport Manager Introduction The Highways Agency and the Strategic Road Network Risks to resilience Ensuring resilience during all types of.
Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton.
0 Christopher A. Pangilinan, P.E. Special Assistant to the Deputy Administrator Research and Innovative Technology Administration, ITS Joint Program Office.
West Anglia Rail Services Hertfordshire County Council Scrutiny Panel 20 May 2010 Geraint Hughes Stakeholder Manager.
First Capital Connect London Borough of Merton Public Transport Liaison Committee Tuesday 26 October 2010.
February 2008 Gemini Incident Overview. Agenda Focus this part of the presentation is on the system elements of last year’s Gemini incident :-  Briefly.
Mind the Gap – Human Factors and the Platform Train Interface
Operations & Maintenance Working Together. To CP4 and beyond...
Demonstrating Digital Railway
Transport for London 1 Climate Change – Impact on Transport Network Users Helen Woolston London Climate Change Partnership, Transport for London.
Aberdeen City Briefing 13 th May Project Scope – Phase 1 Transport Scotland’s specification for delivery by Mar 2019: Half hourly service between.
PowerPoint Title Sub heading if required Northern Powerhouse Rail Freight meeting 17 th May 2016.
 The 20 Year Plan for the SW Peninsula Rail Network Philip Heseltine Head of Transport, Infrastructure and Investment, Plymouth City Council On behalf.
NHS Student Bursaries ARC SAM 14 March Introduction Changes to NHS Bursary Scheme Rules for 2014/15 Timetable of events for universities’ submission.
The need for the scheme: congestion
High Speed Rail Some Development Principles
Logistics Planning WFP Logistics, We Deliver.
Overview of the Network
Train Performance Challenges
Paratransit and Emergency Response
Network Rail Infrastructure Limited Interim Results 2006/07 1 April – 30 September November 2006.
Parents’ Forum Thursday 14th June 2016
1. Monitoring & Early Warning System
Senior Management Leadership Programme Review and next steps
Preparedness WFP Logistics, We Deliver.
SWT 458/5 conversion project
Rail Service Update Peter Jermany Principal Planner (Planning Policy)
Presentation Title: View > Header & Footer
Principal Contractor Licensing Scheme Standard
ScotRail Alliance Performance Improvement Alliance
FTPE Performance Recovery
Gautrain System from An Operator’s Perspective
Change Assurance Dashboard
Pacific Power Seismic Preparedness Update
Logistics Planning WFP Logistics, We Deliver.
Wheel Flats on Abellio Greater Anglia Autumn 2015
CMG India Annual Conference 2016
Speech from Becky Hewitt
Pete Glass – Head of Performance Strategy (EMT)
Partnerships and networks
Update to NLAG board 24th November 2015
East Coast Route Study November 2016 update.
CRUE – The Way Forward Vicki Jackson
ALGA National State of the Assets Project
GWR Performance Structure
Red and Orange Future Reliability
Delivering work safely in limited time windows
Arriva Group Best Practice e
Bay of Plenty Regional Council
DPI Must Win Route Best Practice Sharing Updates – Feb17.
Kent Route Study – Draft for Consultation
GEML SOBC GEML Rail Conference July 2019
Great Eastern Mainline
Phil Emonson | Flood Resilience Lead
TIPS REGARDING FORMATTING
Pete Glass – Head of Performance Strategy (EMT)
That person will have been involved in the planning of the work.
Regional Operations Forum Setting the Stage
Western Rail Link to Heathrow
Presentation transcript:

Network Rail South East Route Performance for NTF 22 October 2014 Paper A2 16-Nov-18

Period 6 Performance Result Southeastern PPM - Industry Trajectory PPM Target PPM Actual PPM v Target PPM v Last Year PPM v Last Period PPM - Period 92.2% 89.3% -2.9% -3.3% -2.4% PPM - MAA 88.7% 87.4% -1.3% -3.6% -0.3% Southern 89.8% 89.0% -0.8% 0.0% -0.9% 85.5% 84.4% -1.1% -3.4% 0.1%

Flooding at Balcombe, Haywards Heath – Preston Park Current Situation 29 Landslips STORMS Flooding at Balcombe, Haywards Heath – Preston Park

Train Performance – Lead TOC PPM Forecasts Where are we going: What gets us there: 16-Nov-18

Southeastern; Current PPRP plan & closing the gap   PPM Projections P7 P8 P9 P10 P11 P12 P13 2013/14 Actuals 92.7% 81.7% 82.9% 77.5% 86.6% 83.3% 89.4% Current 2014/15 Targets 92.2% 86.2% 83.0% 87.0% 88.5% 90.6% 92.0% Current MAA - if target met 87.4% 87.7% 88.0% 88.4% 88.6% 89.0% 89.3% Q2 Period Target 89.2% 83.8% Q2 Projected MAA 87.8% 88.8% 89.5% The annual PPM MAA target is unlikely to be achieved. There is a huge focus on driving performance improvement in challenging circumstances. The biggest challenge is the introduction of the January 2015 timetable. The second quarter review between Se and NR has just taken place. This identified a number of positive measures that have been taken and how further mitigation will occur to reach 89.5% (viewed as high confidence end of year result). Whilst we expect PPM MAA to improve as we drop out poor periods 8, 9 and 10 from last year; this is dependent upon the delivery of robust Autumn performance. We will continue to develop plans within the Performance Strategy and build on two clear successes during this quarter: Removal of TSRs London Bridge Maintenance Unit Delivery Plan New initiatives for Southeastern and Network Rail to maintain and improve performance include: Improved usage and extension of RCM to monitor points and digitalisation of Track Circuits. Signaller workshops to improve competence and reduce regulation errors. Competence training for fleet engineers to reduce own goal fleet failures.. Identification of maintenance / delivery / cancellation plans for lines of route to reduce knock on delays from passengers boarding and alighting due to cancelled trains. Continued reduction of the maintenance backlog in the London Bridge area by continued access initiatives. Development of working relationships between land sherrifs, MOMs and Se REOs to reduce crime further. Improvements in gateline management to reduce anti social behaviour and consequent delays.

Southern; Current PPRP plan & closing the gap There is a huge focus on driving performance improvement in challenging circumstances. The biggest current challenge is the reduced infrastructure capacity at London Bridge, really bringing into acute focus the balance between train service capacity and performance PPM Projections P7 P8 P9 P10 P11 P12 P13 2013/14 Actuals 89.90 80.40 81.80 73.10 79.20 77.10 86.20 2014/15 Targets 88.60 82.00 80.10 79.30 83.60 88.50 91.40 MAA - if target met 83.90 84.00 84.40 84.70 85.60 86.00 The second quarter review with Network Rail is underway. We will work together to develop new performance schemes to bolster the current PPRP plan. Whilst we expect PPM MAA to improve as we drop out poor periods 8, 9 and 10 from last year; this is dependent upon the delivery of robust Autumn performance. There are strong plans in place for fleet, traincrew and stations performance improvements. New initiatives for Southern and Network Rail to support then current year PPRP plan include: Additional station staff into key locations where small minute delays occur. These staff will have specific performance improvement related duties and will reduce delays associated with passenger loadings at busy times and deliver PPM benefit. Introduce more effective disruption management plans at London Victoria. London Bridge TLP Improvement Plan. Traincrew improvement plans – Traincrew marshals, increased in & out crew workings at London Bridge, increased headcount. Improved service contingency plans. Deep dive performance review. Fresh approach on diamond assets.

Key Risks and Mitigations: Southeastern Implementation of January Timetable / Thameslink Programme Passenger Boarding at key interchanges. TDM impacts Increased mileage of fleet Timetable Change London Bridge / Lewisham passenger flows Winter Resilience Rainfall Snow & Ice Fleet Delivery Mitigations January Timetable: Agency Staff at key interchange stations to support passengers for first month of operation of Jan TT. Communications plan to passengers around options of interchange. Removal of majority splitting / attaching in Timetable. Modelling of London Bridge passenger flows with agreed movement plan in place before January. Timetable Implementation Group formed with Network Rail to manage in timetable change. Training complete for ill passenger management and cut and run incident management. Less crew changes at London termini. Simplified HS workings when on NR infrastructure. 2 minute headway on approach to London Bridge starting from NKE in London direction. Introduction of 12 car services on metro fleet. Train turnaround times of 9 minutes from CX and C St. Joint plan and preparation Increase in locations with CRH Fleet preparation for winter KRS preparation for new timetable Changed maintenance delivery schedule. Trains running in longer formations 16-Nov-18

Key Risks and Mitigations: Southern Thameslink Programme – London Bridge • Extensive reviews have taken place into LL07 Blockade and lessons have been learnt and are now feeding into LL09 Blockade plans. • London Bridge Improvement Plan in place, this is being monitored on a weekly basis by a joint NR/Southern working group. • Changes made to the timetable in the short term and permanently from Jan 2015. • Trains taken out of the timetable to allow a more robust delivery of the service. Infrastructure Reliability • Diamond assets' programme now has a dedicated programme and resource. Fleet Reliability • Ongoing work is being undertaken to understand systemic fleet failures with new rolling stock, we expect to see an improvement over the next few periods. Traincrew related performance impacts - Driver briefings for LL08-LL09 new infrastructure layout means 14 drivers per day are released from duty. • Additional Production Manager posts introduced at London Bridge. • Additional cover drivers introduced to assist during disruption. • Daily conference call to discuss cover arrangements. External delays - Fatalities • Work with NR fatality prevention team to reduce number of fatalities and suicide on the network. Seasonal Preparedness - Autumn delivery - Winter plans • Joint plans have been put in place for both Autumn and Winter. • Response Plans developed in conjunction with Control for all weather related events. • Upcoming Re-signalling Schemes - Arun Valley - East Sussex - Balcombe • Head of Major Programmes is working with Network Rail to finalise mitigations. • Contingency plans to be developed. 16-Nov-18

Thameslink Programme Post August commissioning faults: 1/9 faulty relay 3/9 loose wire connection to relay (pic 1) 8/9 faulty insulated block joint (pic 2) 15/9 incorrectly installed points insulation 30/9 loose wire connection All have been reviewed and actioned New Timetable concerns Southern PPM has dropped at London Bdg Timetable is at the limit of layout capacity Construction TSRs didn’t help (now off) Weekly meeting NR / Southern to review all aspects of operation 2min passenger differential applied to all morning peak services from 13/10