HEATING, COOLING & WATER HEATING PRODUCTS

Slides:



Advertisements
Similar presentations
3.60 CEREC Connect Lab Import
Advertisements

If you press this you attach a files. This window will come up when the attach file button is pressed. You can then press browse and pick a file that.
February Reviewing and Approving an Expense Report Press F5 to begin the slide show. Slides will automatically advance.
Polycom Quotes on Demand Tool Partner User Guide Version 1.1
MSP Quick Reference Guide: Agency/Buyer
National Insurance Agency Producer Training January 21, 2009.
Procurement Card Training Strategic Account Management (SAM)
1 of 6 Parts of Your Notebook Below is a graphic overview of the different parts of a OneNote 2007 notebook. Microsoft ® OneNote ® 2007 notebooks are digital.
Using the Unity 98 Cordless Response System Directions : Courtesy of IHC public relations.
GroupWise Tutorial What is GroupWise? GroupWise is an and calendar service (much like Microsoft outlook) for Collin College faculty and staff.
Toll Free: Project Manager Tutorial.
ECHECK REQUEST APPROVER GUIDE Updated 08/10/2013https://enet.miami.edu.
Using Interact!. OPENING THE NECESSARY SOFTWARE To access the Interact service, you need to use software entitled “FirstClass.” Click and hold the Apple.
Career Services Center Employer Training. This is the main login page. The link can be found at Employers.
December 2010Brad Hudson AO3 Homework Task > All you need to know about sending s.
Open the Goodyear Homepage Click on Teacher Tools.
TimeTrex Electronic Signature Process. Welcome to the new totally electronic TimeTrex System The purpose of this presentation is to explain how the electronic.
Pack Company Procedures. Accepting a HIP request from a supplier Allocating the Component Providers Sending the instruction through to the Component Providers.
Creating a backup file Downloading a backup file Uploading a backup file Resetting or restoring your course from a backup file.
Confidential Web Ordering Overview. Confidential LOG ON:   Enter your login name &
At the Workforce Development and Continuing Education Student Menu select Register for Noncredit course(s) under Registration.
January 2006Colby College ITS Setting Up Course Pages.
Microsoft ® Outlook 2000 Integrating Outlook with Office Applications.
1 of 4 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2006 Microsoft Corporation.
Invitation to Qualify Training Services CONTRACT  Begin Date August 15, 2011  End Date December 31, 2016  Enrollment Period Ongoing.
screen shots Emma Jarman. Adding attachments What is an attachment? An attachment is an that has a file attached to it. The file could be.
Sorting Contacts with Categories Lunch and Learn.
Reliance PPAP Application. Reliance - PPAP The PPAP application is designed to generate and track the entire Purchase Part Approval Process. Reliance.
This is the Home Page, enter your username and password.
ULTIPRO RECRUITMENT: LISTS Prepared by Ordette Allen.
Instant Enrollment Tutorial Updated March 21, 2012.
1 After completing this lesson, you will be able to: Create and edit hyperlinks in worksheets. Save worksheets and workbooks as Web pages. Send workbooks.
Reply to Registration Invitation ( )
eCHECK Request Approver Guide
SCC P2P – Collaboration Made Easy Contract Management training
DSQR Training Reliance System
Student SOLE Page – Living Page
Request for Quote & Build Configuration
Role: Resource Manager (RM) RM Maintenance in AIM
SUBMITTING A PAYMENT REQUEST FORM
Expense Report Training
Microsoft Outlook 2000.
At the Workforce Development and Continuing Education Student Menu select Register for Noncredit course(s) under Registration.
DrayWatch Training November 2009.
Reliance Supplier Corrective Action Process
Weil-McLain’s Warranty Website
Requisition Entry Guide
Rogers Sourcing Supplier Login Process For Returning Users
New MyFD JV Feature Demo Webcast August 1, 2018
2016 File Maker pro training for Summer program hiring
Polycom Quotes on Demand Tool Partner Manager Guide Version 1.1
Expense Report Training
Request for Quote & Build Configuration
SCC P2P – Collaboration Made Easy Contract Management training
To the ETS – Encumbrance Online Training Course
Request for Quote & Build Configuration
Expense Report Training
Reliance Supplier Corrective Action Process
Supplier Nonconforming Material Report (SNCR) Process
Supplier Nonconforming Material Report (SNCR) Process
ADVANCED GUIDE TO ING This guide is for people who can already use and send to a good standard but cant use the more advanced.
Approvers - Requisition
To the ETS – Encumbrance Online Training Course
Approving Time in Kronos Manager/Supervisor Reference Guide
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Mylan Quick Reference Guide (QRG) February 2016.
Cayuse IRB - Initial Training
How to Consent to Receiving Electronic Disclosures
How to manage approvals in Chrome River
Transmitting statistical data
Presentation transcript:

HEATING, COOLING & WATER HEATING PRODUCTS DSQR Training PPAP Bill Kennedy Corporate Quality

Reliance System - PPAP Initiating a Supplier PPAP Once logged in, to initiate a new PPAP click the PPAP icon.

Reliance System - PPAP Initiating a Supplier PPAP To initiate a New PPAP, click the drop down button on the toolbar, and select the corresponding document.

Reliance System - PPAP Initiating a Supplier PPAP Suppliers MUST fill out the top section of the PPAP Initiation Form

Reliance System - PPAP Initiating a Supplier PPAP Initiation Contact Info This section pertains to the general document information: Supplier Name – Enter supplier name. Quality Contact– Enter your quality contact information. Location – Enter your location information.

Reliance System - PPAP Initiating a Supplier PPAP Initiation Contact Info (Continued) EC Number– N/A to supplier Part Name – Enter name of part Part Number – Enter number of part Drawing Revision– Enter the revision number if a revision has been made Review Date – This field allows the author to identify a date on which the document should be reviewed after its approval. By default, it is set at one year Estimated Date for Production – This field allows the author to define a date for production

Reliance System - PPAP Initiating a Supplier PPAP Fill out Change Information Fill out the sections for the desired change as well as the reason for the change. Move to Rheem Review Phase Click on the Supplier PPAP Review button to send the document to the next phase.

Reliance System - PPAP Initiating a Supplier PPAP Move to Rheem Review Phase A pop-up dialog will appear. This date and assign to fields will be automatically selected. Click OK to send to the next stage.

Reliance System - PPAP E-mail Notifications Upon receipt and review by Rheem PPAP requirements will be defined and the PPAP returned to the supplier for completion. Automatic notification will be sent via e-mail to the affected supplier. The e-mail will contain a URL link to the document itself in Reliance.

Reliance System - PPAP PPAP Requirements Supplier Input Phase After Rheem Review the PPAP will be sent back to you. You will receive a notification through email. The marked check boxes and additional information will define PPAP requirements. Attach each required document under the “Information Attachments” section.

Reliance System - PPAP Attaching a document Document Body Section Attaching documents: Click the Attachment icon button Browse for the appropriate file. Click Attach File button You should see the file in the area for attachments. 1. 4. 2. 3

Reliance System - PPAP Moving it forward At the top of the document you will see the phase tracker. The phase with the red arrow above it is the current phase. The next phase available is the “Supplier PPAP Approval” phase, which is indicated by a blue outline. To send it forward: Click the “Supplier PPAP Approval” phase on the phase In the next screen, if all the information looks correct press the green “OK” button Rheem will receive automatic notification via email

Reliance System - PPAP If PPAP Is Returned.. If the PPAP is “not accepted”, the supplier will receive a returned email stating that the PPAP needs to be revised for completion. The supplier must log back in to Reliance, read the comments, and make the necessary changes to the PPAP. The supplier must re-attach the revised PPAP documents and move it forward again for completion.

Reliance System – PPAP PPAP Completed Once the PPAP is approved and moved to completion, the information is stored historically in Reliance.